|  |  | 09600SB0052ham002 | - 2 - | LRB096 02025 MJR 27799 a |  | 
| 
 | 
| 1 |  | residents. The costs associated with preparing a  facility cost  | 
| 2 |  | report for such a facility, which contains all of the  | 
| 3 |  | information required by subsection (b) of this Section, may be  | 
| 4 |  | paid or reimbursed pursuant to subsection (c) of this Section. | 
| 5 |  |     (b) The facility cost report for a facility that meets the  | 
| 6 |  | criteria set forth in subsection (a) of this Section shall be  | 
| 7 |  | prepared by a duly licensed engineering firm that details the  | 
| 8 |  | estimated capital costs payable to one or more contractors or  | 
| 9 |  | suppliers for the engineering, procurement, and construction  | 
| 10 |  | of the components comprising the facility and the estimated  | 
| 11 |  | costs of operation and maintenance of the facility. The report  | 
| 12 |  | must be provided to the General Assembly and the Agency on or  | 
| 13 |  | before April 30, 2010.  The facility cost report shall include  | 
| 14 |  | all off the following: | 
| 15 |  |         (1) An estimate of the capital cost of the core plant  | 
| 16 |  | based on a front-end engineering and design study. The core  | 
| 17 |  | plant shall include all civil, structural, mechanical,  | 
| 18 |  | electrical, control, and safety systems.  The quoted  | 
| 19 |  | construction costs shall be expressed in nominal dollars as  | 
| 20 |  | of the date that the quote is prepared and shall include: | 
| 21 |  |             (A)  capitalized financing costs during  | 
| 22 |  | construction; | 
| 23 |  |             (B) taxes, insurance, and other owner's costs; and | 
| 24 |  |             (C) any assumed escalation in materials and labor  | 
| 25 |  | beyond the date as of which the construction cost quote  | 
| 26 |  | is expressed; | 
|     | 
| 
|  |  | 09600SB0052ham002 | - 3 - | LRB096 02025 MJR 27799 a |  | 
| 
 | 
| 1 |  |         (2) An estimate of the capital cost of the balance of  | 
| 2 |  | the plant, including any capital costs associated with site  | 
| 3 |  | preparation and remediation, sequestration of carbon  | 
| 4 |  | dioxide emissions, and all interconnects and interfaces  | 
| 5 |  | required to operate the facility, such as construction or  | 
| 6 |  | backfeed power supply, pipelines to transport substitute  | 
| 7 |  | natural gas or carbon dioxide, potable water supply,  | 
| 8 |  | natural gas supply, water supply, water discharge,  | 
| 9 |  | landfill, access roads, and coal delivery. The front-end  | 
| 10 |  | engineering and design study and the cost study for the  | 
| 11 |  | balance of the plant shall include sufficient design work  | 
| 12 |  | to permit quantification of major categories of materials,  | 
| 13 |  | commodities and labor hours, and receipt of quotes from  | 
| 14 |  | vendors of major equipment required to construct and  | 
| 15 |  | operate the facility. | 
| 16 |  |         (3) An operating and maintenance cost quote that will  | 
| 17 |  | provide the estimated cost of delivered fuel, personnel,  | 
| 18 |  | maintenance contracts, chemicals, catalysts, consumables,  | 
| 19 |  | spares, and other fixed and variable operating and  | 
| 20 |  | maintenance costs. This quote is subject to the following  | 
| 21 |  | requirements: | 
| 22 |  |             (A) The delivered fuel cost estimate shall be  | 
| 23 |  | provided by a recognized third party expert or experts  | 
| 24 |  | in the fuel and transportation industries. | 
| 25 |  |             (B) The balance of the operating and maintenance  | 
| 26 |  | cost quote, excluding delivered fuel costs shall be  | 
|     | 
| 
|  |  | 09600SB0052ham002 | - 4 - | LRB096 02025 MJR 27799 a |  | 
| 
 | 
| 1 |  | developed based on the inputs provided by a duly  | 
| 2 |  | licensed engineering firm performing the construction  | 
| 3 |  | cost quote, potential vendors under long-term service  | 
| 4 |  | agreements and plant operating agreements, or  | 
| 5 |  | recognized third-party plant operator or operators. | 
| 6 |  |         The operating and maintenance cost quote shall be  | 
| 7 |  | expressed in nominal dollars as of the date that the quote  | 
| 8 |  | is prepared and shall include (i) taxes, insurance, and  | 
| 9 |  | other owner's costs and (ii) any assumed escalation in  | 
| 10 |  | materials and labor beyond the date as of which the  | 
| 11 |  | operating and maintenance cost quote is expressed. | 
| 12 |  |     (c) Reasonable amounts paid or due to be paid by the owner  | 
| 13 |  | or owners of the clean coal SNG facility to third parties  | 
| 14 |  | unrelated to the owner or owners to prepare the facility cost  | 
| 15 |  | report will may be reimbursed or paid up to $10 million through  | 
| 16 |  | Coal Development Bonds, through funding authorized pursuant to  | 
| 17 |  | 20 ILCS 3501/825-65. | 
| 18 |  |     (d) The Agency shall review the facility report and based  | 
| 19 |  | on that report, consider whether to enter into long term  | 
| 20 |  | contracts to purchase SNG from the facility pursuant to Section  | 
| 21 |  | 1-20 of this Act.  To assist with its evaluation of the report,  | 
| 22 |  | the Agency may hire one or more experts or consultants, the  | 
| 23 |  | reasonable costs of which, not to exceed $250,000, shall be  | 
| 24 |  | paid for by the owner or owners of the clean coal SNG facility  | 
| 25 |  | submitting the facility cost report.  The Agency may begin the  | 
| 26 |  | process of selecting such experts or consultants prior to  | 
|     | 
| 
|  |  | 09600SB0052ham002 | - 5 - | LRB096 02025 MJR 27799 a |  | 
| 
 | 
| 1 |  | receipt of the facility cost report.
 | 
| 2 |  | (Source: 09600SB0658eng with ham003.)
 | 
| 3 |  |     Section 10. If and only if Senate Bill 658 of the 96th  | 
| 4 |  | General Assembly (as amended by House Amendment No. 3) becomes  | 
| 5 |  | law, the General Obligation Bond Act is amended  by changing  | 
| 6 |  | Section 7 as follows:
 
 | 
| 7 |  |     (30 ILCS 330/7)  (from Ch. 127, par. 657)
 | 
| 8 |  |     Sec. 7. Coal and Energy Development. The amount of  | 
| 9 |  | $698,200,000 is
authorized to be used by the Department of  | 
| 10 |  | Commerce and Economic Opportunity (formerly Department of  | 
| 11 |  | Commerce and Community Affairs) for
coal and energy development  | 
| 12 |  | purposes, pursuant to Sections 2, 3 and 3.1 of the
Illinois  | 
| 13 |  | Coal and Energy Development Bond Act, for the purposes
 | 
| 14 |  | specified
in Section 8.1 of the Energy Conservation and Coal  | 
| 15 |  | Development Act, for
the purposes specified in Section 605-332  | 
| 16 |  | of the Department of Commerce and
Economic Opportunity Law of  | 
| 17 |  | the Civil Administrative Code of Illinois, and for the purpose  | 
| 18 |  | of facility cost reports prepared pursuant to Sections 1-56 or  | 
| 19 |  | Section 1-75(d)(4) of the Illinois Power Agency Act and for the  | 
| 20 |  | purpose of development costs pursuant to Section 8.1 of the  | 
| 21 |  | Energy Conservation and Coal Development Act.  Of this
amount:
 | 
| 22 |  |     (a) $115,000,000 is
for the specific purposes of  | 
| 23 |  | acquisition,
development, construction, reconstruction,  | 
| 24 |  | improvement, financing,
architectural and technical planning  | 
|     | 
| 
|  |  | 09600SB0052ham002 | - 6 - | LRB096 02025 MJR 27799 a |  | 
| 
 | 
| 1 |  | and installation of capital facilities
consisting of  | 
| 2 |  | buildings, structures, durable equipment, and land for the
 | 
| 3 |  | purpose of capital development of coal resources within the  | 
| 4 |  | State and for the
purposes specified in Section 8.1 of the  | 
| 5 |  | Energy Conservation and Coal
Development Act;
 | 
| 6 |  |     (b) $35,000,000 is for the purposes specified in Section  | 
| 7 |  | 8.1 of the
Energy
Conservation and Coal Development Act and  | 
| 8 |  | making a grant to the owner of a
generating station
located in  | 
| 9 |  | Illinois and having at least three coal-fired generating units
 | 
| 10 |  | with accredited summer capability greater than 500 megawatts  | 
| 11 |  | each at such
generating station as provided in Section 6 of  | 
| 12 |  | that Bond Act;
 | 
| 13 |  |     (c) $13,200,000 is for research, development and  | 
| 14 |  | demonstration
of forms of energy
other than that derived from  | 
| 15 |  | coal, either on or off State property;
 | 
| 16 |  |     (d) $500,000,000 is for the purpose of providing financial  | 
| 17 |  | assistance to
new
electric generating facilities as provided in  | 
| 18 |  | Section 605-332 of the Department
of Commerce and Economic  | 
| 19 |  | Opportunity Law of the Civil Administrative Code of
Illinois;  | 
| 20 |  | and
 | 
| 21 |  |     (e) $35,000,000 is for the purpose of facility cost reports  | 
| 22 |  | prepared pursuant to Sections 1-56 or Section 1-75(d)(4) of the  | 
| 23 |  | Illinois Power Agency Act and for the purpose of development  | 
| 24 |  | costs pursuant to Section 8.1 of the Energy Conservation and  | 
| 25 |  | Coal Development Act.  | 
| 26 |  | (Source: P.A. 94-793, eff. 5-19-06; 95-1026, eff. 1-12-09.)
 
 |