|
|
|||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| 1 | AN ACT concerning environmental safety.
| ||||||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||
| 3 | represented in the General Assembly:
| ||||||||||||||||||||||||||
| 4 | Section 5. The Environmental Protection Act is amended by | ||||||||||||||||||||||||||
| 5 | changing Sections 3.160 and 22.51 as follows:
| ||||||||||||||||||||||||||
| 6 | (415 ILCS 5/3.160) (was 415 ILCS 5/3.78 and 3.78a)
| ||||||||||||||||||||||||||
| 7 | Sec. 3.160. Construction or demolition debris.
| ||||||||||||||||||||||||||
| 8 | (a) "General construction or demolition debris" means | ||||||||||||||||||||||||||
| 9 | non-hazardous,
uncontaminated materials resulting from the | ||||||||||||||||||||||||||
| 10 | construction, remodeling, repair,
and demolition of utilities, | ||||||||||||||||||||||||||
| 11 | structures, and roads, limited to the following:
bricks, | ||||||||||||||||||||||||||
| 12 | concrete, and other masonry materials; soil; rock; wood, | ||||||||||||||||||||||||||
| 13 | including
non-hazardous painted, treated, and coated wood and | ||||||||||||||||||||||||||
| 14 | wood products; wall
coverings; plaster; drywall; plumbing | ||||||||||||||||||||||||||
| 15 | fixtures; non-asbestos insulation;
roofing shingles and other | ||||||||||||||||||||||||||
| 16 | roof coverings; reclaimed or other asphalt pavement; glass;
| ||||||||||||||||||||||||||
| 17 | plastics that are not sealed in a manner that conceals waste; | ||||||||||||||||||||||||||
| 18 | electrical
wiring and components containing no hazardous | ||||||||||||||||||||||||||
| 19 | substances; and piping or metals
incidental to any of those | ||||||||||||||||||||||||||
| 20 | materials.
| ||||||||||||||||||||||||||
| 21 | General construction or demolition debris does not include | ||||||||||||||||||||||||||
| 22 | uncontaminated
soil generated during construction, remodeling, | ||||||||||||||||||||||||||
| 23 | repair, and demolition of
utilities, structures, and roads | ||||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | provided the uncontaminated soil is not
commingled with any | ||||||
| 2 | general construction or demolition debris or other waste.
| ||||||
| 3 | To the extent allowed by federal law, uncontaminated | ||||||
| 4 | concrete with protruding rebar shall be considered clean | ||||||
| 5 | construction or demolition debris and shall not be considered | ||||||
| 6 | "waste" if it is separated or processed and returned to the | ||||||
| 7 | economic mainstream in the form of raw materials or products | ||||||
| 8 | within 4 years of its generation, if it is not speculatively | ||||||
| 9 | accumulated and, if used as a fill material, it is used in | ||||||
| 10 | accordance with item (i) in subsection (b) of this Section.
| ||||||
| 11 | (b) "Clean construction or demolition debris" means
| ||||||
| 12 | uncontaminated broken concrete without protruding metal bars, | ||||||
| 13 | bricks, rock,
stone, reclaimed or other asphalt pavement, or | ||||||
| 14 | soil generated from construction or
demolition activities. | ||||||
| 15 | Material that would be clean construction or demolition | ||||||
| 16 | debris but for the presence of contaminants is clean | ||||||
| 17 | construction or demolition debris if the contaminants do not | ||||||
| 18 | exceed "area background", as defined in Section 58.2 of this | ||||||
| 19 | Act.
| ||||||
| 20 | Clean construction or demolition debris does not include | ||||||
| 21 | uncontaminated soil
generated during construction, remodeling, | ||||||
| 22 | repair, and demolition of utilities,
structures, and roads | ||||||
| 23 | provided the uncontaminated soil is not commingled with
any | ||||||
| 24 | clean construction or demolition debris or other waste.
| ||||||
| 25 | To the extent allowed by federal law, clean construction or | ||||||
| 26 | demolition debris
shall not be considered "waste" if it is (i) | ||||||
| |||||||
| |||||||
| 1 | used as fill material outside of a setback zone if the fill is | ||||||
| 2 | placed no higher than the
highest point of elevation existing | ||||||
| 3 | prior to the filling immediately adjacent
to the fill area, and | ||||||
| 4 | if covered by sufficient uncontaminated soil to
support | ||||||
| 5 | vegetation within 30 days of the completion of filling or if | ||||||
| 6 | covered
by a road or structure, or (ii) separated or processed | ||||||
| 7 | and returned to the
economic mainstream in the form of raw | ||||||
| 8 | materials or products, if it is not
speculatively accumulated | ||||||
| 9 | and, if used as a fill material, it is used in
accordance with | ||||||
| 10 | item (i), or (iii) solely
broken concrete without protruding | ||||||
| 11 | metal bars used for erosion control, or
(iv) generated from the | ||||||
| 12 | construction or demolition of a building, road, or
other | ||||||
| 13 | structure and used to construct, on the site where the | ||||||
| 14 | construction or
demolition has taken place, a manmade
| ||||||
| 15 | functional structure not to exceed 20 feet above the highest | ||||||
| 16 | point of
elevation of the property immediately adjacent to the | ||||||
| 17 | new manmade functional
structure as that elevation existed | ||||||
| 18 | prior to the creation of that new
structure,
provided that the | ||||||
| 19 | structure shall be covered with sufficient soil
materials to | ||||||
| 20 | sustain vegetation or by a road or structure, and further
| ||||||
| 21 | provided that no such structure shall be constructed within
a | ||||||
| 22 | home rule municipality with a population over 500,000 without | ||||||
| 23 | the consent
of the municipality.
| ||||||
| 24 | For purposes of this subsection (b), reclaimed or other | ||||||
| 25 | asphalt pavement shall not be considered speculatively | ||||||
| 26 | accumulated if: (i) it is not commingled with any other clean | ||||||
| |||||||
| |||||||
| 1 | construction or demolition debris or any waste; (ii) it is | ||||||
| 2 | returned to the economic mainstream in the form of raw | ||||||
| 3 | materials or products within 4 years after its generation; | ||||||
| 4 | (iii) at least 25% of the total amount present at a site during | ||||||
| 5 | a calendar year is transported off of the site during the next | ||||||
| 6 | calendar year; and (iv) if used as a fill material, it is used | ||||||
| 7 | in accordance with item (i) of the second paragraph of this | ||||||
| 8 | subsection (b).
| ||||||
| 9 | (Source: P.A. 94-272, eff. 7-19-05; 95-121, eff. 8-13-07.)
| ||||||
| 10 | (415 ILCS 5/22.51)
| ||||||
| 11 | Sec. 22.51. Clean Construction or Demolition Debris Fill | ||||||
| 12 | Operations. | ||||||
| 13 | (a) No person shall conduct any clean construction or | ||||||
| 14 | demolition debris fill operation in violation of this Act or | ||||||
| 15 | any regulations or standards adopted by the Board. | ||||||
| 16 | (b)(1)(A) Beginning 30 days after the effective date of | ||||||
| 17 | this amendatory Act of the 94th General Assembly but prior to | ||||||
| 18 | July 1, 2008, no person shall use clean construction or | ||||||
| 19 | demolition debris as fill material in a current or former | ||||||
| 20 | quarry, mine, or other excavation, unless they have applied for | ||||||
| 21 | an interim authorization from the Agency for the clean | ||||||
| 22 | construction or demolition debris fill operation. | ||||||
| 23 | (B) The Agency shall approve an interim authorization upon | ||||||
| 24 | its receipt of a written application for the interim | ||||||
| 25 | authorization that is signed by the site owner and the site | ||||||
| |||||||
| |||||||
| 1 | operator, or their duly authorized agent, and that contains the | ||||||
| 2 | following information: (i) the location of the site where the | ||||||
| 3 | clean construction or demolition debris fill operation is | ||||||
| 4 | taking place, (ii) the name and address of the site owner, | ||||||
| 5 | (iii) the name and address of the site operator, and (iv) the | ||||||
| 6 | types and amounts of clean construction or demolition debris | ||||||
| 7 | being used as fill material at the site. | ||||||
| 8 | (C) The Agency may deny an interim authorization if the | ||||||
| 9 | site owner or the site operator, or their duly authorized | ||||||
| 10 | agent, fails to provide to the Agency the information listed in | ||||||
| 11 | subsection (b)(1)(B) of
this Section. Any denial of an interim | ||||||
| 12 | authorization shall be subject to appeal to the Board in | ||||||
| 13 | accordance with the procedures of Section 40 of this Act. | ||||||
| 14 | (D) No person shall use clean construction or demolition | ||||||
| 15 | debris as fill material in a current or former quarry, mine, or | ||||||
| 16 | other excavation for which the Agency has denied interim | ||||||
| 17 | authorization under subsection (b)(1)(C) of this Section. The | ||||||
| 18 | Board may stay the prohibition of this subsection (D) during | ||||||
| 19 | the pendency of an appeal of the Agency's denial of the interim | ||||||
| 20 | authorization brought under subsection (b)(1)(C) of this | ||||||
| 21 | Section. | ||||||
| 22 | (2) Beginning September 1, 2006, owners and
operators of | ||||||
| 23 | clean construction or demolition debris fill operations shall, | ||||||
| 24 | in accordance with a schedule prescribed by the Agency, submit | ||||||
| 25 | to the Agency applications for the
permits required under this | ||||||
| 26 | Section. The Agency shall notify owners and operators in | ||||||
| |||||||
| |||||||
| 1 | writing of the due date for their permit application. The due | ||||||
| 2 | date shall be no less than 90 days after the date of the | ||||||
| 3 | Agency's written notification. Owners and operators who do not | ||||||
| 4 | receive a written notification from the Agency by October 1, | ||||||
| 5 | 2007, shall submit a permit application to the Agency by | ||||||
| 6 | January 1, 2008. The interim authorization of owners and | ||||||
| 7 | operators who fail to submit a permit application to the Agency | ||||||
| 8 | by the permit application's due date shall terminate on (i) the | ||||||
| 9 | due
date established by the Agency if the owner or operator | ||||||
| 10 | received a written notification from the Agency prior to
| ||||||
| 11 | October 1, 2007, or (ii) or January 1, 2008, if the owner or | ||||||
| 12 | operator did not receive a written notification from the Agency | ||||||
| 13 | by October 1, 2007. | ||||||
| 14 | (3) On and after July 1, 2008, no person shall use clean | ||||||
| 15 | construction or demolition debris as fill material in a current | ||||||
| 16 | or former quarry, mine, or other excavation without a permit | ||||||
| 17 | granted by the Agency for the clean construction or demolition | ||||||
| 18 | debris fill operation or in violation of any conditions imposed | ||||||
| 19 | by such permit, including periodic reports and full access to | ||||||
| 20 | adequate records and the inspection of facilities, as may be | ||||||
| 21 | necessary to assure compliance with this Act and with Board | ||||||
| 22 | regulations and standards adopted under this Act. | ||||||
| 23 | (4) This subsection (b) does not apply to: | ||||||
| 24 | (A) the use of clean construction or demolition debris | ||||||
| 25 | as fill material in a current or former quarry, mine, or | ||||||
| 26 | other excavation located on the site where the clean | ||||||
| |||||||
| |||||||
| 1 | construction or demolition debris was generated; | ||||||
| 2 | (B) the use of clean construction or demolition debris | ||||||
| 3 | as fill material in an excavation other than a current or | ||||||
| 4 | former quarry or mine if this use complies with Illinois | ||||||
| 5 | Department of Transportation specifications; or
| ||||||
| 6 | (C) current or former quarries, mines, and other | ||||||
| 7 | excavations that do not use clean construction or | ||||||
| 8 | demolition debris as fill material.
| ||||||
| 9 | (c) In accordance with Title VII of this Act, the Board may | ||||||
| 10 | adopt regulations to promote the purposes of this Section. The | ||||||
| 11 | Agency shall consult with the mining and construction | ||||||
| 12 | industries during the development of any regulations to promote | ||||||
| 13 | the purposes of this Section. | ||||||
| 14 | (1) No later than December 15, 2005, the Agency shall | ||||||
| 15 | propose to the Board, and no later than September 1, 2006, | ||||||
| 16 | the Board shall adopt, regulations for the use of clean | ||||||
| 17 | construction or demolition debris as fill material in | ||||||
| 18 | current and former quarries, mines, and other excavations. | ||||||
| 19 | Such regulations shall include, but shall not be limited | ||||||
| 20 | to, standards for clean construction or demolition debris | ||||||
| 21 | fill operations and the submission and review of permits | ||||||
| 22 | required under this Section. | ||||||
| 23 | (2) Until the Board adopts rules under subsection | ||||||
| 24 | (c)(1) of this Section, all persons using clean | ||||||
| 25 | construction or
demolition debris as fill material in a | ||||||
| 26 | current or former quarry, mine, or other excavation shall: | ||||||
| |||||||
| |||||||
| 1 | (A) Assure that only clean construction or | ||||||
| 2 | demolition debris is being used as fill material by | ||||||
| 3 | screening each truckload of material received using a | ||||||
| 4 | device approved by the Agency that detects volatile | ||||||
| 5 | organic compounds. Such devices may include, but are | ||||||
| 6 | not limited to, photo ionization detectors. All | ||||||
| 7 | screening devices shall be operated and maintained in | ||||||
| 8 | accordance with manufacturer's specifications. | ||||||
| 9 | Unacceptable fill material shall be rejected from the | ||||||
| 10 | site; and | ||||||
| 11 | (B) Retain for a minimum of 3 years the following | ||||||
| 12 | information: | ||||||
| 13 | (i) The name of the hauler, the name of the | ||||||
| 14 | generator, and place of origin of the debris or | ||||||
| 15 | soil; | ||||||
| 16 | (ii) The approximate weight or volume of the | ||||||
| 17 | debris or soil; and | ||||||
| 18 | (iii) The date the debris or soil was received. | ||||||
| 19 | (d) This Section applies only to clean construction or | ||||||
| 20 | demolition debris that is not considered "waste" as provided in | ||||||
| 21 | Section 3.160 of this Act. | ||||||
| 22 | (e) For purposes of a clean construction or demolition | ||||||
| 23 | debris fill operation: | ||||||
| 24 | (1) The term "operator" means a person responsible for | ||||||
| 25 | the operation and maintenance of a clean construction or | ||||||
| 26 | demolition debris fill operation. | ||||||
| |||||||
| |||||||
| 1 | (2) The term "owner" means a person who has any direct | ||||||
| 2 | or indirect interest in a clean construction or demolition | ||||||
| 3 | debris fill operation or in land on which a person operates | ||||||
| 4 | and maintains a clean construction or demolition debris | ||||||
| 5 | fill operation. A "direct or indirect interest" does not | ||||||
| 6 | include the ownership of publicly traded stock. The "owner" | ||||||
| 7 | is the "operator" if there is no other person who is | ||||||
| 8 | operating and maintaining a clean construction or | ||||||
| 9 | demolition debris fill operation.
| ||||||
| 10 | (f) The Agency shall develop a special authorization for | ||||||
| 11 | clean construction or demolition debris fill operations that | ||||||
| 12 | accept urban soil or other urban construction or demolition | ||||||
| 13 | debris from the Chicago metropolitan area or the Metro-East | ||||||
| 14 | area, which shall be known as CCDD urban facilities. Within 30 | ||||||
| 15 | days after the effective date of this amendatory Act of the | ||||||
| 16 | 95th General Assembly, the Agency shall grant interim | ||||||
| 17 | authorization to any facility requesting to be authorized as a | ||||||
| 18 | CCDD urban facility, subject only to a demonstration that the | ||||||
| 19 | acceptance of any such material will not adversely impact | ||||||
| 20 | existing groundwater. The Agency's denial of this interim | ||||||
| 21 | authorization, or its failure to grant this interim | ||||||
| 22 | authorization in accordance with this subsection, is | ||||||
| 23 | considered to be a final decision of the Agency that is subject | ||||||
| 24 | to appeal to the Board under Section 40 of this Act. Within 30 | ||||||
| 25 | days after the effective date of this amendatory Act of the | ||||||
| 26 | 95th General Assembly, the Agency shall propose rules to the | ||||||
| |||||||
| |||||||
| 1 | Board to make this special permit program permanent. The Board | ||||||
| 2 | shall engage in rulemaking under Sections 27 and 28 of this Act | ||||||
| 3 | and shall adopt rules within 12 months after the effective date | ||||||
| 4 | of this amendatory Act of the 95th General Assembly. The rules | ||||||
| 5 | must include procedures to ensure that the acceptance of | ||||||
| 6 | material pursuant to this Section will not adversely impact | ||||||
| 7 | existing groundwater at or near the fill operation. | ||||||
| 8 | (Source: P.A. 94-272, eff. 7-19-05; 94-725, eff. 6-1-06.)
| ||||||
| 9 | Section 99. Effective date. This Act takes effect upon | ||||||
| 10 | becoming law.
| ||||||