HB1051 - 104th General Assembly (2025-2026)
CLOSED-LOOP WELL SETBACKS
Last Action
3/21/2025 - House: Rule 19(a) / Re-referred to Rules Committee
Statutes Amended In Order of Appearance
Synopsis As Introduced
Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.
Actions
| Date | Chamber | Action |
|---|---|---|
| 12/17/2024 | House | Prefiled with Clerk by Rep. Dave Vella |
| 1/09/2025 | House | First Reading |
| 1/09/2025 | House | Referred to Rules Committee |
| 2/04/2025 | House | Assigned to Energy & Environment Committee |
| 3/05/2025 | House | Added Co-Sponsor Rep. Anne Stava |
| 3/06/2025 | House | To Local Government Subcommittee |
| 3/21/2025 | House | Rule 19(a) / Re-referred to Rules Committee |
