SB3529 - 104th General Assembly (2025-2026)

MAKE-READY INFRASTRUCTURE ACT
Last Action

2/05/2026 - Senate: Referred to Assignments
Senate Sponsors

Sen. Adriane Johnson
Statutes Amended In Order of Appearance

Synopsis As Introduced

Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.
Actions

DateChamberAction
2/05/2026SenateFiled with Secretary by Sen. Adriane Johnson
2/05/2026SenateFirst Reading
2/05/2026SenateReferred to Assignments