| 7 | Sec. 5-1062. Stormwater management.
| ||||||||||||||||||||||||||
| 8 | (a) The purpose of this Section is to allow management and | ||||||||||||||||||||||||||
| 9 | mitigation of the
effects of urbanization on stormwater | ||||||||||||||||||||||||||
| 10 | drainage in metropolitan counties located
in the area served by | ||||||||||||||||||||||||||
| 11 | the Northeastern Illinois Planning Commission, and
references | ||||||||||||||||||||||||||
| 12 | to "county" in this Section shall apply only to those counties.
| ||||||||||||||||||||||||||
| 13 | This Section shall not apply to any county with a population in | ||||||||||||||||||||||||||
| 14 | excess of
1,500,000, except as provided in subsection (c). The | ||||||||||||||||||||||||||
| 15 | purpose of this Section
shall be achieved by:
| ||||||||||||||||||||||||||
| 16 | (1) consolidating the existing stormwater management | ||||||||||||||||||||||||||
| 17 | framework into a
united, countywide structure;
| ||||||||||||||||||||||||||
| 18 | (2) setting minimum standards for floodplain and | ||||||||||||||||||||||||||
| 19 | stormwater management;
and
| ||||||||||||||||||||||||||
| 20 | (3) preparing a countywide plan for the management of | ||||||||||||||||||||||||||
| 21 | stormwater runoff,
including the management of natural and | ||||||||||||||||||||||||||
| 22 | man-made drainageways. The countywide
plan may incorporate | ||||||||||||||||||||||||||
| 23 | watershed plans.
| ||||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | (b) A stormwater management planning committee shall be | ||||||
| 2 | established by
county board resolution, with its membership | ||||||
| 3 | consisting of equal numbers of
county board and municipal | ||||||
| 4 | representatives from each county board
district, and such other | ||||||
| 5 | members as may be determined by the county and
municipal | ||||||
| 6 | members. However, if the county has more than 6 county board
| ||||||
| 7 | districts, the county board may by ordinance divide the county | ||||||
| 8 | into not
less than 6 areas of approximately equal population, | ||||||
| 9 | to be used instead of
county board districts for the purpose of | ||||||
| 10 | determining representation on the
stormwater management | ||||||
| 11 | planning committee.
| ||||||
| 12 | The county board members shall be appointed by the chairman | ||||||
| 13 | of the county
board. Municipal members from each county board | ||||||
| 14 | district or other
represented area shall be appointed by a | ||||||
| 15 | majority vote of the mayors of
those municipalities which have | ||||||
| 16 | the greatest percentage of their respective
populations | ||||||
| 17 | residing in such county board district or other represented
| ||||||
| 18 | area. All municipal and county board representatives shall be | ||||||
| 19 | entitled
to a vote; the other members shall be nonvoting | ||||||
| 20 | members, unless authorized
to vote by the unanimous consent of | ||||||
| 21 | the municipal and county board
representatives. A municipality | ||||||
| 22 | that is located in more than one county may
choose, at the time | ||||||
| 23 | of formation of the stormwater management planning
committee | ||||||
| 24 | and based on watershed boundaries, to participate in the
| ||||||
| 25 | stormwater management planning program of either or both of the | ||||||
| 26 | counties.
Subcommittees of the stormwater management planning | ||||||
| |||||||
| |||||||
| 1 | committee may be
established to serve a portion of the county | ||||||
| 2 | or a particular drainage basin
that has similar stormwater | ||||||
| 3 | management needs. The stormwater management
planning committee | ||||||
| 4 | shall adopt by-laws, by a majority vote of the county and
| ||||||
| 5 | municipal members, to govern the functions of the committee and | ||||||
| 6 | its
subcommittees. Officers of the committee shall include a | ||||||
| 7 | chair and vice chair,
one of whom shall be a county | ||||||
| 8 | representative and one a municipal
representative.
| ||||||
| 9 | The principal duties of the committee shall be to develop a | ||||||
| 10 | stormwater
management plan for presentation to and approval by | ||||||
| 11 | the county board, and
to direct the plan's implementation and | ||||||
| 12 | revision. The committee may retain
engineering, legal and | ||||||
| 13 | financial advisors and inspection personnel. The
committee | ||||||
| 14 | shall meet at least quarterly and shall hold at least one | ||||||
| 15 | public
meeting during the preparation of the plan and prior to | ||||||
| 16 | its submittal to the
county board.
| ||||||
| 17 | (c) In the preparation of a stormwater management plan, a | ||||||
| 18 | county
stormwater management planning committee shall | ||||||
| 19 | coordinate the planning
process with each adjoining county to | ||||||
| 20 | ensure that recommended stormwater
projects will have no | ||||||
| 21 | significant impact on the levels or flows of
stormwaters in | ||||||
| 22 | inter-county watersheds or on the capacity of existing and
| ||||||
| 23 | planned stormwater retention facilities. An adopted stormwater | ||||||
| 24 | management
plan shall identify steps taken by the county to | ||||||
| 25 | coordinate the development
of plan recommendations with | ||||||
| 26 | adjoining counties.
| ||||||
| |||||||
| |||||||
| 1 | (d) Before the stormwater management planning committee | ||||||
| 2 | recommends to the
county board a stormwater management plan for | ||||||
| 3 | the county or a portion thereof,
it shall submit the plan to | ||||||
| 4 | the Office of Water Resources of the Department of Natural | ||||||
| 5 | Resources and to the Northeastern Illinois Planning
Commission | ||||||
| 6 | for review and recommendations. The Office
and the Commission, | ||||||
| 7 | in reviewing the plan, shall consider such factors as
impacts | ||||||
| 8 | on the levels or flows in rivers and streams and the cumulative | ||||||
| 9 | effects
of stormwater discharges on flood levels. The Office of | ||||||
| 10 | Water Resources shall determine whether the
plan or ordinances | ||||||
| 11 | enacted to implement the plan complies with the requirements
of | ||||||
| 12 | subsection (f). Within a period not to exceed 60 days, the | ||||||
| 13 | review comments
and recommendations shall be submitted to the | ||||||
| 14 | stormwater management planning
committee for consideration. | ||||||
| 15 | Any amendments to the plan shall be
submitted to the Office and | ||||||
| 16 | the Commission for review.
| ||||||
| 17 | (e) Prior to recommending the plan to the county board, the | ||||||
| 18 | stormwater
management planning committee shall hold at least | ||||||
| 19 | one public hearing thereon
and shall afford interested persons | ||||||
| 20 | an opportunity to be heard. The hearing
shall be held in the | ||||||
| 21 | county seat. Notice of the hearing shall be published at
least | ||||||
| 22 | once no less than 15 days in advance thereof in a newspaper of | ||||||
| 23 | general
circulation published in the county. The notice shall | ||||||
| 24 | state the time and place
of the hearing and the place where | ||||||
| 25 | copies of the proposed plan will be
accessible for examination | ||||||
| 26 | by interested parties. If an affected municipality
having a | ||||||
| |||||||
| |||||||
| 1 | stormwater management plan adopted by ordinance wishes to | ||||||
| 2 | protest the
proposed county plan provisions, it shall appear at | ||||||
| 3 | the hearing and submit in
writing specific proposals to the | ||||||
| 4 | stormwater management planning committee.
After consideration | ||||||
| 5 | of the matters raised at the hearing, the committee may
amend | ||||||
| 6 | or approve the plan and recommend it to the county board for | ||||||
| 7 | adoption.
| ||||||
| 8 | The county board may enact the proposed plan by ordinance. | ||||||
| 9 | If the
proposals for modification of the plan made by an | ||||||
| 10 | affected municipality having
a stormwater management plan are | ||||||
| 11 | not included in the proposed county plan,
and the municipality | ||||||
| 12 | affected by the plan opposes adoption of the county
plan by | ||||||
| 13 | resolution of its corporate authorities, approval of
the county | ||||||
| 14 | plan shall require an affirmative vote of at least two-thirds | ||||||
| 15 | of the
county board members present and voting. If the county | ||||||
| 16 | board wishes to
amend the county plan, it shall submit in | ||||||
| 17 | writing specific proposals to the
stormwater management | ||||||
| 18 | planning committee. If the proposals are not
approved by the | ||||||
| 19 | committee, or are opposed by resolution of the corporate
| ||||||
| 20 | authorities of an affected municipality having a municipal | ||||||
| 21 | stormwater
management plan, amendment of the plan shall require | ||||||
| 22 | an affirmative vote of
at least two-thirds of the county board | ||||||
| 23 | members present and voting.
| ||||||
| 24 | (f) The county board may prescribe by ordinance reasonable | ||||||
| 25 | rules and
regulations for floodplain management and for | ||||||
| 26 | governing the location,
width, course and release rate of all | ||||||
| |||||||
| |||||||
| 1 | stormwater runoff channels, streams
and basins in the county, | ||||||
| 2 | in accordance with the adopted stormwater
management plan. | ||||||
| 3 | These rules and regulations shall, at a minimum, meet
the | ||||||
| 4 | standards for floodplain management established by the Office | ||||||
| 5 | of Water Resources and
the requirements of the Federal | ||||||
| 6 | Emergency Management Agency for participation
in the National | ||||||
| 7 | Flood Insurance Program.
| ||||||
| 8 | (g) For the purposes of implementing this Section and for | ||||||
| 9 | the development, design, planning, construction, operation, | ||||||
| 10 | and maintenance of stormwater facilities provided for in In | ||||||
| 11 | accordance with, and if recommended in, the adopted stormwater
| ||||||
| 12 | management plan, a the county board that has established a | ||||||
| 13 | stormwater management planning committee pursuant to this | ||||||
| 14 | Section or has participated in a stormwater management planning | ||||||
| 15 | process may adopt a schedule of fees
applicable to all real | ||||||
| 16 | property within the county which benefits from the county's | ||||||
| 17 | stormwater management facilities and activities, and as may be | ||||||
| 18 | necessary to mitigate the effects of increased stormwater | ||||||
| 19 | runoff
resulting from new development and redevelopment. The | ||||||
| 20 | total amount of the fees assessed must bear a reasonable | ||||||
| 21 | relationship to the actual costs of the county in the | ||||||
| 22 | preparation, administration, and implementation of the shall | ||||||
| 23 | not exceed the cost of
satisfying the onsite stormwater | ||||||
| 24 | retention or detention requirements of the adopted stormwater | ||||||
| 25 | management plan, construction and maintenance of related | ||||||
| 26 | facilities, enforcement of any ordinances adopted pursuant | ||||||
| |||||||
| |||||||
| 1 | thereto, and management of the runoff from the property. The | ||||||
| 2 | individual fees must bear a reasonable relationship to the | ||||||
| 3 | portion of the cost to the county of managing the runoff from | ||||||
| 4 | the property. The fees shall be used to finance
activities | ||||||
| 5 | undertaken by the county or its included municipalities to
| ||||||
| 6 | mitigate the effects of urban stormwater runoff by providing | ||||||
| 7 | and maintaining regional
stormwater collection, retention, or | ||||||
| 8 | detention, and treatment facilities and improving water bodies | ||||||
| 9 | impacted by stormwater runoff, as identified in the county
| ||||||
| 10 | plan. In establishing, maintaining, or replacing the | ||||||
| 11 | facilities, the county shall not duplicate facilities operated | ||||||
| 12 | by other governmental bodies within its corporate boundaries. | ||||||
| 13 | The schedule of fees established by the county board shall | ||||||
| 14 | include a procedure for a full or partial fee waiver for | ||||||
| 15 | property owners who have taken actions or put in place | ||||||
| 16 | facilities that reduce or eliminate the cost to the county of | ||||||
| 17 | providing stormwater management services to their property, | ||||||
| 18 | with a preference for facilities that reduce the volume, | ||||||
| 19 | temperature, velocity, and pollutant load of the stormwater | ||||||
| 20 | managed by the county, such as systems that infiltrate, | ||||||
| 21 | evapotranspirate, or harvest stormwater for reuse, known as | ||||||
| 22 | "green infrastructure." In exercising this authority, the | ||||||
| 23 | county shall give land owners at least 2 years' notice of the | ||||||
| 24 | fee during which time the county shall provide education on | ||||||
| 25 | green infrastructure practices and an opportunity to take | ||||||
| 26 | action to reduce or eliminate the fee. All such fees collected | ||||||
| |||||||
| |||||||
| 1 | by the county shall be held in a separate fund,
and shall be | ||||||
| 2 | expended only in the watershed within which they were | ||||||
| 3 | collected. The county may enter into intergovernmental | ||||||
| 4 | agreements with other government bodies for the joint | ||||||
| 5 | administration of stormwater management and the collection of | ||||||
| 6 | the fees authorized in this Section.
| ||||||
| 7 | A fee schedule authorized by this subsection shall not be | ||||||
| 8 | adopted unless (i) at least part of the county has been | ||||||
| 9 | declared by a presidential proclamation after July 1, 1986, to | ||||||
| 10 | be a disaster area as a result of flooding; (ii) a referendum | ||||||
| 11 | has been passed approving a stormwater tax as provided in | ||||||
| 12 | subsection (h) of this Section; or (iii) the question of the | ||||||
| 13 | adoption of a fee schedule with the same limit as the | ||||||
| 14 | authorized stormwater tax has been approved in a referendum by | ||||||
| 15 | a majority of those voting on the question. | ||||||
| 16 | (h) In the alternative, the For the purpose of implementing | ||||||
| 17 | this Section and for the
development, design, planning, | ||||||
| 18 | construction, operation and maintenance of
stormwater | ||||||
| 19 | facilities provided for in the stormwater management plan, a
| ||||||
| 20 | county board that has established a stormwater management | ||||||
| 21 | planning
committee pursuant to this Section may cause an annual | ||||||
| 22 | tax of not to exceed
0.20% of the value, as equalized or | ||||||
| 23 | assessed by the Department of Revenue,
of all taxable property | ||||||
| 24 | in the county to be levied upon all the taxable
property in the | ||||||
| 25 | county. The tax shall be in addition to all other taxes
| ||||||
| 26 | authorized by law to be levied and collected in the county and | ||||||
| |||||||
| |||||||
| 1 | shall be in
addition to the maximum tax rate authorized by law | ||||||
| 2 | for general county
purposes. The 0.20% limitation provided in | ||||||
| 3 | this Section may be increased
or decreased by referendum in | ||||||
| 4 | accordance with the provisions of Sections
18-120, 18-125, and | ||||||
| 5 | 18-130 of the Property Tax Code.
| ||||||
| 6 | Any revenues generated as a result of ownership or | ||||||
| 7 | operation of facilities
or land acquired with the tax funds | ||||||
| 8 | collected pursuant to this subsection
(h) shall be held in a | ||||||
| 9 | separate fund and be used either to abate such
property tax or | ||||||
| 10 | for implementing this Section.
| ||||||
| 11 | If a county adopts a fee schedule and has existing debt | ||||||
| 12 | repayments to make, the remainder of that debt may be paid with | ||||||
| 13 | proceeds from a tax imposed for stormwater management purposes. | ||||||
| 14 | However, unless at least part of the county has been | ||||||
| 15 | declared after
July 1, 1986 by presidential proclamation to be | ||||||
| 16 | a disaster area as a result
of flooding, the tax authorized by | ||||||
| 17 | this subsection (h) shall not be levied
until the question of | ||||||
| 18 | its adoption, either for a specified period or
indefinitely, | ||||||
| 19 | has been submitted to the electors thereof and approved by a
| ||||||
| 20 | majority of those voting on the question. This question may be | ||||||
| 21 | submitted
at any election held in the county after the adoption | ||||||
| 22 | of a resolution by
the county board providing for the | ||||||
| 23 | submission of the question to the
electors of the county. The | ||||||
| 24 | county board shall certify the resolution and
proposition to | ||||||
| 25 | the proper election officials, who shall submit the
proposition | ||||||
| 26 | at an election in accordance with the general election law. If
| ||||||
| |||||||
| |||||||
| 1 | a majority of the votes cast on the question is in favor of the | ||||||
| 2 | levy of
the tax, it may thereafter be levied in the county for | ||||||
| 3 | the specified
period or indefinitely, as provided in the | ||||||
| 4 | proposition. The question shall
be put in substantially the | ||||||
| 5 | following form:
| ||||||
| 6 | -------------------------------------------------------------
| ||||||
| 7 | Shall an annual tax be levied
| ||||||
| 8 | for stormwater management purposes YES
| ||||||
| 9 | (for a period of not more than
| ||||||
| 10 | ...... years) at a rate not exceeding ------------------
| ||||||
| 11 | .....% of the equalized assessed
| ||||||
| 12 | value of the taxable property of NO
| ||||||
| 13 | ........ County?
| ||||||
| 14 | -------------------------------------------------------------
| ||||||
| 15 | (i) Upon the creation and implementation of a county | ||||||
| 16 | stormwater management
plan, the county may petition the circuit | ||||||
| 17 | court to dissolve any or all drainage
districts created | ||||||
| 18 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
| 19 | which are located entirely within the area of the county | ||||||
| 20 | covered by the plan.
| ||||||
| 21 | However, any active drainage district implementing a plan | ||||||
| 22 | that is
consistent with and at least as stringent as the county | ||||||
| 23 | stormwater
management plan may petition the stormwater | ||||||
| 24 | management planning committee
for exception from dissolution. | ||||||
| 25 | Upon filing of the petition, the committee
shall set a date for | ||||||
| 26 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
| |||||||
| |||||||
| 1 | filing thereof, and the committee shall give at least one | ||||||
| 2 | week's
notice of the hearing in one or more newspapers of | ||||||
| 3 | general circulation
within the district, and in addition shall | ||||||
| 4 | cause a copy of the notice to be
personally served upon each of | ||||||
| 5 | the trustees of the district. At the
hearing, the committee | ||||||
| 6 | shall hear the district's petition and allow the
district | ||||||
| 7 | trustees and any interested parties an opportunity to present | ||||||
| 8 | oral
and written evidence. The committee shall render its | ||||||
| 9 | decision upon the
petition for exception from dissolution based | ||||||
| 10 | upon the best interests of
the residents of the district. In | ||||||
| 11 | the event that the exception is not
allowed, the district may | ||||||
| 12 | file a petition within 30 days of the decision
with the circuit | ||||||
| 13 | court. In that case, the notice and hearing requirements
for | ||||||
| 14 | the court shall be the same as herein provided for the | ||||||
| 15 | committee.
The court shall likewise render its decision of | ||||||
| 16 | whether to dissolve the
district based upon the best interests | ||||||
| 17 | of residents of the district.
| ||||||
| 18 | The dissolution of any drainage district shall not affect | ||||||
| 19 | the obligation
of any bonds issued or contracts entered into by | ||||||
| 20 | the district nor
invalidate the levy, extension or collection | ||||||
| 21 | of any taxes or special
assessments upon the property in the | ||||||
| 22 | former drainage district. All property
and obligations of the | ||||||
| 23 | former drainage district shall be assumed and
managed by the | ||||||
| 24 | county, and the debts of the former drainage district shall
be | ||||||
| 25 | discharged as soon as practicable.
| ||||||
| 26 | If a drainage district lies only partly within a county | ||||||
| |||||||
| |||||||
| 1 | that adopts a
county stormwater management plan, the county may | ||||||
| 2 | petition the circuit
court to disconnect from the drainage | ||||||
| 3 | district that portion of the district
that lies within that | ||||||
| 4 | county. The property of the drainage district within the
| ||||||
| 5 | disconnected area shall be assumed and managed by the county. | ||||||
| 6 | The county shall
also assume a portion of the drainage | ||||||
| 7 | district's debt at the time of
disconnection, based on the | ||||||
| 8 | portion of the value of the taxable property of the
drainage | ||||||
| 9 | district which is located within the area being disconnected.
| ||||||
| 10 | The operations of any drainage district that continues to | ||||||
| 11 | exist in a
county that has adopted a stormwater management plan | ||||||
| 12 | in accordance with
this Section shall be in accordance with the | ||||||
| 13 | adopted plan.
| ||||||
| 14 | (j) Any county that has adopted a county stormwater | ||||||
| 15 | management plan
under this Section may, after 10 days written | ||||||
| 16 | notice to the owner or
occupant, enter upon any lands or waters | ||||||
| 17 | within the county for the purpose
of inspecting stormwater | ||||||
| 18 | facilities or causing the removal of any
obstruction to an | ||||||
| 19 | affected watercourse. The county shall be responsible
for any | ||||||
| 20 | damages occasioned thereby.
| ||||||
| 21 | (k) Upon petition of the municipality, and based on a | ||||||
| 22 | finding of the
stormwater management planning committee, the | ||||||
| 23 | county shall not enforce
rules and regulations adopted by the | ||||||
| 24 | county in any municipality located
wholly or partly within the | ||||||
| 25 | county that has a municipal stormwater
management ordinance | ||||||
| 26 | that is consistent with and at least as stringent as
the county | ||||||
| |||||||
| |||||||
| 1 | plan and ordinance, and is being enforced by the municipal
| ||||||
| 2 | authorities.
| ||||||
| 3 | (l) A county may issue general obligation bonds for | ||||||
| 4 | implementing any
stormwater plan adopted under this Section in | ||||||
| 5 | the manner prescribed in
Section 5-1012; except that the | ||||||
| 6 | referendum requirement of Section 5-1012 shall
not apply to | ||||||
| 7 | bonds issued pursuant to this Section on which the principal | ||||||
| 8 | and
interest are to be paid entirely out of funds generated by | ||||||
| 9 | the taxes and fees
authorized by this Section.
| ||||||
| 10 | (m) The powers authorized by this Section may be | ||||||
| 11 | implemented by the
county board for a portion of the county | ||||||
| 12 | subject to similar stormwater
management needs.
| ||||||
| 13 | (n) The powers and taxes authorized by this Section are in | ||||||
| 14 | addition to the
powers and taxes authorized by Division 5-15; | ||||||
| 15 | in exercising its powers
under this Section, a county shall not | ||||||
| 16 | be subject to the restrictions and
requirements of that | ||||||
| 17 | Division.
| ||||||
| 18 | (o) Pursuant to paragraphs (g) and (i) of Section 6 of | ||||||
| 19 | Article VII of
the Illinois Constitution, this Section | ||||||
| 20 | specifically denies and limits the
exercise of any power which | ||||||
| 21 | is inconsistent herewith by home rule units in
any county with | ||||||
| 22 | a population of less than 1,500,000 in the area served by
the | ||||||
| 23 | Northeastern Illinois Planning Commission. This Section does | ||||||
| 24 | not
prohibit the concurrent exercise of powers consistent | ||||||
| 25 | herewith.
| ||||||
| 26 | (Source: P.A. 88-670, eff. 12-2-94; 89-445, eff. 2-7-96.)
| ||||||
| |||||||
| |||||||
| 1 | (55 ILCS 5/5-1062.2) | ||||||
| 2 | Sec. 5-1062.2. Stormwater management. | ||||||
| 3 | (a) The purpose of this Section is to allow management and | ||||||
| 4 | mitigation of the effects of urbanization on stormwater | ||||||
| 5 | drainage in the metropolitan counties of Madison, St. Clair, | ||||||
| 6 | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone | ||||||
| 7 | and references to "county" in this Section apply only to those | ||||||
| 8 | counties, except that any county that is subject to the | ||||||
| 9 | Illinois General NPDES Permit No. ILR40 (stormwater permit), or | ||||||
| 10 | with one or more municipality partially or fully within its | ||||||
| 11 | borders that is subject to the permit, is authorized to adopt a | ||||||
| 12 | schedule of fees as outlined in subsection (h) of this Section. | ||||||
| 13 | This Section does not apply to any other counties in the State, | ||||||
| 14 | including those located in the area served by the Northeastern | ||||||
| 15 | Illinois Planning Commission that are granted authorities in | ||||||
| 16 | Section 5-1062. The purpose of this Section shall be achieved | ||||||
| 17 | by: | ||||||
| 18 | (1) Consolidating the existing stormwater management
| ||||||
| 19 | framework into a united, countywide structure. | ||||||
| 20 | (2) Setting minimum standards for floodplain and
| ||||||
| 21 | stormwater management. | ||||||
| 22 | (3) Preparing a countywide plan for the management
of | ||||||
| 23 | stormwater runoff, including the management of natural and | ||||||
| 24 | man-made drainageways. The countywide plan may incorporate | ||||||
| 25 | watershed plans. | ||||||
| |||||||
| |||||||
| 1 | (b) A stormwater management planning committee may be | ||||||
| 2 | established by county board resolution, with its membership | ||||||
| 3 | consisting of equal numbers of county board and municipal | ||||||
| 4 | representatives from each county board district, and such other | ||||||
| 5 | members as may be determined by the county and municipal | ||||||
| 6 | members. If the county has more than 6 county board districts, | ||||||
| 7 | however, the county board may by ordinance divide the county | ||||||
| 8 | into not less than 6 areas of approximately equal population, | ||||||
| 9 | to be used instead of county board districts for the purpose of | ||||||
| 10 | determining representation on the stormwater management | ||||||
| 11 | planning committee. | ||||||
| 12 | The county board members shall be appointed by the chairman | ||||||
| 13 | of the county board. Municipal members from each county board | ||||||
| 14 | district or other represented area shall be appointed by a | ||||||
| 15 | majority vote of the mayors of those municipalities that have | ||||||
| 16 | the greatest percentage of their respective populations | ||||||
| 17 | residing in that county board district or other represented | ||||||
| 18 | area. All municipal and county board representatives shall be | ||||||
| 19 | entitled to a vote; the other members shall be nonvoting | ||||||
| 20 | members, unless authorized to vote by the unanimous consent of | ||||||
| 21 | the municipal and county board representatives. A municipality | ||||||
| 22 | that is located in more than one county may choose, at the time | ||||||
| 23 | of formation of the stormwater management planning committee | ||||||
| 24 | and based on watershed boundaries, to participate in the | ||||||
| 25 | stormwater management planning program of either or both of the | ||||||
| 26 | counties. Subcommittees of the stormwater management planning | ||||||
| |||||||
| |||||||
| 1 | committee may be established to serve a portion of the county | ||||||
| 2 | or a particular drainage basin that has similar stormwater | ||||||
| 3 | management needs. The stormwater management planning committee | ||||||
| 4 | shall adopt bylaws, by a majority vote of the county and | ||||||
| 5 | municipal members, to govern the functions of the committee and | ||||||
| 6 | its subcommittees. Officers of the committee shall include a | ||||||
| 7 | chair and vice chair, one of whom shall be a county | ||||||
| 8 | representative and one a municipal representative. | ||||||
| 9 | The principal duties of the committee shall be to develop a | ||||||
| 10 | stormwater management plan for presentation to and approval by | ||||||
| 11 | the county board, and to direct the plan's implementation and | ||||||
| 12 | revision. The committee may retain engineering, legal, and | ||||||
| 13 | financial advisors and inspection personnel. The committee | ||||||
| 14 | shall meet at least quarterly and shall hold at least one | ||||||
| 15 | public meeting during the preparation of the plan and prior to | ||||||
| 16 | its submittal to the county board. The committee may make | ||||||
| 17 | grants to units of local government that have adopted an | ||||||
| 18 | ordinance requiring actions consistent with the stormwater | ||||||
| 19 | management plan and to landowners for the purposes of | ||||||
| 20 | stormwater management, including special projects; use of the | ||||||
| 21 | grant money must be consistent with the stormwater management | ||||||
| 22 | plan. | ||||||
| 23 | The committee shall not have or exercise any power of | ||||||
| 24 | eminent domain.
| ||||||
| 25 | (c) In the preparation of a stormwater management plan, a | ||||||
| 26 | county stormwater management planning committee shall | ||||||
| |||||||
| |||||||
| 1 | coordinate the planning process with each adjoining county to | ||||||
| 2 | ensure that recommended stormwater projects will have no | ||||||
| 3 | significant impact on the levels or flows of stormwaters in | ||||||
| 4 | inter-county watersheds or on the capacity of existing and | ||||||
| 5 | planned stormwater retention facilities. An adopted stormwater | ||||||
| 6 | management plan shall identify steps taken by the county to | ||||||
| 7 | coordinate the development of plan recommendations with | ||||||
| 8 | adjoining counties. | ||||||
| 9 | (d) The stormwater management committee may not enforce any | ||||||
| 10 | rules or regulations that would interfere with (i) any power | ||||||
| 11 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
| 12 | operate, construct, maintain, or improve drainage systems or | ||||||
| 13 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
| 14 | systems used on or by land or a facility used for production | ||||||
| 15 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
| 16 | 105/), except newly constructed buildings and newly installed | ||||||
| 17 | impervious paved surfaces. Disputes regarding an exception | ||||||
| 18 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
| 19 | by the disputing party or parties. | ||||||
| 20 | (e) Before the stormwater management planning committee | ||||||
| 21 | recommends to the county board a stormwater management plan for | ||||||
| 22 | the county or a portion thereof, it shall submit the plan to | ||||||
| 23 | the Office of Water Resources of the Department of Natural | ||||||
| 24 | Resources for review and recommendations. The Office, in | ||||||
| 25 | reviewing the plan, shall consider such factors as impacts on | ||||||
| 26 | the levels or flows in rivers and streams and the cumulative | ||||||
| |||||||
| |||||||
| 1 | effects of stormwater discharges on flood levels. The Office of | ||||||
| 2 | Water Resources shall determine whether the plan or ordinances | ||||||
| 3 | enacted to implement the plan complies with the requirements of | ||||||
| 4 | subsection (f). Within a period not to exceed 60 days, the | ||||||
| 5 | review comments and recommendations shall be submitted to the | ||||||
| 6 | stormwater management planning committee for consideration. | ||||||
| 7 | Any amendments to the plan shall be submitted to the Office for | ||||||
| 8 | review. | ||||||
| 9 | (f) Prior to recommending the plan to the county board, the | ||||||
| 10 | stormwater management planning committee shall hold at least | ||||||
| 11 | one public hearing thereon and shall afford interested persons | ||||||
| 12 | an opportunity to be heard. The hearing shall be held in the | ||||||
| 13 | county seat. Notice of the hearing shall be published at least | ||||||
| 14 | once no less than 15 days in advance of the hearing in a | ||||||
| 15 | newspaper of general circulation published in the county. The | ||||||
| 16 | notice shall state the time and place of the hearing and the | ||||||
| 17 | place where copies of the proposed plan will be accessible for | ||||||
| 18 | examination by interested parties. If an affected municipality | ||||||
| 19 | having a stormwater management plan adopted by ordinance wishes | ||||||
| 20 | to protest the proposed county plan provisions, it shall appear | ||||||
| 21 | at the hearing and submit in writing specific proposals to the | ||||||
| 22 | stormwater management planning committee. After consideration | ||||||
| 23 | of the matters raised at the hearing, the committee may amend | ||||||
| 24 | or approve the plan and recommend it to the county board for | ||||||
| 25 | adoption. | ||||||
| 26 | The county board may enact the proposed plan by ordinance. | ||||||
| |||||||
| |||||||
| 1 | If the proposals for modification of the plan made by an | ||||||
| 2 | affected municipality having a stormwater management plan are | ||||||
| 3 | not included in the proposed county plan, and the municipality | ||||||
| 4 | affected by the plan opposes adoption of the county plan by | ||||||
| 5 | resolution of its corporate authorities, approval of the county | ||||||
| 6 | plan shall require an affirmative vote of at least two-thirds | ||||||
| 7 | of the county board members present and voting. If the county | ||||||
| 8 | board wishes to amend the county plan, it shall submit in | ||||||
| 9 | writing specific proposals to the stormwater management | ||||||
| 10 | planning committee. If the proposals are not approved by the | ||||||
| 11 | committee, or are opposed by resolution of the corporate | ||||||
| 12 | authorities of an affected municipality having a municipal | ||||||
| 13 | stormwater management plan, amendment of the plan shall require | ||||||
| 14 | an affirmative vote of at least two-thirds of the county board | ||||||
| 15 | members present and voting. | ||||||
| 16 | (g) The county board may prescribe by ordinance reasonable | ||||||
| 17 | rules and regulations for floodplain management and for | ||||||
| 18 | governing the location, width, course, and release rate of all | ||||||
| 19 | stormwater runoff channels, streams, and basins in the county, | ||||||
| 20 | in accordance with the adopted stormwater management plan. | ||||||
| 21 | Land, facilities, and drainage district facilities used for | ||||||
| 22 | production agriculture as defined in subsection (d) shall not | ||||||
| 23 | be subjected to regulation by the county board or stormwater | ||||||
| 24 | management committee under this Section for floodplain | ||||||
| 25 | management and for governing location, width, course, | ||||||
| 26 | maintenance, and release rate of stormwater runoff channels, | ||||||
| |||||||
| |||||||
| 1 | streams and basins, or water discharged from a drainage | ||||||
| 2 | district. These rules and regulations shall, at a minimum, meet | ||||||
| 3 | the standards for floodplain management established by the | ||||||
| 4 | Office of Water Resources and the requirements of the Federal | ||||||
| 5 | Emergency Management Agency for participation in the National | ||||||
| 6 | Flood Insurance Program. The Commission may not impose more | ||||||
| 7 | stringent regulations regarding water quality on entities | ||||||
| 8 | discharging in accordance with a valid National Pollution | ||||||
| 9 | Discharge Elimination System permit issued under the | ||||||
| 10 | Environmental Protection Act. | ||||||
| 11 | (h) For the purpose of implementing this Section and for | ||||||
| 12 | the development, design, planning, construction, operation, | ||||||
| 13 | and maintenance of stormwater facilities provided for in In | ||||||
| 14 | accordance with, and if recommended in, the adopted stormwater | ||||||
| 15 | management plan, a the county board that has established a | ||||||
| 16 | stormwater management planning committee pursuant to this | ||||||
| 17 | Section or has participated in a stormwater management planning | ||||||
| 18 | process may adopt a schedule of fees applicable to all real | ||||||
| 19 | property within the county which receives benefit from the | ||||||
| 20 | county's stormwater management facilities and activities, and | ||||||
| 21 | as may be necessary to mitigate the effects of increased | ||||||
| 22 | stormwater runoff resulting from new development and | ||||||
| 23 | redevelopment based on actual costs. The total amount of the | ||||||
| 24 | fees assessed must bear a reasonable relationship to the actual | ||||||
| 25 | costs of the county in the preparation, administration, and | ||||||
| 26 | implementation of the shall not exceed the cost of satisfying | ||||||
| |||||||
| |||||||
| 1 | the onsite stormwater retention or detention requirements of | ||||||
| 2 | the adopted stormwater management plan, construction and | ||||||
| 3 | maintenance of related facilities, enforcement of any | ||||||
| 4 | ordinance adopted pursuant thereto, and management of the | ||||||
| 5 | runoff from the property. The individual fees must bear a | ||||||
| 6 | reasonable relationship to the portion of the cost to the | ||||||
| 7 | county of managing the runoff from the property. The fees shall | ||||||
| 8 | be used to finance activities undertaken by the county or its | ||||||
| 9 | included municipalities to mitigate the effects of urban | ||||||
| 10 | stormwater runoff by providing and maintaining regional | ||||||
| 11 | stormwater collection, retention, or detention, and treatment | ||||||
| 12 | facilities and improving water bodies impacted by stormwater | ||||||
| 13 | runoff, as identified in the county plan. In establishing, | ||||||
| 14 | maintaining, or replacing such facilities, the county shall not | ||||||
| 15 | duplicate facilities operated by other governmental bodies | ||||||
| 16 | within its corporate boundaries. The schedule of fees | ||||||
| 17 | established by the county board shall include a procedure for a | ||||||
| 18 | full or partial fee waiver for property owners who have taken | ||||||
| 19 | actions or put in place facilities that reduce or eliminate the | ||||||
| 20 | cost to the county of providing stormwater management services | ||||||
| 21 | to their property, with a preference for facilities that reduce | ||||||
| 22 | the volume, temperature, velocity, and pollutant load of the | ||||||
| 23 | stormwater managed by the county, such as systems that | ||||||
| 24 | infiltrate, evapotranspirate, or harvest stormwater for reuse, | ||||||
| 25 | known as "green infrastructure." In exercising this authority, | ||||||
| 26 | the county shall give land owners at least 2 years' notice of | ||||||
| |||||||
| |||||||
| 1 | the fee during which time the county shall provide education on | ||||||
| 2 | green infrastructure practices and an opportunity to take | ||||||
| 3 | action to reduce or eliminate the fee. The county board shall | ||||||
| 4 | provide for a credit or reduction in fees for any onsite | ||||||
| 5 | retention, detention, drainage district assessments, or other | ||||||
| 6 | similar stormwater facility that the developer is required to | ||||||
| 7 | construct consistent with the stormwater management ordinance. | ||||||
| 8 | All these fees collected by the county shall be held in a | ||||||
| 9 | separate fund, and shall be expended only in the watershed | ||||||
| 10 | within which they were collected. The county may enter into | ||||||
| 11 | intergovernmental agreements with other government bodies for | ||||||
| 12 | the joint administration of stormwater management and the | ||||||
| 13 | collection of the fees authorized in this Section. | ||||||
| 14 | A fee schedule authorized by this subsection shall not be | ||||||
| 15 | adopted unless (i) at least part of the county has been | ||||||
| 16 | declared by a presidential proclamation after July 1, 1986, to | ||||||
| 17 | be a disaster area as a result of flooding; (ii) a referendum | ||||||
| 18 | has been passed approving a stormwater tax as provided in | ||||||
| 19 | subsection (i) of this Section; or (iii) the question of the | ||||||
| 20 | adoption of a fee schedule with the same limit as the | ||||||
| 21 | authorized stormwater tax has been approved in a referendum by | ||||||
| 22 | a majority of those voting on the question. | ||||||
| 23 | (i) In the alternative, the For the purpose of implementing | ||||||
| 24 | this Section and for the development, design, planning, | ||||||
| 25 | construction, operation, and maintenance of stormwater | ||||||
| 26 | facilities provided for in the stormwater management plan, a | ||||||
| |||||||
| |||||||
| 1 | county board that has established a stormwater management | ||||||
| 2 | planning committee pursuant to this Section may cause an annual | ||||||
| 3 | tax of not to exceed 0.20% of the value, as equalized or | ||||||
| 4 | assessed by the Department of Revenue, of all taxable property | ||||||
| 5 | in the county to be levied upon all the taxable property in the | ||||||
| 6 | county or occupation and use taxes of 1/10 of one cent. The | ||||||
| 7 | property tax shall be in addition to all other taxes authorized | ||||||
| 8 | by law to be levied and collected in the county and shall be in | ||||||
| 9 | addition to the maximum tax rate authorized by law for general | ||||||
| 10 | county purposes. The 0.20% limitation provided in this Section | ||||||
| 11 | may be increased or decreased by referendum in accordance with | ||||||
| 12 | the provisions of Sections 18-120, 18-125, and 18-130 of the | ||||||
| 13 | Property Tax Code (35 ILCS 200/). | ||||||
| 14 | Any revenues generated as a result of ownership or | ||||||
| 15 | operation of facilities or land acquired with the tax funds | ||||||
| 16 | collected pursuant to this subsection shall be held in a | ||||||
| 17 | separate fund and be used either to abate such property tax or | ||||||
| 18 | for implementing this Section. | ||||||
| 19 | If a county adopts a fee schedule and has existing debt | ||||||
| 20 | repayments to make, the remainder of that debt may be paid with | ||||||
| 21 | proceeds from a tax imposed for stormwater management purposes. | ||||||
| 22 | However, the tax authorized by this subsection shall not be | ||||||
| 23 | levied until the question of its adoption, either for a | ||||||
| 24 | specified period or indefinitely, has been submitted to the | ||||||
| 25 | electors thereof and approved by a majority of those voting on | ||||||
| 26 | the question. This question may be submitted at any election | ||||||
| |||||||
| |||||||
| 1 | held in the county after the adoption of a resolution by the | ||||||
| 2 | county board providing for the submission of the question to | ||||||
| 3 | the electors of the county. The county board shall certify the | ||||||
| 4 | resolution and proposition to the proper election officials, | ||||||
| 5 | who shall submit the proposition at an election in accordance | ||||||
| 6 | with the general election law. If a majority of the votes cast | ||||||
| 7 | on the question is in favor of the levy of the tax, it may | ||||||
| 8 | thereafter be levied in the county for the specified period or | ||||||
| 9 | indefinitely, as provided in the proposition. The question | ||||||
| 10 | shall be put in substantially the following form: | ||||||
| 11 | Shall an annual tax be levied
for stormwater management | ||||||
| 12 | purposes (for a period of not more than ..... years) at a | ||||||
| 13 | rate not exceeding
.....% of the equalized assessed
value | ||||||
| 14 | of the taxable property of ..... County?
| ||||||
| 15 | Or this question may be submitted at any election held in the | ||||||
| 16 | county after the adoption of a resolution by the county board | ||||||
| 17 | providing for the submission of the question to the electors of | ||||||
| 18 | the county to authorize use and occupation taxes of 1/10 of one | ||||||
| 19 | cent: | ||||||
| 20 | Shall use and occupation taxes be raised for stormwater | ||||||
| 21 | management purposes (for a period of not more than ..... | ||||||
| 22 | years) at a rate of 1/10 of one cent for taxable goods in | ||||||
| 23 | ..... County? | ||||||
| 24 | Votes shall be recorded as Yes or No.
| ||||||
| 25 | (j) For those counties that adopt a property tax in | ||||||
| 26 | accordance with the provisions in this Section, the stormwater | ||||||
| |||||||
| |||||||
| 1 | management committee shall offer property tax abatements or | ||||||
| 2 | incentive payments to property owners who construct, maintain, | ||||||
| 3 | and use approved stormwater management devices. For those | ||||||
| 4 | counties that adopt use and occupation taxes in accordance with | ||||||
| 5 | the provisions of this Section, the stormwater management | ||||||
| 6 | committee may offer tax rebates or incentive payments to | ||||||
| 7 | property owners who construct, maintain, and use approved | ||||||
| 8 | stormwater management devices.
The stormwater management | ||||||
| 9 | committee is authorized to offer credits to the property tax, | ||||||
| 10 | if applicable, based on authorized practices consistent with | ||||||
| 11 | the stormwater management plan and approved by the committee. | ||||||
| 12 | Expenses of staff of a stormwater management committee that are | ||||||
| 13 | expended on regulatory project review may be no more than 20% | ||||||
| 14 | of the annual budget of the committee, including funds raised | ||||||
| 15 | under subsections (h) and (i). | ||||||
| 16 | (k) Any county that has adopted a county stormwater | ||||||
| 17 | management plan under this Section may, after 10 days written | ||||||
| 18 | notice receiving consent of the owner or occupant, enter upon | ||||||
| 19 | any lands or waters within the county for the purpose of | ||||||
| 20 | inspecting stormwater facilities or causing the removal of any | ||||||
| 21 | obstruction to an affected watercourse. If consent is denied or | ||||||
| 22 | cannot be reasonably obtained, the county ordinance shall | ||||||
| 23 | provide a process or procedure for an administrative warrant to | ||||||
| 24 | be obtained. The county shall be responsible for any damages | ||||||
| 25 | occasioned thereby. | ||||||
| 26 | (l) Upon petition of the municipality, and based on a | ||||||
| |||||||
| |||||||
| 1 | finding of the stormwater management planning committee, the | ||||||
| 2 | county shall not enforce rules and regulations adopted by the | ||||||
| 3 | county in any municipality located wholly or partly within the | ||||||
| 4 | county that has a municipal stormwater management ordinance | ||||||
| 5 | that is consistent with and at least as stringent as the county | ||||||
| 6 | plan and ordinance, and is being enforced by the municipal | ||||||
| 7 | authorities. On issues that the county ordinance is more | ||||||
| 8 | stringent as deemed by the committee, the county shall only | ||||||
| 9 | enforce rules and regulations adopted by the county on the more | ||||||
| 10 | stringent issues and accept municipal permits. The county shall | ||||||
| 11 | have no more than 60 days to review permits or the permits | ||||||
| 12 | shall be deemed approved. | ||||||
| 13 | (m) A county may issue general obligation bonds for | ||||||
| 14 | implementing any stormwater plan adopted under this Section in | ||||||
| 15 | the manner prescribed in Section 5-1012; except that the | ||||||
| 16 | referendum requirement of Section 5-1012 does not apply to | ||||||
| 17 | bonds issued pursuant to this Section on which the principal | ||||||
| 18 | and interest are to be paid entirely out of funds generated by | ||||||
| 19 | the taxes and fees authorized by this Section. | ||||||
| 20 | (n) The powers authorized by this Section may be | ||||||
| 21 | implemented by the county board for a portion of the county | ||||||
| 22 | subject to similar stormwater management needs. | ||||||
| 23 | (o) The powers and taxes authorized by this Section are in | ||||||
| 24 | addition to the powers and taxes authorized by Division 5-15; | ||||||
| 25 | in exercising its powers under this Section, a county shall not | ||||||
| 26 | be subject to the restrictions and requirements of that | ||||||
| |||||||
| |||||||
| 1 | Division.
| ||||||
| 2 | (Source: P.A. 94-675, eff. 8-23-05.)
| ||||||
| 3 | Section 99. Effective date. This Act takes effect upon | ||||||
| 4 | becoming law.
| ||||||