| | 09800HB2990ham001 | - 2 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | (2) the parcel was purchased or otherwise conveyed to |
| 2 | | the taxpayer after January 1 of the taxable year; |
| 3 | | (3) the parcel was purchased by the holder of a |
| 4 | | mortgage on the foreclosed parcel that was the subject of a |
| 5 | | judicial sale which occurred after January 1, 2008, or the |
| 6 | | parcel was ordered by a court of competent jurisdiction to |
| 7 | | be deconverted in accordance with the provisions governing |
| 8 | | distressed condominiums as provided in the Condominium |
| 9 | | Property Act; |
| 10 | | (4) the transfer from the holder of the prior mortgage |
| 11 | | to the taxpayer was an arm's length transaction, in that |
| 12 | | the taxpayer has no legal relationship to the holder of the |
| 13 | | prior mortgage; |
| 14 | | (5) an existing, residential dwelling structure of no |
| 15 | | more than 6 units in counties with a population of |
| 16 | | 3,000,000 or more, or 12 units elsewhere in the State, is |
| 17 | | present on the parcel, and that residential dwelling was |
| 18 | | unoccupied at the time of conveyance, or the parcel, |
| 19 | | including any number of units, was ordered by a court of |
| 20 | | competent jurisdiction to be deconverted in accordance |
| 21 | | with the provisions governing distressed condominiums as |
| 22 | | provided in the Condominium Property Act; |
| 23 | | (6) the taxpayer does not occupy or intend to occupy |
| 24 | | the residential dwelling as his or her principal residence; |
| 25 | | (7) the taxpayer immediately secures the residential |
| 26 | | dwelling in accordance with the requirements of this |
|
| | 09800HB2990ham001 | - 3 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | Section; |
| 2 | | (8) the rehabilitation completed by the taxpayer is |
| 3 | | sufficient to bring the improvements into compliance with |
| 4 | | Housing Quality Standards employed by the U.S. Department |
| 5 | | of Housing and Urban Development, along with all State and |
| 6 | | federal requirements, including without limitation lead |
| 7 | | based paint and asbestos remediation; |
| 8 | | (9) rehabilitation is completed within 18 months of |
| 9 | | conveyance; |
| 10 | | (10) the parcel is clear of unreleased liens and has no |
| 11 | | outstanding tax liabilities attached against it; and |
| 12 | | (11) after rehabilitation is complete, the taxpayer |
| 13 | | charges no more for rent than the fair market rent for the |
| 14 | | life of the benefit conferred by this Section. "Fair Market |
| 15 | | Rent" means the annual determination made by the U.S. |
| 16 | | Department of Housing and Urban Development of the maximum |
| 17 | | allowable rent in each area that can be charged under its |
| 18 | | rental assistance programs. The Illinois Housing |
| 19 | | Development Authority (the "Authority") shall make this |
| 20 | | information available on its website. |
| 21 | | (b) For purposes of this Section, "secure" means that: |
| 22 | | (1) all doors and windows are closed and secured using: |
| 23 | | secure doors; windows without broken or cracked panes; |
| 24 | | commercial-quality metal security panels filled with |
| 25 | | like-kind material as the surrounding wall; or plywood |
| 26 | | installed and secured in accordance with local ordinance; |
|
| | 09800HB2990ham001 | - 4 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | at least one building entrance shall be accessible from the |
| 2 | | exterior and secured with a door that is locked to allow |
| 3 | | access only to authorized persons; |
| 4 | | (2) all grass and weeds on the vacant residential |
| 5 | | property are maintained below 10 inches in height, unless a |
| 6 | | local ordinance imposes a lower height; |
| 7 | | (3) debris, trash, and litter on any portion of the |
| 8 | | exterior of the vacant residential property is removed in |
| 9 | | compliance with local ordinance; |
| 10 | | (4) fences, gates, stairs and steps that lead to the |
| 11 | | main entrance of the building are maintained in a |
| 12 | | structurally sound and reasonable manner; |
| 13 | | (5) the property is winterized when appropriate; |
| 14 | | (6) the exterior of the improvements are reasonably |
| 15 | | maintained to ensure the safety of passersby; and |
| 16 | | (7) vermin and pests are regularly exterminated on the |
| 17 | | exterior and interior of the property. |
| 18 | | (c) In order to be eligible for and receive benefits |
| 19 | | conferred by this Section, and in addition to any information |
| 20 | | required in rules promulgated by the Authority, the taxpayer |
| 21 | | must submit the following information to the Authority for |
| 22 | | review: |
| 23 | | (1) the owner's name and, if the owner is a |
| 24 | | corporation, limited liability company, or any |
| 25 | | organization organized under the laws of the State of |
| 26 | | Illinois, a Certificate of Good Standing issued by the |
|
| | 09800HB2990ham001 | - 5 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | Secretary of State; |
| 2 | | (2) the postal address and permanent index number of |
| 3 | | the parcel; |
| 4 | | (3) a Certificate of Sale indicating that the judicial |
| 5 | | foreclosure sale of the parcel occurred after January 1, |
| 6 | | 2008; |
| 7 | | (4) a deed or other instrument conveying the parcel |
| 8 | | from the foreclosure sale purchaser to the current owner; |
| 9 | | (5) a bid from a licensed, insured, and bonded |
| 10 | | contractor for the proposed scope of work, and a cost |
| 11 | | estimate by an unrelated third party; |
| 12 | | (6) evidence that the parcel is clear of unreleased |
| 13 | | liens and has no outstanding tax liabilities attached |
| 14 | | against it; and |
| 15 | | (7) a sworn statement indicating that all conditions of |
| 16 | | this Section have been met, including that the rent will |
| 17 | | not exceed fair market rent, as defined in this Section, |
| 18 | | and that the property will be maintained in keeping with |
| 19 | | housing quality standards for the life of the assessment |
| 20 | | freeze period; and |
| 21 | | (8) additional information as set forth in rules |
| 22 | | adopted by the Authority. |
| 23 | | The Authority shall notify the taxpayer of whether or not |
| 24 | | the parcel meets the requirements of this Section. If the |
| 25 | | parcel does not meet the requirements of this Section, the |
| 26 | | Authority shall provide written notice of all deficiencies to |
|
| | 09800HB2990ham001 | - 6 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | the taxpayer, who will then have 14 days from the date of |
| 2 | | notification to provide supplemental information that shows |
| 3 | | compliance with this Section. If the taxpayer does not exercise |
| 4 | | this right to cure the deficiency, or if the information |
| 5 | | submitted, in the sole judgment of the Authority, is |
| 6 | | insufficient to meet the requirements of this Section, the |
| 7 | | Authority shall provide a full written explanation of the |
| 8 | | reasons for denial. A taxpayer may subsequently reapply for the |
| 9 | | benefit if the deficiencies are cured at a later date. |
| 10 | | (d) If a parcel meets the requirements of this Section, the |
| 11 | | Authority or its authorized agent shall arrange to physically |
| 12 | | inspect the improvements on the parcel. Only parcels in need of |
| 13 | | substantial rehabilitation are eligible for the benefit |
| 14 | | conferred by this Section. "Substantial rehabilitation" must |
| 15 | | minimally include the replacement or renovation of at least 2 |
| 16 | | primary building systems. Although the cost of each system may |
| 17 | | vary, the combined expenditure for the systems must be at least |
| 18 | | $5 per square foot, adjusted by the Consumer Price Index for |
| 19 | | All Urban Consumers, as published annually by the U.S. |
| 20 | | Department of Labor. The following are the primary building |
| 21 | | systems, together with their related rehabilitations, |
| 22 | | specifically approved for this program: |
| 23 | | (1) Electrical. All electrical work must comply with |
| 24 | | applicable codes, it may consist of a combination of any of |
| 25 | | the following alternatives: |
| 26 | | (A) installing individual equipment and appliance |
|
| | 09800HB2990ham001 | - 7 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | branch circuits as required by code (the minimum being |
| 2 | | a kitchen appliance branch circuit); |
| 3 | | (B) installing a new emergency service, including |
| 4 | | emergency lighting with all associated conduit and |
| 5 | | wiring; |
| 6 | | (C) rewiring all existing feeder conduits ("home |
| 7 | | runs") from the main switchgear to apartment area |
| 8 | | distribution panels; |
| 9 | | (D) installing new in-wall conduit for |
| 10 | | receptacles, switches, appliances,equipment, and |
| 11 | | fixtures; |
| 12 | | (E) replacing power wiring for receptacles, |
| 13 | | switches, appliances, equipment and fixtures; |
| 14 | | (F) installing new light fixtures throughout the |
| 15 | | building including closets and central areas; |
| 16 | | (G) replacing, adding, or doing work as necessary |
| 17 | | to bring all receptacles, switches, and other |
| 18 | | electrical devices into code compliance; |
| 19 | | (H) installing a new main service, including |
| 20 | | conduit, cables into the building, and main disconnect |
| 21 | | switch; |
| 22 | | (I) installing new distribution panels, including |
| 23 | | all panel wiring, terminals, circuit breakers, and all |
| 24 | | other panel devices. |
| 25 | | (2) Heating. All heating work must comply with |
| 26 | | applicable codes, it may consist of a combination of any of |
|
| | 09800HB2990ham001 | - 8 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | the following alternatives: |
| 2 | | (A) installing a new system to replace one of the |
| 3 | | following heat distribution systems: |
| 4 | | (i) piping and heat radiating units, including |
| 5 | | new main line venting and radiator venting; or |
| 6 | | (ii) duct work, diffusers, and cold air |
| 7 | | returns; or |
| 8 | | (iii) any other type of existing heat |
| 9 | | distribution and radiation/diffusion components; |
| 10 | | (B) installing a new system to replace one of the |
| 11 | | following heat generating units: |
| 12 | | (i) hot water/steam boiler; |
| 13 | | (ii) gas furnace; or |
| 14 | | (iii) any other type of existing heat |
| 15 | | generating unit. |
| 16 | | (3) Plumbing. All plumbing work must comply with |
| 17 | | applicable codes.
Replace all or a part of the in-wall |
| 18 | | supply and waste plumbing; however, main supply
risers, |
| 19 | | waste stacks and vents, and code-conforming waste lines |
| 20 | | need not
be replaced. |
| 21 | | (4) Roofing. All roofing work must comply with |
| 22 | | applicable codes, it may consist of a combination of any of |
| 23 | | the following alternatives: |
| 24 | | (A) replacing all rotted roof deck and insulation; |
| 25 | | (B) replacing or repairing leaking roof membrane |
| 26 | | (10% is suggested
minimum replacement of membrane); |
|
| | 09800HB2990ham001 | - 9 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | restoration of the entire roof is an acceptable |
| 2 | | substitute for membrane replacement. |
| 3 | | (5) Exterior doors and windows. Replace the exterior |
| 4 | | doors and windows. Renovation of ornate entry doors is an |
| 5 | | acceptable substitute for replacement. |
| 6 | | (6) Floors, walls, and ceilings. Finishes must be |
| 7 | | replaced or covered over with new material. The following |
| 8 | | items define replacement or covering materials acceptable |
| 9 | | under these guidelines: |
| 10 | | (A) floors must have new carpeting, vinyl tile, |
| 11 | | ceramic, refurbished wood finish, or a similar |
| 12 | | substitute; |
| 13 | | (B) walls must have new drywall, including joint |
| 14 | | taping and painting; |
| 15 | | (C) new ceilings must be either drywall, suspended |
| 16 | | type, or a similar substitute. |
| 17 | | (7) Exterior walls. |
| 18 | | (A) replace loose or crumbling mortar and masonry |
| 19 | | with new material; |
| 20 | | (B) replace or paint wall siding and trim as |
| 21 | | needed; |
| 22 | | (C) bring porches and balconies to a sound |
| 23 | | condition; or |
| 24 | | (D) any combination of (A), (B), and (C). |
| 25 | | (8) Elevators. Where applicable, at least 4 of the |
| 26 | | following 7 alternatives must be accomplished: |
|
| | 09800HB2990ham001 | - 10 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | (A) replace or rebuild the machine room controls |
| 2 | | and refurbish the elevator machine (or equivalent |
| 3 | | mechanisms in the case of hydraulic elevators); |
| 4 | | (B) replace hoistway electro-mechanical items |
| 5 | | including: ropes, switches, limits, buffers, levelers, |
| 6 | | and deflector sheaves (or equivalent mechanisms in the |
| 7 | | case of hydraulic elevators); |
| 8 | | (C) replace hoistway wiring; |
| 9 | | (D) replace door operators and linkage; |
| 10 | | (E) replace door panels at each opening; |
| 11 | | (F) replace hall stations, car stations, and |
| 12 | | signal fixtures; |
| 13 | | (G) rebuild the car shell and refinish the |
| 14 | | interior. |
| 15 | | (9) Health and safety. |
| 16 | | (A) install or replace fire suppression systems; |
| 17 | | (B) install or replace security systems; and |
| 18 | | (C) environmental remediation of lead-based paint, |
| 19 | | asbestos, leaking underground storage tanks, or radon. |
| 20 | | (10) Energy conservation improvements undertaken to |
| 21 | | limit the amount of solar energy absorbed by a building's |
| 22 | | roof or to reduce energy use for the property, including |
| 23 | | any of the following activities: |
| 24 | | (A) installing or replacing reflective roof |
| 25 | | coatings (flat roofs); |
| 26 | | (B) installing or replacing R-38 roof insulation; |
|
| | 09800HB2990ham001 | - 11 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | (C) installing or replacing R-19 perimeter wall |
| 2 | | insulation; |
| 3 | | (D) installing or replacing insulated entry doors; |
| 4 | | (E) installing or replacing Low E, insulated |
| 5 | | windows; |
| 6 | | (F) installing or replacing low-flow plumbing |
| 7 | | fixtures; |
| 8 | | (G) installing or replacing 90% sealed combustion |
| 9 | | heating systems; |
| 10 | | (H) installing or replacing direct exhaust hot |
| 11 | | water heaters |
| 12 | | (I) installing or replacing mechanical ventilation |
| 13 | | to exterior for kitchens and baths; |
| 14 | | (J) installing or replacing Energy Star |
| 15 | | appliances; |
| 16 | | (K) installing low VOC interior paints on interior |
| 17 | | finishes |
| 18 | | (L) installing or replacing fluorescent lighting |
| 19 | | in common areas; or |
| 20 | | (M) installing or replacing grading and |
| 21 | | landscaping to promote on-site water retention. |
| 22 | | (e) Parcels approved under this Section shall be inspected |
| 23 | | by the Authority or its authorized agent again upon written |
| 24 | | notification by the taxpayer that rehabilitation is complete. |
| 25 | | The Authority, by rule, may require proof in the form of a |
| 26 | | contractor's sworn statement or other third party |
|
| | 09800HB2990ham001 | - 12 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | certification that the rehabilitation was completed. Upon such |
| 2 | | notification, the Authority or its authorized agent shall |
| 3 | | inspect the parcel to ensure that it meets the minimum |
| 4 | | requirements of Housing Quality Standards employed by the U.S. |
| 5 | | Department of Housing and Urban Development. No parcel will be |
| 6 | | eligible for the benefit conferred by this Section unless: |
| 7 | | (1) the Substantial Rehabilitation was completed |
| 8 | | within 18 months of acquisition; and |
| 9 | | (2) the improvements on the parcel for which the |
| 10 | | benefit conferred by this Section are sought were inspected |
| 11 | | by the Authority or its authorized agent prior to |
| 12 | | rehabilitation and the Authority issued written |
| 13 | | notification from the Authority that it met the |
| 14 | | requirements of this Section with regard to that |
| 15 | | inspection; |
| 16 | | (3) the improvements on the parcel for which the |
| 17 | | benefit conferred by this Section are sought were inspected |
| 18 | | by the Authority or its authorized agent after |
| 19 | | rehabilitation and the improvements met the requirements |
| 20 | | of this Section with regard to that inspection, including |
| 21 | | that the improvements met Housing Quality Standards |
| 22 | | requirements. |
| 23 | | (f) The Authority shall provide notification of the outcome |
| 24 | | of the final inspection to the owner and the chief county |
| 25 | | assessor. The reduction outlined in this Section shall be |
| 26 | | activated when the owner provides notice to the chief county |
|
| | 09800HB2990ham001 | - 13 - | LRB098 11021 HLH 43131 a |
|
|
| 1 | | assessment officer and county clerk that rehabilitation is |
| 2 | | complete and meets the required standards. Additional details |
| 3 | | on the activation process shall be provided in rules adopted by |
| 4 | | the Authority. |
| 5 | | (g) An owner is eligible to apply for the benefit conferred |
| 6 | | by this Section beginning 18 months after the effective date of |
| 7 | | this Section and through December 31, 2017. If approved, the |
| 8 | | reduction will be effective for the current taxable year, which |
| 9 | | will be reflected in the tax bill issued in the following |
| 10 | | taxable year. |
| 11 | | (h) The reduction outlined in this Section shall continue |
| 12 | | for a period of 5 years, and may not be extended or renewed for |
| 13 | | any additional period. |
| 14 | | (i) At the completion of the assessment freeze period |
| 15 | | described here, the entire parcel will be assessed as otherwise |
| 16 | | provided in this Code. |
| 17 | | (j) The Illinois Housing Development Authority may adopt |
| 18 | | rules and charge a reasonable application fee in connection |
| 19 | | with this Section. |
| 20 | | (k) The benefit conferred by this Section will be effective |
| 21 | | in the event of a transfer of ownership during the period of |
| 22 | | the assessment freeze, so long as all requirements of this |
| 23 | | Section continue to be met.
|
| 24 | | Section 99. Effective date. This Act takes effect January |
| 25 | | 1, 2014.".
|