| 1 | AN ACT concerning State buildings.
| ||||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
| 3 | represented in the General Assembly:
| ||||||||||||||||||||||||
| 4 | Section 1. Short title. This Act may be cited as the Green | ||||||||||||||||||||||||
| 5 | Buildings Act. | ||||||||||||||||||||||||
| 6 | Section 5. Findings.
The General Assembly finds that an | ||||||||||||||||||||||||
| 7 | efficient green building plan is essential to: | ||||||||||||||||||||||||
| 8 | (1) reduce the increasing costs of energy for public | ||||||||||||||||||||||||
| 9 | buildings and reduce the State's overall energy usage; | ||||||||||||||||||||||||
| 10 | (2) preserve the environment and make State buildings | ||||||||||||||||||||||||
| 11 | better for those who work and study in them, as well as the | ||||||||||||||||||||||||
| 12 | area around them; and | ||||||||||||||||||||||||
| 13 | (3) cut pollution, moderate peak energy demand, better | ||||||||||||||||||||||||
| 14 | assure the reliability of energy studies, and stabilize energy | ||||||||||||||||||||||||
| 15 | costs.
| ||||||||||||||||||||||||
| 16 | Section 10. Definitions. In this Act: | ||||||||||||||||||||||||
| 17 | "Board" means the Capital Development Board. | ||||||||||||||||||||||||
| 18 | "USGBC" means the United State Green Building Council. | ||||||||||||||||||||||||
| 19 | "LEED" means the USGBC Leadership in Energy and | ||||||||||||||||||||||||
| 20 | Environmental Design green building rating standard. | ||||||||||||||||||||||||
| 21 | "Major renovation" means a project with a construction | ||||||||||||||||||||||||
| 22 | budget that equals 40% or more of the building's current | ||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | replacement cost.
| ||||||
| 2 | Section 15. Green Buildings Standards.
| ||||||
| 3 | (a) All new state-funded building construction and major | ||||||
| 4 | renovations of existing state-owned facilities are required to | ||||||
| 5 | seek LEED certification. | ||||||
| 6 | (b) All construction and major renovation projects, | ||||||
| 7 | regardless of size, must achieve the highest level of | ||||||
| 8 | certification practical within the project budget. | ||||||
| 9 | (1) New buildings and major renovations of less than | ||||||
| 10 | 10,000 square feet must meet the highest LEED standard | ||||||
| 11 | practical, including those credits the Board requires as | ||||||
| 12 | mandatory. USGBC LEED certification is not required. | ||||||
| 13 | (2) New buildings and major renovations of less than | ||||||
| 14 | 10,000 square feet must achieve LEED "silver" | ||||||
| 15 | certification at a minimum, including those credits the | ||||||
| 16 | Board requires as mandatory. USGBC LEED certification is | ||||||
| 17 | required. | ||||||
| 18 | (c) Exemptions to these standards are buildings that are | ||||||
| 19 | not "comfort" conditioned as determined by the Board. However, | ||||||
| 20 | the project design team must document and incorporate all | ||||||
| 21 | appropriate sustainable building methods, strategies, and | ||||||
| 22 | technologies in the final design. | ||||||
| 23 | (d) State agencies and the project design team may apply to | ||||||
| 24 | the Board for a waiver from these standards. | ||||||
| 25 | (e) Waivers shall be granted by the Board or an appropriate | ||||||
| |||||||
| |||||||
| 1 | agency when the applicant can demonstrate and document:
| ||||||
| 2 | (1) An unreasonable financial burden, taking into | ||||||
| 3 | account the operating and construction costs over the life | ||||||
| 4 | of the building and the total cost of ownership of the | ||||||
| 5 | building. | ||||||
| 6 | (2) An unreasonable impediment to construction. | ||||||
| 7 | (3) The standards would impair the principal function | ||||||
| 8 | of the building. | ||||||
| 9 | (4) The standards would compromise the historic nature | ||||||
| 10 | of the structure. | ||||||
| 11 | Documentation on the submittal must include at a minimum: | ||||||
| 12 | (1) Life cycle cost analysis. | ||||||
| 13 | (2) Energy modeling. | ||||||
| 14 | The design team must provide the documentation for the new | ||||||
| 15 | project to confirm that LEED standards in the design have been | ||||||
| 16 | followed. | ||||||
| 17 | (f) The green building standards contained in this Act | ||||||
| 18 | shall be analyzed and evaluated by the Board after 5 years or | ||||||
| 19 | the completion of 10 Board green projects, whichever comes | ||||||
| 20 | first. | ||||||
| 21 | Section 20. Rules. The Board may adopt any rules that are | ||||||
| 22 | necessary for the furtherance of this Act.
| ||||||
| 23 | Section 99. Effective date. This Act takes effect upon | ||||||
| 24 | becoming law.
| ||||||