SB3273 - 104th General Assembly (2025-2026)
UTILITIES-INTERCONNECTIONS
Last Action
2/03/2026 - Senate: Referred to Assignments
Statutes Amended In Order of Appearance
Synopsis As Introduced
Amends the Public Utilities Act. Sets forth procedures for the processing of interconnection requests from applicants for distributed renewable generation projects on public school land. Provides that, for all net metering credits or other credits owed to a customer who has elected to install a distributed renewable generation project on public school land, all credits intended for the benefit of the consumer must be credited by the public utility or retail energy supplier within 90 days after the public utility or retail energy supplier determines that the criteria for the credit have been met. Provides that the Illinois Commerce Commission shall adopt revisions to its standards for the interconnection of eligible renewable generating equipment and net metering credit rules to conform with the requirements of the provisions of the amendatory Act. In provisions concerning customer self-generation of electricity, provides that, for distributed renewable generation projects on public school land, any fees for interconnection applications charged by the electric cooperative or municipal system must be substantially similar to the fees charged by public utilities for the interconnection of the same or similar projects and must not exceed 150% of the cost of the base interconnection fees of the other public utilities. Effective immediately.
Actions
| Date | Chamber | Action |
|---|---|---|
| 2/03/2026 | Senate | Filed with Secretary by Sen. Bill Cunningham |
| 2/03/2026 | Senate | First Reading |
| 2/03/2026 | Senate | Referred to Assignments |
