| (2) Develop district-wide goals and objectives and |
| 2 |
| evaluate any previous 5-year plan. |
| 3 |
| (3) Research and compile data described in this |
| 4 |
| Section. |
| 5 |
| (4) Translate educational needs into facility needs. |
| 6 |
| (5) Develop a finance plan to implement the facility |
| 7 |
| improvements. |
| 8 |
| (6) Conduct public hearings and develop a synopsis of |
| 9 |
| public comments. |
| 10 |
| (7) Develop an objective methodology for evaluating |
| 11 |
| the effectiveness of the plan. This evaluation is to occur |
| 12 |
| during the third year of the 5-year planning period. |
| 13 |
| (8) Approve the proposed CEFP. |
| 14 |
| (9) Submit the CEFP to the State Board for approval. If |
| 15 |
| the plan is altered prior to the 10-year anniversary date, |
| 16 |
| the amended document must be submitted to the State Board |
| 17 |
| for approval. |
| 18 |
| (c) The CEFP must include the following components: |
| 19 |
| (1) Goals and objectives. |
| 20 |
| (2) Community analysis. |
| 21 |
| (3) Population and enrollment study. |
| 22 |
| (4) Educational plan. |
| 23 |
| (5) Evaluation and inventory of existing facilities |
| 24 |
| for
compliance with State requirements. |
| 25 |
| (6) Major improvement plan for existing facilities. |
| 26 |
| (7) Inter-agency, shared-use of facilities feasibility |
| 27 |
| study. |
| 28 |
| (8) Translating educational needs into facility needs. |
| 29 |
| (9) Financing plan, including a prioritized list of all |
| 30 |
| projects within the school district and their estimated |
| 31 |
| costs. |
| 32 |
| (10) Synopsis of comments from the public hearing. |
| 33 |
| (11) Evaluation and objective of implementation. |
| 34 |
| (d) The school board must develop and adopt the goals and |
|
|
|
09400HB2012ham001 |
- 3 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| objectives of the CEFP. These goals and objectives must |
| 2 |
| consider all aspects of the educational and facility needs of |
| 3 |
| the school district. Minimally, curriculum delivery models, |
| 4 |
| grade configurations, maximum and minimum school sizes, |
| 5 |
| community expectations, optimal student populations, and the |
| 6 |
| number of facilities that can be effectively maintained, given |
| 7 |
| limited resources available to the district, must be addressed. |
| 8 |
| (e) With respect to the community analysis component of the |
| 9 |
| CEFP, the school board must study the following aspects of the |
| 10 |
| school district's development: |
| 11 |
| (1) Population characteristics and density patterns. |
| 12 |
| (2) Population changes due to migration patterns and to |
| 13 |
| fluctuations in the birth rate. |
| 14 |
| (3) Changes in land usage (residential, commercial, |
| 15 |
| and industrial). |
| 16 |
| (4) Major highways and street networks and their |
| 17 |
| probable future development. |
| 18 |
| (5) Changes in socio-economic patterns resulting in |
| 19 |
| population shifts within the community. |
| 20 |
| (6) Condition and value of property assessments. |
| 21 |
| (7) Availability of community services, such as |
| 22 |
| libraries, recreational areas, health services, and public |
| 23 |
| assembly space. |
| 24 |
| (8) Employment opportunities. |
| 25 |
| (9) Parental expectations of the school system. |
| 26 |
| (10) Citizen attitudes and aspirations in general. |
| 27 |
| (11) Possible shifts in housing patterns. |
| 28 |
| (12) Study of school attendance zones as they relate to |
| 29 |
| the dispersion of the district's school population. |
| 30 |
| (f) With respect to the population and enrollment study |
| 31 |
| component of the CEFP, in making enrollment projections, the |
| 32 |
| school board must consider the following statistics: |
| 33 |
| (1) Population trends for the school district and each |
| 34 |
| school in the district. |
|
|
|
09400HB2012ham001 |
- 4 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| (2) Birth rates and the number of births. |
| 2 |
| (3) School enrollment figures and trends for the past |
| 3 |
| 10 years. |
| 4 |
| (4) Historic non-public school enrollment figures, if |
| 5 |
| available. |
| 6 |
| (5) Trends of dropout and attrition rates for the past |
| 7 |
| 10 years. |
| 8 |
| (6) Ten-year enrollment projections per school |
| 9 |
| calculated by an approved method that considers items (1) |
| 10 |
| through (5) of this subsection (f). |
| 11 |
| (g) With respect to the educational plan component of the |
| 12 |
| CEFP, the school board shall include an analysis of the current |
| 13 |
| educational program and projections of the planned educational |
| 14 |
| program. The educational plan shall include the following: |
| 15 |
| (1) A description of the educational system proposed |
| 16 |
| for the 5-year and 10-year CEFP and how it will improve |
| 17 |
| instructional delivery as follows: |
| 18 |
| (A) How does the existing plan not meet the |
| 19 |
| district's goals and objectives and how does the new |
| 20 |
| plan meet these goals and objectives? |
| 21 |
| (B) Will the school system be predominately |
| 22 |
| organized on a grade K through 4, 5 through 8, and 9 |
| 23 |
| through 12 pattern or some other pattern? |
| 24 |
| (C) Will the typical pattern of one teacher per |
| 25 |
| class be followed or are teaching teams to be involved |
| 26 |
| all or part of the time? |
| 27 |
| (D) Generally, will there be self-contained or |
| 28 |
| departmentalized classroom instruction? |
| 29 |
| (E) Generally, will there be typical grade |
| 30 |
| patterns or will there be an ungraded or flexible |
| 31 |
| grouping of students? |
| 32 |
| (F) What will be the maximum or minimum enrollment |
| 33 |
| and total number of instructional areas in each school |
| 34 |
| building? |
|
|
|
09400HB2012ham001 |
- 5 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| (G) What method of scheduling will be utilized in |
| 2 |
| each school building (traditional, block, flexible, |
| 3 |
| year-round, or other)? Indicate the number of periods |
| 4 |
| in each instructional day. |
| 5 |
| (H) What is the plan for providing vocational and |
| 6 |
| technical education? |
| 7 |
| (2) A curriculum plan as follows: |
| 8 |
| (A) What knowledge, understanding, attitudes, |
| 9 |
| skills, and habits of life should be developed through |
| 10 |
| the experiences provided for children? |
| 11 |
| (B) What are the general characteristics of a high |
| 12 |
| quality school program? |
| 13 |
| (h) The evaluation and inventory of existing facilities |
| 14 |
| component of the CEFP shall include a survey of each school |
| 15 |
| facility, including modular and detached structures in the |
| 16 |
| school district (including diagrammatic floor plans and |
| 17 |
| exterior photographs), using a school facility evaluation |
| 18 |
| instrument. This evaluation shall provide objective data on the |
| 19 |
| condition and components of the existing building, its |
| 20 |
| appropriateness for delivery of the instructional program, and |
| 21 |
| its ability to support the present and projected enrollments in |
| 22 |
| an effective and efficient manner. Based on the district's |
| 23 |
| goals and objectives, individual facility deficiencies must be |
| 24 |
| identified. The school board must use the services of a |
| 25 |
| certified recognized educational facility professional, |
| 26 |
| architect, or professional engineer for the evaluation. |
| 27 |
| (i) The disposition of abandoned or surplus school |
| 28 |
| buildings must be identified in the CEFP and must include |
| 29 |
| accommodation for security, sanitation, health, and safety to |
| 30 |
| minimize the facility as an attractive nuisance to the |
| 31 |
| community and an analysis of feasible, alternative, adaptive |
| 32 |
| uses by the surrounding community. Crime Prevention Through |
| 33 |
| Environmental Design principles must be included during the |
| 34 |
| evaluation. |
|
|
|
09400HB2012ham001 |
- 6 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| Facility improvements and new facilities must accommodate |
| 2 |
| the educational programs by design. The building design must be |
| 3 |
| dictated by the curriculum, as defined in an approved |
| 4 |
| educational specification. Existing and new facilities must |
| 5 |
| meet all regulations of this State. |
| 6 |
| The CEFP shall provide specific criteria the school |
| 7 |
| district shall use to determine whether a school facility is to |
| 8 |
| be closed, including a detailed analysis of the impact of the |
| 9 |
| school closing on students to be transferred, the impact on |
| 10 |
| receiving schools, the limit on the number of forced student |
| 11 |
| transfers at the primary, middle school, and secondary school |
| 12 |
| levels, and a study of potential alternatives to school |
| 13 |
| closure. There must be substantive community input into the |
| 14 |
| school closings and the alternatives analysis. |
| 15 |
| The CEFP must describe each school facility and site, |
| 16 |
| enrollments, general conditions, recommendations for future
|
| 17 |
| use of the building, and cost estimates to implement the |
| 18 |
| recommendations. The CEFP shall provide a list of projects at |
| 19 |
| each facility needed to address the inadequacies in health and |
| 20 |
| safety, building integrity, or educational capability of the |
| 21 |
| facility. The CEFP shall have a one-year, 5-year, and 10-year |
| 22 |
| timeline to indicate the anticipated
completion of each of |
| 23 |
| these projects. |
| 24 |
| (j) Prior to submitting the CEFP to the State Board of |
| 25 |
| Education for approval, a minimum of one public hearing must be |
| 26 |
| advertised and conducted in the school district, except that in |
| 27 |
| a school district organized under Article 34 of this Code, a |
| 28 |
| minimum of 3 public hearings must be advertised and conducted |
| 29 |
| in the school district, to provide broad-based community input |
| 30 |
| into the plan. As an addendum to the CEFP, sufficient |
| 31 |
| documentation, including verification of public notices from |
| 32 |
| the local newspaper, a synopsis of all comments received during |
| 33 |
| the hearing, and a formal comment from the school board must be |
| 34 |
| included. |
|
|
|
09400HB2012ham001 |
- 7 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| (k) As part of the total CEFP, the school district shall |
| 2 |
| include the objective means to be utilized in evaluating |
| 3 |
| implementation and effectiveness of the overall plan and each |
| 4 |
| project included in the plan.
The evaluation shall measure all |
| 5 |
| of the following: |
| 6 |
| (1) How each project furthers each of the quality |
| 7 |
| educational goals of the school district and the State |
| 8 |
| Board of Education, including student health and safety, |
| 9 |
| economies of scale, travel time and other demographics, |
| 10 |
| achievements of an effective and efficient instructional |
| 11 |
| delivery system, curricular improvements, innovations in |
| 12 |
| education, and adequate space for projected student |
| 13 |
| enrollment and community use of educational facilities. |
| 14 |
| (2) Prioritization of projects within the district, to |
| 15 |
| serve as a basis for determining expenditure of available |
| 16 |
| funds. |
| 17 |
| (3) The overall success of a project and how it relates |
| 18 |
| to the facilities plan of the district and the overall |
| 19 |
| educational goals of the district and this State. |
| 20 |
| (l) The CEFP must be based on an assessment and statement |
| 21 |
| of educational specifications for each of the facilities in the |
| 22 |
| school district. The educational specifications must describe |
| 23 |
| the educational activities that a proposed facility must |
| 24 |
| support and the types of spaces that will best accommodate |
| 25 |
| program requirements. |
| 26 |
| The development of educational specifications for each new |
| 27 |
| school
facility and for each substantially rehabilitated or |
| 28 |
| renovated facility must be accomplished by school |
| 29 |
| administrative unit personnel, with or without the assistance |
| 30 |
| of an outside consultant. The school board shall appoint |
| 31 |
| members to a working committee for the development of the |
| 32 |
| educational specifications. The district superintendent shall |
| 33 |
| recommend persons for appointment or, in the case of a school |
| 34 |
| district organized under Article 34 of this Code, the local |
|
|
|
09400HB2012ham001 |
- 8 - |
LRB094 02841 RAS 55944 a |
|
|
| 1 |
| school council shall recommend persons for appointment. In a |
| 2 |
| school district organized under Article 34 of this Code, at |
| 3 |
| least 2 members of the local school council shall serve on the |
| 4 |
| committee. The committee chairperson shall be the principal of |
| 5 |
| the proposed, rehabilitated, or renovated facility. If that |
| 6 |
| person has not been identified, then the principal of another |
| 7 |
| school facility in the district may serve. The working |
| 8 |
| committee must be small, selective, and balanced in |
| 9 |
| composition, with diversified interests, knowledge, and skills |
| 10 |
| represented. The school board shall take into consideration the |
| 11 |
| following factors in appointing members to the committee: |
| 12 |
| (1) Time available to spend on the project. |
| 13 |
| (2) Knowledge about the project. |
| 14 |
| (3) Imagination and creativity. |
| 15 |
| (4) Ability to work with people. |
| 16 |
| (5) Interest in the improvement of the school.".
|