Bill Status of SB 1595   104th General Assembly


Short Description:  DNR FLOOD EVENT CONSTRUCTION

Senate Sponsors
Sen. Jil Tracy

Last Action  View All Actions

DateChamber Action
  3/21/2025SenateRule 3-9(a) / Re-referred to Assignments

Statutes Amended In Order of Appearance
615 ILCS 5/40 new

Synopsis As Introduced
Amends the Rivers, Lakes, and Streams Act. Provides that, for construction related to worst-case analysis flood events, the Department of Natural Resources shall (1) for levee improvements, provide notice of submissions, a detailed timeline, specific requirements, and any internal review procedures to the submitter within 90 days; (2) for rural construction along navigable waterways, permit a water surface profile increase of 0.5 feet; (3) for urban construction, permit a water surface profile increase of 0.1 feet; and (4) require a mitigation analysis only if water surface profile increases exceed an induced head study. Effective immediately.

Actions 
DateChamber Action
  2/4/2025SenateFiled with Secretary by Sen. Jil Tracy
  2/4/2025SenateFirst Reading
  2/4/2025SenateReferred to Assignments
  2/11/2025SenateAssigned to Environment and Conservation
  3/21/2025SenateRule 3-9(a) / Re-referred to Assignments

Back To Top