SB2248 - 104th General Assembly (2025-2026)
TRANSPORT INFRASTRUCT-DELIVERY
Last Action
4/11/2025 - Senate: Rule 3-9(a) / Re-referred to Assignments
Statutes Amended In Order of Appearance
Synopsis As Introduced
Amends the Innovations for Transportation Infrastructure Act. Provides that the Department of Transportation or the Illinois State Toll Highway Authority may use the design-build project delivery method for transportation facilities if the capital costs for transportation facilities delivered utilizing the design-build project delivery method or Construction Manager/General Contractor project delivery method or Alternative Technical Concepts in a design-bid-build project delivery method do not for transportation facilities delivered by the Department, exceed the value of 20% of the projects annually programmed in (rather than $400 million of contracts awarded during) the Department's multi-year highway improvement program on an annual basis (rather than for any 5-year period). Removes language that provides that notwithstanding any other law, and as authority supplemental to its existing powers, the Department may use the Construction Manager/General Contractor project delivery method for up to 2 transportation facilities per year. Effective immediately.
Actions
| Date | Chamber | Action |
|---|---|---|
| 2/07/2025 | Senate | Filed with Secretary by Sen. Ram Villivalam |
| 2/07/2025 | Senate | First Reading |
| 2/07/2025 | Senate | Referred to Assignments |
| 2/18/2025 | Senate | Added as Co-Sponsor Sen. Seth Lewis |
| 2/19/2025 | Senate | Added as Co-Sponsor Sen. Rachel Ventura |
| 2/25/2025 | Senate | Added as Co-Sponsor Sen. Dale Fowler |
| 2/25/2025 | Senate | Assigned to Executive |
| 3/19/2025 | Senate | To Procurement |
| 3/21/2025 | Senate | Rule 2-10 Committee Deadline Established As April 11, 2025 |
| 4/11/2025 | Senate | Rule 3-9(a) / Re-referred to Assignments |