|   
 | 
Sen. Sue Rezin
Filed: 4/25/2017
 
 
 
| |  |  | 10000SB1337sam002 |  | LRB100 07731 AWJ 25525 a | 
 | 
| 
 
 | 
| 1 |  | AMENDMENT TO SENATE BILL 1337
 
 | 
| 2 |  |     AMENDMENT NO. ______. Amend Senate Bill 1337, AS AMENDED,  | 
| 3 |  | by replacing everything after the enacting clause with the  | 
| 4 |  | following:
 
 | 
| 5 |  |     "Section 5. The Counties Code is amended  by changing  | 
| 6 |  | Sections 5-1062, 5-1062.2, and 5-1062.3 as follows:
 
 | 
| 7 |  |     (55 ILCS 5/5-1062)  (from Ch. 34, par. 5-1062)
 | 
| 8 |  |     Sec. 5-1062. Stormwater management. 
 | 
| 9 |  |     (a) The purpose of this Section is to allow management and  | 
| 10 |  | mitigation of the
effects of urbanization on stormwater  | 
| 11 |  | drainage in metropolitan counties located
in the area served by  | 
| 12 |  | the Chicago Metropolitan Agency for Planning Northeastern  | 
| 13 |  | Illinois Planning Commission, and
references to "county" in  | 
| 14 |  | this Section shall apply only to those counties.
This Section  | 
| 15 |  | shall not apply to any county with a population in excess of
 | 
| 16 |  | 1,500,000, except as provided in subsection (c). The purpose of  | 
|     | 
| |  |  | 10000SB1337sam002 | - 2 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | this Section
shall be achieved by:
 | 
| 2 |  |         (1) consolidating the existing stormwater management  | 
| 3 |  | framework into a
united, countywide structure;
 | 
| 4 |  |         (2) setting minimum standards for floodplain and  | 
| 5 |  | stormwater management with an emphasis on the use of  | 
| 6 |  | cost-effective solutions to flooding problems;
and
 | 
| 7 |  |         (3) preparing a countywide plan for the management of  | 
| 8 |  | stormwater runoff,
including the management of natural and  | 
| 9 |  | man-made drainageways.  The countywide
plan may incorporate  | 
| 10 |  | watershed plans and shall evaluate and address flooding  | 
| 11 |  | problems that exist in urbanized areas that are a result of  | 
| 12 |  | urban flooding.
 | 
| 13 |  |     (b) A stormwater management planning committee shall be  | 
| 14 |  | established by
county board resolution, with its membership  | 
| 15 |  | consisting of equal numbers of
county board and municipal  | 
| 16 |  | representatives from each county board
district, and such other  | 
| 17 |  | members as may be determined by the county and
municipal  | 
| 18 |  | members.  However, if the county has more than 6 county board
 | 
| 19 |  | districts, the county board may by ordinance divide the county  | 
| 20 |  | into not
less than 6 areas of approximately equal population,  | 
| 21 |  | to be used instead of
county board districts for the purpose of  | 
| 22 |  | determining representation on the
stormwater management  | 
| 23 |  | planning committee.
 | 
| 24 |  |     The county board members shall be appointed by the chairman  | 
| 25 |  | of the county
board.  Municipal members from each county board  | 
| 26 |  | district or other
represented area shall be appointed by a  | 
|     | 
| |  |  | 10000SB1337sam002 | - 3 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | majority vote of the mayors of
those municipalities which have  | 
| 2 |  | the greatest percentage of their respective
populations  | 
| 3 |  | residing in such county board district or other represented
 | 
| 4 |  | area.  All municipal and county board representatives shall be  | 
| 5 |  | entitled
to a vote; the other members shall be nonvoting  | 
| 6 |  | members, unless authorized
to vote by the unanimous consent of  | 
| 7 |  | the municipal and county board
representatives. A municipality  | 
| 8 |  | that is located in more than one county may
choose, at the time  | 
| 9 |  | of formation of the stormwater management planning
committee  | 
| 10 |  | and based on watershed boundaries, to participate in the
 | 
| 11 |  | stormwater management planning program of either or both of the  | 
| 12 |  | counties.
Subcommittees of the stormwater management planning  | 
| 13 |  | committee may be
established to serve a portion of the county  | 
| 14 |  | or a particular drainage basin
that has similar stormwater  | 
| 15 |  | management needs.  The stormwater management
planning committee  | 
| 16 |  | shall adopt by-laws, by a majority vote of the county and
 | 
| 17 |  | municipal members, to govern the functions of the committee and  | 
| 18 |  | its
subcommittees. Officers of the committee shall include a  | 
| 19 |  | chair and vice chair,
one of whom shall be a county  | 
| 20 |  | representative and one a municipal
representative.
 | 
| 21 |  |     The principal duties of the committee shall be to develop a  | 
| 22 |  | stormwater
management plan for presentation to and approval by  | 
| 23 |  | the county board, and
to direct the plan's implementation and  | 
| 24 |  | revision. The committee may retain
engineering, legal and  | 
| 25 |  | financial advisors and inspection personnel.  The
committee  | 
| 26 |  | shall meet at least quarterly and shall hold at least one  | 
|     | 
| |  |  | 10000SB1337sam002 | - 4 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | public
meeting during the preparation of the plan and prior to  | 
| 2 |  | its submittal to the
county board. The committee may make  | 
| 3 |  | grants to: (1) units of local government; (2) not-for-profit  | 
| 4 |  | organizations; and (3) landowners. In order for a municipality  | 
| 5 |  | located partially or wholly within a mapped floodplain to  | 
| 6 |  | receive grant moneys, the municipality must be a member in the  | 
| 7 |  | Federal Emergency Management Agency's National Flood Insurance  | 
| 8 |  | Program.  A municipality receiving grant moneys must have  | 
| 9 |  | adopted an ordinance requiring actions consistent with the  | 
| 10 |  | stormwater management plan. Use of the grant moneys must be  | 
| 11 |  | consistent with the stormwater management plan. 
 | 
| 12 |  |     (c) In the preparation of a stormwater management plan, a  | 
| 13 |  | county
stormwater management planning committee shall  | 
| 14 |  | coordinate the planning
process with each adjoining county to  | 
| 15 |  | ensure that recommended stormwater
projects will have no  | 
| 16 |  | significant impact on the levels or flows of
stormwaters in  | 
| 17 |  | inter-county watersheds or on the capacity of existing and
 | 
| 18 |  | planned stormwater retention facilities.  An adopted stormwater  | 
| 19 |  | management
plan shall identify steps taken by the county to  | 
| 20 |  | coordinate the development
of plan recommendations with  | 
| 21 |  | adjoining counties.
 | 
| 22 |  |     (d) (Blank).
 | 
| 23 |  |     (e) Prior to recommending the plan to the county board, the  | 
| 24 |  | stormwater
management planning committee shall hold at least  | 
| 25 |  | one public hearing thereon
and shall afford interested persons  | 
| 26 |  | an opportunity to be heard.  The hearing
shall be held in the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 5 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | county seat.  Notice of the hearing shall be published at
least  | 
| 2 |  | once no less than 15 days in advance thereof in a newspaper of  | 
| 3 |  | general
circulation published in the county.  The notice shall  | 
| 4 |  | state the time and place
of the hearing and the place where  | 
| 5 |  | copies of the proposed plan will be
accessible for examination  | 
| 6 |  | by interested parties.  If an affected municipality
having a  | 
| 7 |  | stormwater management plan adopted by ordinance wishes to  | 
| 8 |  | protest the
proposed county plan provisions, it shall appear at  | 
| 9 |  | the hearing and submit in
writing specific proposals to the  | 
| 10 |  | stormwater management planning committee.
After consideration  | 
| 11 |  | of the matters raised at the hearing, the committee may
amend  | 
| 12 |  | or approve the plan and recommend it to the county board for  | 
| 13 |  | adoption.
 | 
| 14 |  |     The county board may enact the proposed plan by ordinance.   | 
| 15 |  | If the
proposals for modification of the plan made by an  | 
| 16 |  | affected municipality having
a stormwater management plan are  | 
| 17 |  | not included in the proposed county plan,
and the municipality  | 
| 18 |  | affected by the plan opposes adoption of the county
plan by  | 
| 19 |  | resolution of its corporate authorities, approval of
the county  | 
| 20 |  | plan shall require an affirmative vote of at least two-thirds  | 
| 21 |  | of the
county board members present and voting.  If the county  | 
| 22 |  | board wishes to
amend the county plan, it shall submit in  | 
| 23 |  | writing specific proposals to the
stormwater management  | 
| 24 |  | planning committee.  If the proposals are not
approved by the  | 
| 25 |  | committee, or are opposed by resolution of the corporate
 | 
| 26 |  | authorities of an affected municipality having a municipal  | 
|     | 
| |  |  | 10000SB1337sam002 | - 6 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | stormwater
management plan, amendment of the plan shall require  | 
| 2 |  | an affirmative vote of
at least two-thirds of the county board  | 
| 3 |  | members present and voting.
 | 
| 4 |  |     (f) The county board may prescribe by ordinance reasonable  | 
| 5 |  | rules and
regulations for floodplain or stormwater management  | 
| 6 |  | and for governing the location,
width, course and release rate  | 
| 7 |  | of all stormwater runoff channels, streams
and basins in the  | 
| 8 |  | county, in accordance with the adopted stormwater
management  | 
| 9 |  | plan.  These rules and regulations shall, at a minimum, meet
the  | 
| 10 |  | standards for floodplain management established by the Office  | 
| 11 |  | of Water Resources and
the requirements of the Federal  | 
| 12 |  | Emergency Management Agency for participation
in the National  | 
| 13 |  | Flood Insurance Program.
 | 
| 14 |  |     (g) In accordance with, and if recommended in, the adopted  | 
| 15 |  | stormwater
management plan, the county board may adopt a  | 
| 16 |  | schedule of fees
as may be necessary to mitigate the effects of  | 
| 17 |  | increased stormwater runoff
resulting from new development.   | 
| 18 |  | The fees shall not exceed the cost of
satisfying the onsite  | 
| 19 |  | stormwater retention or detention requirements of the
adopted  | 
| 20 |  | stormwater management plan.  The fees shall be used to finance
 | 
| 21 |  | activities undertaken by the county or its included  | 
| 22 |  | municipalities to
mitigate the effects of urban stormwater  | 
| 23 |  | runoff by providing regional
stormwater retention or detention  | 
| 24 |  | facilities, as identified in the county
plan.  All such fees  | 
| 25 |  | collected by the county shall be held in a separate fund,
and  | 
| 26 |  | shall be expended only in the watershed within which they were  | 
|     | 
| |  |  | 10000SB1337sam002 | - 7 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | collected.
 | 
| 2 |  |     (h) For the purpose of implementing this Section and for  | 
| 3 |  | the
development, design, planning, construction, operation and  | 
| 4 |  | maintenance of
stormwater facilities provided for in the  | 
| 5 |  | stormwater management plan, a
county board that has established  | 
| 6 |  | a stormwater management planning
committee pursuant to this  | 
| 7 |  | Section may cause an annual tax of not to exceed
0.20% of the  | 
| 8 |  | value, as equalized or assessed by the Department of Revenue,
 | 
| 9 |  | of all taxable property in the county to be levied upon all the  | 
| 10 |  | taxable
property in the county.  The tax shall be in addition to  | 
| 11 |  | all other taxes
authorized by law to be levied and collected in  | 
| 12 |  | the county and shall be in
addition to the maximum tax rate  | 
| 13 |  | authorized by law for general county
purposes.  The 0.20%  | 
| 14 |  | limitation provided in this Section may be increased
or  | 
| 15 |  | decreased by referendum in accordance with the provisions of  | 
| 16 |  | Sections
18-120, 18-125, and 18-130 of the Property Tax Code.
 | 
| 17 |  |     Any revenues generated as a result of ownership or  | 
| 18 |  | operation of facilities
or land acquired with the tax funds  | 
| 19 |  | collected pursuant to this subsection
(h) shall be held in a  | 
| 20 |  | separate fund and be used either to abate such
property tax or  | 
| 21 |  | for implementing this Section.
 | 
| 22 |  |     However, unless at least part of the county has been  | 
| 23 |  | declared after
July 1, 1986 by presidential proclamation to be  | 
| 24 |  | a disaster area as a result
of flooding, the tax authorized by  | 
| 25 |  | this subsection (h) shall not be levied
until the question of  | 
| 26 |  | its adoption, either for a specified period or
indefinitely,  | 
|     | 
| |  |  | 10000SB1337sam002 | - 8 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | has been submitted to the electors thereof and approved by a
 | 
| 2 |  | majority of those voting on the question.  This question may be  | 
| 3 |  | submitted
at any election held in the county after the adoption  | 
| 4 |  | of a resolution by
the county board providing for the  | 
| 5 |  | submission of the question to the
electors of the county.  The  | 
| 6 |  | county board shall certify the resolution and
proposition to  | 
| 7 |  | the proper election officials, who shall submit the
proposition  | 
| 8 |  | at an election in accordance with the general election law.  If
 | 
| 9 |  | a majority of the votes cast on the question is in favor of the  | 
| 10 |  | levy of
the tax, it may thereafter be levied in the county for  | 
| 11 |  | the specified
period or indefinitely, as provided in the  | 
| 12 |  | proposition. The question shall
be put in substantially the  | 
| 13 |  | following form:
 | 
| 14 |  | ------------------------------------------------------------- 
 | 
| 15 |  |     Shall an annual tax be levied
 | 
| 16 |  | for stormwater management purposes            YES
 | 
| 17 |  | (for a period of not more than
 | 
| 18 |  | ...... years) at a rate not exceeding      ------------------
 | 
| 19 |  | .....% of the equalized assessed
 | 
| 20 |  | value of the taxable property of              NO
 | 
| 21 |  | ........ County?
 | 
| 22 |  | ------------------------------------------------------------- 
 | 
| 23 |  |     (i) Upon the creation and implementation of a county  | 
| 24 |  | stormwater management
plan, the county may petition the circuit  | 
| 25 |  | court to dissolve any or all drainage
districts created  | 
| 26 |  | pursuant to the Illinois Drainage Code or predecessor Acts
 | 
|     | 
| |  |  | 10000SB1337sam002 | - 9 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | which are located entirely within the area of the county  | 
| 2 |  | covered by the plan.
 | 
| 3 |  |     However, any active drainage district implementing a plan  | 
| 4 |  | that is
consistent with and at least as stringent as the county  | 
| 5 |  | stormwater
management plan may petition the stormwater  | 
| 6 |  | management planning committee
for exception from dissolution.   | 
| 7 |  | Upon filing of the petition, the committee
shall set a date for  | 
| 8 |  | hearing not less than 2 weeks, nor more than 4 weeks,
from the  | 
| 9 |  | filing thereof, and the committee shall give at least one  | 
| 10 |  | week's
notice of the hearing in one or more newspapers of  | 
| 11 |  | general circulation
within the district, and in addition shall  | 
| 12 |  | cause a copy of the notice to be
personally served upon each of  | 
| 13 |  | the trustees of the district.  At the
hearing, the committee  | 
| 14 |  | shall hear the district's petition and allow the
district  | 
| 15 |  | trustees and any interested parties an opportunity to present  | 
| 16 |  | oral
and written evidence.  The committee shall render its  | 
| 17 |  | decision upon the
petition for exception from dissolution based  | 
| 18 |  | upon the best interests of
the residents of the district.  In  | 
| 19 |  | the event that the exception is not
allowed, the district may  | 
| 20 |  | file a petition within 30 days of the decision
with the circuit  | 
| 21 |  | court.  In that case, the notice and hearing requirements
for  | 
| 22 |  | the court shall be the same as herein provided for the  | 
| 23 |  | committee.
The court shall likewise render its decision of  | 
| 24 |  | whether to dissolve the
district based upon the best interests  | 
| 25 |  | of residents of the district.
 | 
| 26 |  |     The dissolution of any drainage district shall not affect  | 
|     | 
| |  |  | 10000SB1337sam002 | - 10 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | the obligation
of any bonds issued or contracts entered into by  | 
| 2 |  | the district nor
invalidate the levy, extension or collection  | 
| 3 |  | of any taxes or special
assessments upon the property in the  | 
| 4 |  | former drainage district.  All property
and obligations of the  | 
| 5 |  | former drainage district shall be assumed and
managed by the  | 
| 6 |  | county, and the debts of the former drainage district shall
be  | 
| 7 |  | discharged as soon as practicable.
 | 
| 8 |  |     If a drainage district lies only partly within a county  | 
| 9 |  | that adopts a
county stormwater management plan, the county may  | 
| 10 |  | petition the circuit
court to disconnect from the drainage  | 
| 11 |  | district that portion of the district
that lies within that  | 
| 12 |  | county.  The property of the drainage district within the
 | 
| 13 |  | disconnected area shall be assumed and managed by the county.   | 
| 14 |  | The county shall
also assume a portion of the drainage  | 
| 15 |  | district's debt at the time of
disconnection, based on the  | 
| 16 |  | portion of the value of the taxable property of the
drainage  | 
| 17 |  | district which is located within the area being disconnected.
 | 
| 18 |  |     The operations of any drainage district that continues to  | 
| 19 |  | exist in a
county that has adopted a stormwater management plan  | 
| 20 |  | in accordance with
this Section shall be in accordance with the  | 
| 21 |  | adopted plan.
 | 
| 22 |  |     (j) Any county that has adopted a county stormwater  | 
| 23 |  | management plan
under this Section may, after 10 days written  | 
| 24 |  | notice to the owner or
occupant, enter upon any lands or waters  | 
| 25 |  | within the county for the purpose
of inspecting stormwater  | 
| 26 |  | facilities or causing the removal of any
obstruction to an  | 
|     | 
| |  |  | 10000SB1337sam002 | - 11 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | affected watercourse.  The county shall be responsible
for any  | 
| 2 |  | damages occasioned thereby.
 | 
| 3 |  |     (k) Upon petition of the municipality, and based on a  | 
| 4 |  | finding of the
stormwater management planning committee, the  | 
| 5 |  | county shall not enforce
rules and regulations adopted by the  | 
| 6 |  | county in any municipality located
wholly or partly within the  | 
| 7 |  | county that has a municipal stormwater
management ordinance  | 
| 8 |  | that is consistent with and at least as stringent as
the county  | 
| 9 |  | plan and ordinance, and is being enforced by the municipal
 | 
| 10 |  | authorities.
 | 
| 11 |  |     (l) A county may issue general obligation bonds for  | 
| 12 |  | implementing any
stormwater plan adopted under this Section in  | 
| 13 |  | the manner prescribed in
Section 5-1012; except that the  | 
| 14 |  | referendum requirement of Section 5-1012 shall
not apply to  | 
| 15 |  | bonds issued pursuant to this Section on which the principal  | 
| 16 |  | and
interest are to be paid entirely out of funds generated by  | 
| 17 |  | the taxes and fees
authorized by this Section.
 | 
| 18 |  |     (m) The powers authorized by this Section may be  | 
| 19 |  | implemented by the
county board for a portion of the county  | 
| 20 |  | subject to similar stormwater
management needs.
 | 
| 21 |  |     (n) The powers and taxes authorized by this Section are in  | 
| 22 |  | addition to the
powers and taxes authorized by Division 5-15;  | 
| 23 |  | in exercising its powers
under this Section, a county shall not  | 
| 24 |  | be subject to the restrictions and
requirements of that  | 
| 25 |  | Division.
 | 
| 26 |  |     (o) Pursuant to paragraphs (g) and (i) of Section 6 of  | 
|     | 
| |  |  | 10000SB1337sam002 | - 12 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | Article VII of
the Illinois Constitution, this Section  | 
| 2 |  | specifically denies and limits the
exercise of any power which  | 
| 3 |  | is inconsistent herewith by home rule units in
any county with  | 
| 4 |  | a population of less than 1,500,000 in the area served by
the  | 
| 5 |  | Chicago Metropolitan Agency for Planning Northeastern Illinois  | 
| 6 |  | Planning Commission.  This Section does not
prohibit the  | 
| 7 |  | concurrent exercise of powers consistent herewith.
 | 
| 8 |  |     (p) As used in this Section: | 
| 9 |  |     "Urban flooding" means the flooding of public and private  | 
| 10 |  | land in urban communities that results from stormwater or  | 
| 11 |  | snowmelt runoff overwhelming the existing drainage  | 
| 12 |  | infrastructure, unrelated to the overflow of any river or lake,  | 
| 13 |  | whether or not that land is located in or near a floodplain. | 
| 14 |  |     "Urbanized areas" means a statistical geographic entity  | 
| 15 |  | consisting of a densely settled core created from census tracts  | 
| 16 |  | or blocks and contiguous qualifying territory that together  | 
| 17 |  | have a minimum population of at least 50,000 persons and has  | 
| 18 |  | been delineated as an urbanized area by the United States  | 
| 19 |  | Census Bureau after the most recent decennial census.  | 
| 20 |  | (Source: P.A. 97-916, eff. 8-9-12.)
 | 
| 21 |  |     (55 ILCS 5/5-1062.2) | 
| 22 |  |     Sec. 5-1062.2. Stormwater management. | 
| 23 |  |     (a) The purpose of this Section is to allow management and  | 
| 24 |  | mitigation of the effects of urbanization on stormwater  | 
| 25 |  | drainage in the metropolitan counties of Madison, St. Clair,  | 
|     | 
| |  |  | 10000SB1337sam002 | - 13 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and Boone  | 
| 2 |  | as well as all counties containing all or a part of an  | 
| 3 |  | urbanized area and references to "county" in this Section apply  | 
| 4 |  | only to those counties. This Section does not apply to counties  | 
| 5 |  | in the Chicago Metropolitan Agency for Planning Northeastern  | 
| 6 |  | Illinois Planning Commission that  are granted authorities in  | 
| 7 |  | Section 5-1062.  The purpose of this Section shall be achieved  | 
| 8 |  | by: | 
| 9 |  |         (1) Consolidating the existing stormwater management
  | 
| 10 |  | framework into a united, countywide structure. | 
| 11 |  |         (2) Setting minimum standards for floodplain and
  | 
| 12 |  | stormwater management with an emphasis on the use of  | 
| 13 |  | cost-effective solutions to flooding problems. | 
| 14 |  |         (3) Preparing a countywide plan for the management
 of  | 
| 15 |  | stormwater runoff, including the management of natural and  | 
| 16 |  | man-made drainageways. The countywide plan may incorporate  | 
| 17 |  | watershed plans and shall evaluate and address flooding  | 
| 18 |  | problems that exist in urbanized areas that are a result of  | 
| 19 |  | urban flooding. | 
| 20 |  |     (a-5) This Section also applies to all counties not  | 
| 21 |  | otherwise covered in Section 5-1062, 5-1062.2, or 5-1062.3 if  | 
| 22 |  | the question of allowing the county board to establish a  | 
| 23 |  | stormwater management planning council has been submitted to  | 
| 24 |  | the electors of the county and approved by a majority of those  | 
| 25 |  | voting on the question.  | 
| 26 |  |     (b) A stormwater management planning committee may be  | 
|     | 
| |  |  | 10000SB1337sam002 | - 14 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | established by county board resolution, with its membership  | 
| 2 |  | consisting of equal numbers of county board and municipal  | 
| 3 |  | representatives from each county board district, one member  | 
| 4 |  | representing drainage districts, and one member representing  | 
| 5 |  | soil and water conservation districts and such other members as  | 
| 6 |  | may be determined by the stormwater management planning  | 
| 7 |  | committee county and municipal members. If the county has more  | 
| 8 |  | than 6 county board districts, however, the county board may by  | 
| 9 |  | ordinance divide the county into not less than 6 areas of  | 
| 10 |  | approximately equal population, to be used instead of county  | 
| 11 |  | board districts for the purpose of determining representation  | 
| 12 |  | on the stormwater management planning committee. | 
| 13 |  |     The county board members shall be appointed by the chairman  | 
| 14 |  | of the county board. Municipal members from each county board  | 
| 15 |  | district or other represented area shall be appointed by a  | 
| 16 |  | majority vote of the mayors of those municipalities that  have  | 
| 17 |  | the greatest percentage of their respective populations  | 
| 18 |  | residing in that county board district or other represented  | 
| 19 |  | area. The member representing drainage districts shall be  | 
| 20 |  | appointed by the drainage district chairperson or by a majority  | 
| 21 |  | vote of all drainage district chairpersons in the county if  | 
| 22 |  | more than one drainage district exists in the county. The  | 
| 23 |  | member representing soil and water conservation districts  | 
| 24 |  | shall be appointed by a majority vote of the soil and water  | 
| 25 |  | conservation district board or by a majority vote of all soil  | 
| 26 |  | and water conservation district boards in the county if more  | 
|     | 
| |  |  | 10000SB1337sam002 | - 15 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | than one soil and water conservation district board exists in  | 
| 2 |  | the county. All municipal, and county board, drainage district,  | 
| 3 |  | and soil and water conservation district representatives shall  | 
| 4 |  | be entitled to a vote; the other members shall be nonvoting  | 
| 5 |  | members, unless authorized to vote by the unanimous consent of  | 
| 6 |  | the voting members of the committee; however, Madison, St.  | 
| 7 |  | Clair, Monroe, Kankakee, Grundy, LaSalle, DeKalb, Kendall, and  | 
| 8 |  | Boone counties are not required to have a drainage district or  | 
| 9 |  | a soil and water conservation representative the municipal and  | 
| 10 |  | county board representatives. A municipality that is located in  | 
| 11 |  | more than one county may choose, at the time of formation of  | 
| 12 |  | the stormwater management planning committee and based on  | 
| 13 |  | watershed boundaries, to participate in the stormwater  | 
| 14 |  | management planning program of either or both of the counties.  | 
| 15 |  | Subcommittees of the stormwater management planning committee  | 
| 16 |  | may be established to serve a portion of the county or a  | 
| 17 |  | particular drainage basin that has similar stormwater  | 
| 18 |  | management needs. The stormwater management planning committee  | 
| 19 |  | shall adopt bylaws, by a majority vote of the county and  | 
| 20 |  | municipal members, to govern the functions of the committee and  | 
| 21 |  | its subcommittees. Officers of the committee shall include a  | 
| 22 |  | chair and vice chair, one of whom shall be a county  | 
| 23 |  | representative and one a municipal representative. | 
| 24 |  |     The principal duties of the committee shall be to develop a  | 
| 25 |  | stormwater management plan for presentation to and approval by  | 
| 26 |  | the county board, and to direct the plan's implementation and  | 
|     | 
| |  |  | 10000SB1337sam002 | - 16 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | revision. The committee may retain engineering, legal, and  | 
| 2 |  | financial advisors and inspection personnel. The committee  | 
| 3 |  | shall meet at least quarterly and shall hold at least one  | 
| 4 |  | public meeting during the preparation of the plan and prior to  | 
| 5 |  | its submittal to the county board. The committee may make  | 
| 6 |  | grants to: (1) units of local government; (2) not-for-profit  | 
| 7 |  | organizations; and (3) landowners. In order for a municipality  | 
| 8 |  | located partially or wholly within a mapped floodplain to  | 
| 9 |  | receive grant moneys, the municipality must be a member in the  | 
| 10 |  | Federal Emergency Management Agency's National Flood Insurance  | 
| 11 |  | Program.  A municipality receiving grant moneys must that have  | 
| 12 |  | adopted an ordinance requiring actions consistent with the  | 
| 13 |  | stormwater management plan. Use and to landowners for the  | 
| 14 |  | purposes of stormwater management, including special projects;  | 
| 15 |  | use of the grant money must be consistent with the stormwater  | 
| 16 |  | management plan. | 
| 17 |  |     The committee shall not have or exercise any power of  | 
| 18 |  | eminent domain.
 | 
| 19 |  |     (c) In the preparation of a stormwater management plan, a  | 
| 20 |  | county stormwater management planning committee shall  | 
| 21 |  | coordinate the planning process with each adjoining county to  | 
| 22 |  | ensure that recommended stormwater projects will have no  | 
| 23 |  | significant impact on the levels or flows of stormwaters in  | 
| 24 |  | inter-county watersheds or on the capacity of existing and  | 
| 25 |  | planned stormwater retention facilities. An adopted stormwater  | 
| 26 |  | management plan shall identify steps taken by the county to  | 
|     | 
| |  |  | 10000SB1337sam002 | - 17 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | coordinate the development of plan recommendations with  | 
| 2 |  | adjoining counties. | 
| 3 |  |     (d) The stormwater management committee may not enforce any  | 
| 4 |  | rules or regulations that would interfere with (i) any power  | 
| 5 |  | granted by the Illinois Drainage Code (70 ILCS 605/) to  | 
| 6 |  | operate, construct, maintain, or improve drainage systems or  | 
| 7 |  | (ii) the ability to operate, maintain, or improve the drainage  | 
| 8 |  | systems used on or by land or a facility used for production  | 
| 9 |  | agriculture purposes, as defined in the Use Tax Act (35 ILCS  | 
| 10 |  | 105/), except newly constructed buildings and newly installed  | 
| 11 |  | impervious paved surfaces.  Disputes regarding an exception  | 
| 12 |  | shall be determined by a mutually agreed upon arbitrator paid  | 
| 13 |  | by the disputing party or parties. | 
| 14 |  |     (e)                     Before the stormwater management planning committee  | 
| 15 |  | recommends to the county board a stormwater management plan for  | 
| 16 |  | the county or a portion thereof, it shall submit the plan to  | 
| 17 |  | the Office of Water Resources of the Department of Natural  | 
| 18 |  | Resources for review and recommendations. The Office, in  | 
| 19 |  | reviewing the plan, shall consider such factors as impacts on  | 
| 20 |  | the levels or flows in rivers and streams and the cumulative  | 
| 21 |  | effects of stormwater discharges on flood levels. The Office of  | 
| 22 |  | Water Resources shall determine whether the plan or ordinances  | 
| 23 |  | enacted to implement the plan complies with the requirements of  | 
| 24 |  | subsection (f). Within a period not to exceed 60 days, the  | 
| 25 |  | review comments and recommendations shall be submitted to the  | 
| 26 |  | stormwater management planning committee for consideration.  | 
|     | 
| |  |  | 10000SB1337sam002 | - 18 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | Any amendments to the plan shall be submitted to the Office for  | 
| 2 |  | review. | 
| 3 |  |     (f) Prior to recommending the plan to the county board, the  | 
| 4 |  | stormwater management planning committee shall hold at least  | 
| 5 |  | one public hearing thereon and shall afford interested persons  | 
| 6 |  | an opportunity to be heard. The hearing shall be held in the  | 
| 7 |  | county seat. Notice of the hearing shall be published at least  | 
| 8 |  | once no less than 15 days in advance of the hearing in a  | 
| 9 |  | newspaper of general circulation published in the county. The  | 
| 10 |  | notice shall state the time and place of the hearing and the  | 
| 11 |  | place where copies of the proposed plan will be accessible for  | 
| 12 |  | examination by interested parties. If an affected municipality  | 
| 13 |  | having a stormwater management plan adopted by ordinance wishes  | 
| 14 |  | to protest the proposed county plan provisions, it shall appear  | 
| 15 |  | at the hearing and submit in writing specific proposals to the  | 
| 16 |  | stormwater management planning committee. After consideration  | 
| 17 |  | of the matters raised at the hearing, the committee may amend  | 
| 18 |  | or approve the plan and recommend it to the county board for  | 
| 19 |  | adoption. | 
| 20 |  |     The county board may enact the proposed plan by ordinance.  | 
| 21 |  | If the proposals for modification of the plan made by an  | 
| 22 |  | affected municipality having a stormwater management plan are  | 
| 23 |  | not included in the proposed county plan, and the municipality  | 
| 24 |  | affected by the plan opposes adoption of the county plan by  | 
| 25 |  | resolution of its corporate authorities, approval of the county  | 
| 26 |  | plan shall require an affirmative vote of at least two-thirds  | 
|     | 
| |  |  | 10000SB1337sam002 | - 19 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | of the county board members present and voting. If the county  | 
| 2 |  | board wishes to amend the county plan, it shall submit in  | 
| 3 |  | writing specific proposals to the stormwater management  | 
| 4 |  | planning committee. If the proposals are not approved by the  | 
| 5 |  | committee, or are opposed by resolution of the corporate  | 
| 6 |  | authorities of an affected municipality having a municipal  | 
| 7 |  | stormwater management plan, amendment of the plan shall require  | 
| 8 |  | an affirmative vote of at least two-thirds of the county board  | 
| 9 |  | members present and voting. | 
| 10 |  |     (g) The county board may prescribe by ordinance reasonable  | 
| 11 |  | rules and regulations for floodplain or stormwater management  | 
| 12 |  | and for governing the location, width, course, and release rate  | 
| 13 |  | of all stormwater runoff channels, streams, and basins in the  | 
| 14 |  | county, in accordance with the adopted stormwater management  | 
| 15 |  | plan. Land, facilities, and drainage district facilities used  | 
| 16 |  | for production agriculture as defined in subsection (d) shall  | 
| 17 |  | not be subjected to regulation by the county board or  | 
| 18 |  | stormwater management committee under this Section for  | 
| 19 |  | floodplain management and for governing location, width,  | 
| 20 |  | course, maintenance, and release rate of stormwater runoff  | 
| 21 |  | channels, streams and basins, or water discharged from a  | 
| 22 |  | drainage district.  These rules and regulations shall, at a  | 
| 23 |  | minimum, meet the standards for floodplain management  | 
| 24 |  | established by the Office of Water Resources and the  | 
| 25 |  | requirements of the Federal Emergency Management Agency for  | 
| 26 |  | participation in the National Flood Insurance Program. The  | 
|     | 
| |  |  | 10000SB1337sam002 | - 20 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | Commission may not impose more stringent regulations regarding  | 
| 2 |  | water quality on entities discharging in accordance with a  | 
| 3 |  | valid National Pollution Discharge Elimination System permit  | 
| 4 |  | issued under the Environmental Protection Act. | 
| 5 |  |     (h) In accordance with, and if recommended in, the adopted  | 
| 6 |  | stormwater management plan, the county board may adopt a  | 
| 7 |  | schedule of fees as may be necessary to mitigate the effects of  | 
| 8 |  | increased stormwater runoff resulting from new development  | 
| 9 |  | based on actual costs. The fees shall not exceed the cost of  | 
| 10 |  | satisfying the onsite stormwater retention or detention  | 
| 11 |  | requirements of the adopted stormwater management plan. The  | 
| 12 |  | fees shall be used to finance activities undertaken by the  | 
| 13 |  | county or its included municipalities to mitigate the effects  | 
| 14 |  | of urban stormwater runoff by providing regional stormwater  | 
| 15 |  | retention or detention facilities, as identified in the county  | 
| 16 |  | plan. The county board shall provide for a credit or reduction  | 
| 17 |  | in fees for any onsite retention, detention, drainage district  | 
| 18 |  | assessments, or other similar stormwater facility that the  | 
| 19 |  | developer is required to construct consistent with the  | 
| 20 |  | stormwater management ordinance. All these fees collected by  | 
| 21 |  | the county shall be held in a separate fund, and shall be  | 
| 22 |  | expended only in the watershed within which they were  | 
| 23 |  | collected. | 
| 24 |  |     (i) For the purpose of implementing this Section and for  | 
| 25 |  | the development, design, planning, construction, operation,  | 
| 26 |  | and maintenance of stormwater facilities provided for in the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 21 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | stormwater management plan, a county board that has established  | 
| 2 |  | a stormwater management planning committee pursuant to this  | 
| 3 |  | Section may cause an annual tax of not to exceed 0.20% of the  | 
| 4 |  | value, as equalized or assessed by the Department of Revenue,  | 
| 5 |  | of all taxable property in the county to be levied upon all the  | 
| 6 |  | taxable property in the county or occupation and use taxes of  | 
| 7 |  | 1/10 of one cent. The property tax shall be in addition to all  | 
| 8 |  | other taxes authorized by law to be levied and collected in the  | 
| 9 |  | county and shall be in addition to the maximum tax rate  | 
| 10 |  | authorized by law for general county purposes. The 0.20%  | 
| 11 |  | limitation provided in this Section may be increased or  | 
| 12 |  | decreased by referendum at a general election in accordance  | 
| 13 |  | with the provisions of Sections 18-120, 18-125, and 18-130 of  | 
| 14 |  | the Property Tax Code (35 ILCS 200/). | 
| 15 |  |     Any revenues generated as a result of ownership or  | 
| 16 |  | operation of facilities or land acquired with the tax funds  | 
| 17 |  | collected pursuant to this subsection shall be held in a  | 
| 18 |  | separate fund and be used either to abate such property tax or  | 
| 19 |  | for implementing this Section. | 
| 20 |  |     However, the tax authorized by this subsection shall not be  | 
| 21 |  | levied until the question of its adoption, either for a  | 
| 22 |  | specified period or indefinitely, has been submitted to the  | 
| 23 |  | electors thereof and approved by a majority of those voting on  | 
| 24 |  | the question. This question may be submitted at any general  | 
| 25 |  | election held in the county after the adoption of a resolution  | 
| 26 |  | by the county board providing for the submission of the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 22 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | question to the electors of the county. The county board shall  | 
| 2 |  | certify the resolution and proposition to the proper election  | 
| 3 |  | officials, who shall submit the proposition at an election in  | 
| 4 |  | accordance with the general election law. If a majority of the  | 
| 5 |  | votes cast on the question is in favor of the levy of the tax,  | 
| 6 |  | it may thereafter be levied in the county for the specified  | 
| 7 |  | period or indefinitely, as provided in the proposition. The  | 
| 8 |  | question shall be put in substantially the following form: | 
| 9 |  |         Shall an annual tax be levied
for stormwater management  | 
| 10 |  | purposes            (for a period of not more than ..... years) at a  | 
| 11 |  | rate not exceeding
.....% of the equalized assessed
value  | 
| 12 |  | of the taxable property of              ..... County?
 | 
| 13 |  | Or this question may be submitted at any general election held  | 
| 14 |  | in the county after the adoption of a resolution by the county  | 
| 15 |  | board providing for the submission of the question to the  | 
| 16 |  | electors of the county to authorize use and occupation taxes of  | 
| 17 |  | 1/10 of one cent: | 
| 18 |  |         Shall use and occupation taxes be raised for stormwater  | 
| 19 |  | management purposes (for a period of not more than .....  | 
| 20 |  | years) at a rate of 1/10 of one cent for taxable goods in  | 
| 21 |  | ..... County? | 
| 22 |  |     Votes shall be recorded as Yes or No.
 | 
| 23 |  |     (j) For those counties that adopt a property tax in  | 
| 24 |  | accordance with the provisions in this Section, the stormwater  | 
| 25 |  | management committee shall offer property tax abatements or  | 
| 26 |  | incentive payments to property owners who construct, maintain,  | 
|     | 
| |  |  | 10000SB1337sam002 | - 23 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | and use approved stormwater management devices.  For those  | 
| 2 |  | counties that adopt use and occupation taxes in accordance with  | 
| 3 |  | the provisions of this Section, the stormwater management  | 
| 4 |  | committee may offer tax rebates or incentive payments to  | 
| 5 |  | property owners who construct, maintain, and use approved  | 
| 6 |  | stormwater management devices.
The stormwater management  | 
| 7 |  | committee is authorized to offer credits to the property tax,  | 
| 8 |  | if applicable, based on authorized practices consistent with  | 
| 9 |  | the stormwater management plan and approved by the committee.  | 
| 10 |  | Expenses of staff of a stormwater management committee that are  | 
| 11 |  | expended on regulatory project review may be no more than 20%  | 
| 12 |  | of the annual budget of the committee, including funds raised  | 
| 13 |  | under subsections (h) and (i). | 
| 14 |  |     (k) Any county that has adopted a county stormwater  | 
| 15 |  | management plan under this Section may, after 10 days written  | 
| 16 |  | notice receiving consent of the owner or occupant, enter upon  | 
| 17 |  | any lands or waters within the county for the purpose of  | 
| 18 |  | inspecting stormwater facilities or causing the removal of any  | 
| 19 |  | obstruction to an affected watercourse. If consent is denied or  | 
| 20 |  | cannot be reasonably obtained, the county ordinance shall  | 
| 21 |  | provide a process or procedure for an administrative warrant to  | 
| 22 |  | be obtained. The county shall be responsible for any damages  | 
| 23 |  | occasioned thereby. | 
| 24 |  |     (l) Upon petition of the municipality, and based on a  | 
| 25 |  | finding of the stormwater management planning committee, the  | 
| 26 |  | county shall not enforce rules and regulations adopted by the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 24 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | county in any municipality located wholly or partly within the  | 
| 2 |  | county that has a municipal stormwater management ordinance  | 
| 3 |  | that is consistent with and at least as stringent as the county  | 
| 4 |  | plan and ordinance, and is being enforced by the municipal  | 
| 5 |  | authorities.  On issues that the county ordinance is more  | 
| 6 |  | stringent as deemed by the committee, the county shall only  | 
| 7 |  | enforce rules and regulations adopted by the county on the more  | 
| 8 |  | stringent issues and accept municipal permits.  The county shall  | 
| 9 |  | have no more than 60 days to review permits or the permits  | 
| 10 |  | shall be deemed approved. | 
| 11 |  |     (m) A county may issue general obligation bonds for  | 
| 12 |  | implementing any stormwater plan adopted under this Section in  | 
| 13 |  | the manner prescribed in Section 5-1012; except that the  | 
| 14 |  | referendum requirement of Section 5-1012 does not apply to  | 
| 15 |  | bonds issued pursuant to this Section on which the principal  | 
| 16 |  | and interest are to be paid entirely out of funds generated by  | 
| 17 |  | the taxes and fees authorized by this Section. | 
| 18 |  |     (n) The powers authorized by this Section may be  | 
| 19 |  | implemented by the county board for a portion of the county  | 
| 20 |  | subject to similar stormwater management needs. | 
| 21 |  |     (o) The powers and taxes authorized by this Section are in  | 
| 22 |  | addition to the powers and taxes authorized by Division 5-15;  | 
| 23 |  | in exercising its powers under this Section, a county shall not  | 
| 24 |  | be subject to the restrictions and requirements of that  | 
| 25 |  | Division.
 | 
| 26 |  |     (p) As used in this Section: | 
|     | 
| |  |  | 10000SB1337sam002 | - 25 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  |     "Urban flooding" means the flooding of public and private  | 
| 2 |  | land in urban communities that results from stormwater or  | 
| 3 |  | snowmelt runoff overwhelming the existing drainage  | 
| 4 |  | infrastructure, unrelated to the overflow of any river or lake,  | 
| 5 |  | whether or not that land is located in or near a floodplain. | 
| 6 |  |     "Urbanized areas" means a statistical geographic entity  | 
| 7 |  | consisting of a densely settled core created from census tracts  | 
| 8 |  | or blocks and contiguous qualifying territory that together  | 
| 9 |  | have a minimum population of at least 50,000 persons and has  | 
| 10 |  | been delineated as an urbanized area by the United States  | 
| 11 |  | Census Bureau  after the most recent decennial census.  | 
| 12 |  | (Source: P.A. 94-675, eff. 8-23-05.)
 | 
| 13 |  |     (55 ILCS 5/5-1062.3) | 
| 14 |  |     Sec. 5-1062.3. Stormwater management; DuPage and Peoria  | 
| 15 |  | Counties. | 
| 16 |  |     (a) The purpose of this Section is to allow management and  | 
| 17 |  | mitigation of the effects of urbanization on stormwater  | 
| 18 |  | drainage in the metropolitan counties of DuPage and Peoria, and  | 
| 19 |  | references to "county" in this Section apply only to those  | 
| 20 |  | counties. This Section does not apply to a municipality that  | 
| 21 |  | only partially lies within one of these counties and, on the  | 
| 22 |  | effective date of this amendatory Act of the 98th General  | 
| 23 |  | Assembly, is served by an existing Section in the Counties Code  | 
| 24 |  | regarding stormwater management. The purpose of this Section  | 
| 25 |  | shall be achieved by: | 
|     | 
| |  |  | 10000SB1337sam002 | - 26 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  |         (1) consolidating the existing stormwater management  | 
| 2 |  | framework into a
united, countywide structure; | 
| 3 |  |         (2) setting minimum standards for floodplain and  | 
| 4 |  | stormwater management with an emphasis on the use of  | 
| 5 |  | cost-effective solutions to flooding problems;
and | 
| 6 |  |         (3) preparing a countywide plan for the management of  | 
| 7 |  | stormwater runoff,
including the management of natural and  | 
| 8 |  | man-made drainageways.  The countywide
plan may incorporate  | 
| 9 |  | watershed plans and shall evaluate and address flooding  | 
| 10 |  | problems that exist in urbanized areas that are a result of  | 
| 11 |  | urban flooding. | 
| 12 |  |     (b) A stormwater management planning committee may be  | 
| 13 |  | established by county board resolution, with its membership  | 
| 14 |  | consisting of equal numbers of county board and municipal  | 
| 15 |  | representatives from each county board district, and such other  | 
| 16 |  | members as may be determined by the county and municipal  | 
| 17 |  | members. If the county has more than 6 county board districts,  | 
| 18 |  | however, the county board may by ordinance divide the county  | 
| 19 |  | into not less than 6 areas of approximately equal population,  | 
| 20 |  | to be used instead of county board districts for the purpose of  | 
| 21 |  | determining representation on the stormwater management  | 
| 22 |  | planning committee. | 
| 23 |  |     The county board members shall be appointed by the chairman  | 
| 24 |  | of the county board. Municipal members from each county board  | 
| 25 |  | district or other represented area shall be appointed by a  | 
| 26 |  | majority vote of the mayors of those municipalities that  have  | 
|     | 
| |  |  | 10000SB1337sam002 | - 27 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | the greatest percentage of their respective populations  | 
| 2 |  | residing in that county board district or other represented  | 
| 3 |  | area. All municipal and county board representatives shall be  | 
| 4 |  | entitled to a vote; the other members shall be nonvoting  | 
| 5 |  | members, unless authorized to vote by the unanimous consent of  | 
| 6 |  | the municipal and county board representatives. A municipality  | 
| 7 |  | that is located in more than one county may choose, at the time  | 
| 8 |  | of formation of the stormwater management planning committee  | 
| 9 |  | and based on watershed boundaries, to participate in the  | 
| 10 |  | stormwater management planning program of either county.  | 
| 11 |  | Subcommittees of the stormwater management planning committee  | 
| 12 |  | may be established to serve a portion of the county or a  | 
| 13 |  | particular drainage basin that has similar stormwater  | 
| 14 |  | management needs. The stormwater management planning committee  | 
| 15 |  | shall adopt bylaws, by a majority vote of the county and  | 
| 16 |  | municipal members, to govern the functions of the committee and  | 
| 17 |  | its subcommittees. Officers of the committee shall include a  | 
| 18 |  | chair and vice chair, one of whom shall be a county  | 
| 19 |  | representative and one a municipal representative. | 
| 20 |  |     The principal duties of the committee shall be to develop a  | 
| 21 |  | stormwater management plan for presentation to and approval by  | 
| 22 |  | the county board, and to direct the plan's implementation and  | 
| 23 |  | revision. The committee may retain engineering, legal, and  | 
| 24 |  | financial advisors and inspection personnel. The committee  | 
| 25 |  | shall meet at least quarterly and shall hold at least one  | 
| 26 |  | public meeting during the preparation of the plan and prior to  | 
|     | 
| |  |  | 10000SB1337sam002 | - 28 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | its submittal to the county board. The committee may make  | 
| 2 |  | grants to: (1) units of local government; (2) not-for-profit  | 
| 3 |  | organizations; and (3) landowners. In order for a municipality  | 
| 4 |  | located partially or wholly within a mapped floodplain to  | 
| 5 |  | receive grant moneys, the municipality must be a member in the  | 
| 6 |  | Federal Emergency Management Agency's National Flood Insurance  | 
| 7 |  | Program.  A municipality receiving grant moneys must that have  | 
| 8 |  | adopted an ordinance requiring actions consistent with the  | 
| 9 |  | stormwater management plan. Use and to landowners for the  | 
| 10 |  | purposes of stormwater management, including special projects;  | 
| 11 |  | use of the grant money must be consistent with the stormwater  | 
| 12 |  | management plan. | 
| 13 |  |     The committee shall not have or exercise any power of  | 
| 14 |  | eminent domain. | 
| 15 |  |     (c) In the preparation of a stormwater management plan, a  | 
| 16 |  | county stormwater management planning committee shall  | 
| 17 |  | coordinate the planning process with each adjoining county to  | 
| 18 |  | ensure that recommended stormwater projects will have no  | 
| 19 |  | significant impact on the levels or flows of stormwaters in  | 
| 20 |  | inter-county watersheds or on the capacity of existing and  | 
| 21 |  | planned stormwater retention facilities. An adopted stormwater  | 
| 22 |  | management plan shall identify steps taken by the county to  | 
| 23 |  | coordinate the development of plan recommendations with  | 
| 24 |  | adjoining counties. | 
| 25 |  |     (d) The stormwater management committee may not enforce any  | 
| 26 |  | rules or regulations that would interfere with (i) any power  | 
|     | 
| |  |  | 10000SB1337sam002 | - 29 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | granted by the Illinois Drainage Code (70 ILCS 605/) to  | 
| 2 |  | operate, construct, maintain, or improve drainage systems or  | 
| 3 |  | (ii) the ability to operate, maintain, or improve the drainage  | 
| 4 |  | systems used on or by land or a facility used for production  | 
| 5 |  | agriculture purposes, as defined in the Use Tax Act (35 ILCS  | 
| 6 |  | 105/), except newly constructed buildings and newly installed  | 
| 7 |  | impervious paved surfaces.  Disputes regarding an exception  | 
| 8 |  | shall be determined by a mutually agreed upon arbitrator paid  | 
| 9 |  | by the disputing party or parties. | 
| 10 |  |     (e)                     Before the stormwater management planning committee  | 
| 11 |  | recommends to the county board a stormwater management plan for  | 
| 12 |  | the county or a portion thereof, it shall submit the plan to  | 
| 13 |  | the Office of Water Resources of the Department of Natural  | 
| 14 |  | Resources for review and recommendations. The Office, in  | 
| 15 |  | reviewing the plan, shall consider such factors as impacts on  | 
| 16 |  | the levels or flows in rivers and streams and the cumulative  | 
| 17 |  | effects of stormwater discharges on flood levels. The Office of  | 
| 18 |  | Water Resources shall determine whether the plan or ordinances  | 
| 19 |  | enacted to implement the plan complies with the requirements of  | 
| 20 |  | subsection (f). Within a period not to exceed 60 days, the  | 
| 21 |  | review comments and recommendations shall be submitted to the  | 
| 22 |  | stormwater management planning committee for consideration.  | 
| 23 |  | Any amendments to the plan shall be submitted to the Office for  | 
| 24 |  | review. | 
| 25 |  |     (f) Prior to recommending the plan to the county board, the  | 
| 26 |  | stormwater management planning committee shall hold at least  | 
|     | 
| |  |  | 10000SB1337sam002 | - 30 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | one public hearing thereon and shall afford interested persons  | 
| 2 |  | an opportunity to be heard. The hearing shall be held in the  | 
| 3 |  | county seat. Notice of the hearing shall be published at least  | 
| 4 |  | once and no less than 15 days in advance of the hearing in a  | 
| 5 |  | newspaper of general circulation published in the county. The  | 
| 6 |  | notice shall state the time and place of the hearing and the  | 
| 7 |  | place where copies of the proposed plan will be accessible for  | 
| 8 |  | examination by interested parties. If an affected municipality  | 
| 9 |  | having a stormwater management plan adopted by ordinance wishes  | 
| 10 |  | to protest the proposed county plan provisions, it shall appear  | 
| 11 |  | at the hearing and submit in writing specific proposals to the  | 
| 12 |  | stormwater management planning committee. After consideration  | 
| 13 |  | of the matters raised at the hearing, the committee may amend  | 
| 14 |  | or approve the plan and recommend it to the county board for  | 
| 15 |  | adoption. | 
| 16 |  |     The county board may enact the proposed plan by ordinance.  | 
| 17 |  | If the proposals for modification of the plan made by an  | 
| 18 |  | affected municipality having a stormwater management plan are  | 
| 19 |  | not included in the proposed county plan, and the municipality  | 
| 20 |  | affected by the plan opposes adoption of the county plan by  | 
| 21 |  | resolution of its corporate authorities, approval of the county  | 
| 22 |  | plan shall require an affirmative vote of at least two-thirds  | 
| 23 |  | of the county board members present and voting. If the county  | 
| 24 |  | board wishes to amend the county plan, it shall submit in  | 
| 25 |  | writing specific proposals to the stormwater management  | 
| 26 |  | planning committee. If the proposals are not approved by the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 31 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | committee, or are opposed by resolution of the corporate  | 
| 2 |  | authorities of an affected municipality having a municipal  | 
| 3 |  | stormwater management plan, amendment of the plan shall require  | 
| 4 |  | an affirmative vote of at least two-thirds of the county board  | 
| 5 |  | members present and voting. | 
| 6 |  |     (g) The county board may prescribe by ordinance reasonable  | 
| 7 |  | rules and regulations for floodplain or stormwater management  | 
| 8 |  | and for governing the location, width, course, and release rate  | 
| 9 |  | of all stormwater runoff channels, streams, and basins in the  | 
| 10 |  | county, in accordance with the adopted stormwater management  | 
| 11 |  | plan. Land, facilities, and drainage district facilities used  | 
| 12 |  | for production agriculture as defined in subsection (d) shall  | 
| 13 |  | not be subjected to regulation by the county board or  | 
| 14 |  | stormwater management committee under this Section for  | 
| 15 |  | floodplain management and for governing location, width,  | 
| 16 |  | course, maintenance, and release rate of stormwater runoff  | 
| 17 |  | channels, streams and basins, or water discharged from a  | 
| 18 |  | drainage district.  These rules and regulations shall, at a  | 
| 19 |  | minimum, meet the standards for floodplain management  | 
| 20 |  | established by the Office of Water Resources and the  | 
| 21 |  | requirements of the Federal Emergency Management Agency for  | 
| 22 |  | participation in the National Flood Insurance Program. With  | 
| 23 |  | respect to DuPage County only, the Chicago Metropolitan Agency  | 
| 24 |  | for Planning may not impose more stringent regulations  | 
| 25 |  | regarding water quality on entities discharging in accordance  | 
| 26 |  | with a valid National Pollution Discharge Elimination System  | 
|     | 
| |  |  | 10000SB1337sam002 | - 32 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | permit issued under the Environmental Protection Act. | 
| 2 |  |     (h) For the purpose of implementing this Section and for  | 
| 3 |  | the development, design, planning, construction, operation,  | 
| 4 |  | and maintenance of stormwater facilities provided for in the  | 
| 5 |  | adopted stormwater management plan, a county board that has  | 
| 6 |  | established a stormwater management planning committee  | 
| 7 |  | pursuant to this Section or has participated in a stormwater  | 
| 8 |  | management planning process may adopt a schedule of fees  | 
| 9 |  | applicable to all real property within the county which  | 
| 10 |  | benefits from the county's stormwater management facilities  | 
| 11 |  | and activities, and as may be necessary to mitigate the effects  | 
| 12 |  | of increased stormwater runoff resulting from development. The  | 
| 13 |  | total amount of the fees assessed must be specifically and  | 
| 14 |  | uniquely attributable to the actual costs of the county in the  | 
| 15 |  | preparation, administration, and implementation of the  adopted  | 
| 16 |  | stormwater management plan, construction and maintenance of  | 
| 17 |  | stormwater facilities, and other activities related to the  | 
| 18 |  | management of the runoff from the property.      The individual fees  | 
| 19 |  | must be specifically and uniquely attributable to  the portion  | 
| 20 |  | of the actual cost to the county of managing the runoff from  | 
| 21 |  | the property. The fees shall be used to finance activities  | 
| 22 |  | undertaken by the county or its included municipalities to  | 
| 23 |  | mitigate the effects of urban stormwater runoff by providing  | 
| 24 |  | and maintaining stormwater collection, retention, detention,  | 
| 25 |  | and particulate treatment facilities, and improving water  | 
| 26 |  | bodies impacted by stormwater runoff, as identified in the  | 
|     | 
| |  |  | 10000SB1337sam002 | - 33 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | county plan. In establishing, maintaining, or replacing such  | 
| 2 |  | facilities, the county shall not duplicate facilities operated  | 
| 3 |  | by other governmental bodies within its corporate boundaries.   | 
| 4 |  | The schedule of fees established by the county board shall  | 
| 5 |  | include a procedure for a full or partial fee waiver for  | 
| 6 |  | property owners who have taken actions or put in place  | 
| 7 |  | facilities that reduce or eliminate the cost to the county of  | 
| 8 |  | providing stormwater management services to their property.  | 
| 9 |  | The county board may also offer tax or fee rebates or incentive  | 
| 10 |  | payments to property owners who construct, maintain, and use  | 
| 11 |  | approved green infrastructure stormwater management devices or  | 
| 12 |  | any other methods that reduce or eliminate the cost to the  | 
| 13 |  | county of providing stormwater management services to the  | 
| 14 |  | property, including but not limited to facilities that reduce  | 
| 15 |  | the volume, temperature, velocity, and pollutant load of the  | 
| 16 |  | stormwater managed by the county, such as systems that  | 
| 17 |  | infiltrate, evapotranspirate, or harvest stormwater for reuse,  | 
| 18 |  | known as "green infrastructure". In exercising this authority,  | 
| 19 |  | the county shall provide notice to the municipalities within  | 
| 20 |  | its jurisdiction of any fees proposed under this Section and  | 
| 21 |  | seek the input of each municipality with respect to the  | 
| 22 |  | calculation of the fees. The county shall also give property  | 
| 23 |  | owners at least 2 years' notice of the fee, during which time  | 
| 24 |  | the county shall provide education on green infrastructure  | 
| 25 |  | practices and an opportunity to take action to reduce or  | 
| 26 |  | eliminate the fee. All these fees collected by the county shall  | 
|     | 
| |  |  | 10000SB1337sam002 | - 34 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | be held in a separate fund, and shall be expended only in the  | 
| 2 |  | watershed within which they were collected. The county may  | 
| 3 |  | enter into intergovernmental agreements with other government  | 
| 4 |  | bodies for the joint administration of stormwater management  | 
| 5 |  | and the collection of the fees authorized in this Section. | 
| 6 |  |     A fee schedule authorized by this subsection must have the  | 
| 7 |  | same limit as the authorized stormwater tax. In Peoria County  | 
| 8 |  | only, the fee schedule shall not be adopted unless (i) a  | 
| 9 |  | referendum has been passed approving a stormwater tax as  | 
| 10 |  | provided in subsection (i) of this Section; or (ii) the  | 
| 11 |  | question of the adoption of a  fee schedule with the same limit  | 
| 12 |  | as the authorized stormwater tax has been approved in a  | 
| 13 |  | referendum by a majority of those voting on the question.  | 
| 14 |  |     (i) In the alternative to a fee imposed under subsection  | 
| 15 |  | (h), the county board may cause an annual tax of not to exceed  | 
| 16 |  | 0.20% of the value, as equalized or assessed by the Department  | 
| 17 |  | of Revenue, of all taxable property in the county to be levied  | 
| 18 |  | upon all the taxable property in the county. The property tax  | 
| 19 |  | shall be in addition to all other taxes authorized by law to be  | 
| 20 |  | levied and collected in the county and shall be in addition to  | 
| 21 |  | the maximum tax rate authorized by law for general county  | 
| 22 |  | purposes. The 0.20% limitation provided in this Section may be  | 
| 23 |  | increased or decreased by referendum in accordance with the  | 
| 24 |  | provisions of Sections 18-120, 18-125, and 18-130 of the  | 
| 25 |  | Property Tax Code (35 ILCS 200/). | 
| 26 |  |     Any revenues generated as a result of ownership or  | 
|     | 
| |  |  | 10000SB1337sam002 | - 35 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | operation of facilities or land acquired with the tax funds  | 
| 2 |  | collected pursuant to this subsection shall be held in a  | 
| 3 |  | separate fund and be used either to abate such property tax or  | 
| 4 |  | for implementing this Section. | 
| 5 |  |     If at least part of the county has been declared by a  | 
| 6 |  | presidential proclamation after July 1, 1986 and before  | 
| 7 |  | December 31, 1987, to be a disaster area as a result of  | 
| 8 |  | flooding, the tax authorized by this subsection does not  | 
| 9 |  | require approval by referendum. However, in Peoria County, the  | 
| 10 |  | tax authorized by this subsection shall not be levied until the  | 
| 11 |  | question of its adoption, either for a specified period or  | 
| 12 |  | indefinitely, has been submitted to the electors thereof and  | 
| 13 |  | approved by a majority of those voting on the question. This  | 
| 14 |  | question may be submitted at any election held in the county  | 
| 15 |  | after the adoption of a resolution by the county board  | 
| 16 |  | providing for the submission of the question to the electors of  | 
| 17 |  | the county. The county board shall certify the resolution and  | 
| 18 |  | proposition to the proper election officials, who shall submit  | 
| 19 |  | the proposition at an election in accordance with the general  | 
| 20 |  | election law. If a majority of the votes cast on the question  | 
| 21 |  | is in favor of the levy of the tax, it may thereafter be levied  | 
| 22 |  | in the county for the specified period or indefinitely, as  | 
| 23 |  | provided in the proposition. The question shall be put in  | 
| 24 |  | substantially the following form: | 
| 25 |  |         Shall an annual tax be levied
for stormwater management  | 
| 26 |  | purposes            (for a period of not more than ..... years) at a  | 
|     | 
| |  |  | 10000SB1337sam002 | - 36 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | rate not exceeding
.....% of the equalized assessed
value  | 
| 2 |  | of the taxable property of              ..... County? | 
| 3 |  |     Votes shall be recorded as Yes or No. | 
| 4 |  |     The following question may be submitted at any election  | 
| 5 |  | held in the county after the adoption of a resolution by the  | 
| 6 |  | county board providing for the submission of the question to  | 
| 7 |  | the electors of the county to authorize adoption of a schedule  | 
| 8 |  | of fees applicable to all real property within the county: | 
| 9 |  |         Shall the county board be authorized to adopt a  | 
| 10 |  | schedule of fees, at a rate not exceeding that of the  | 
| 11 |  | stormwater management tax, applicable to all real property  | 
| 12 |  | for preparation, administration, and implementation of an  | 
| 13 |  | adopted stormwater management plan, construction and  | 
| 14 |  | maintenance of related facilities, and management of the  | 
| 15 |  | runoff from the property? | 
| 16 |  |     Votes shall be recorded as Yes or No. | 
| 17 |  |     If these questions have been approved by a majority of  | 
| 18 |  | those voting prior to the effective date of this amendatory Act  | 
| 19 |  | of the 98th General Assembly, this subsection does not apply.  | 
| 20 |  |     (j) For those counties that adopt a property tax in  | 
| 21 |  | accordance with the provisions in this Section, the stormwater  | 
| 22 |  | management committee shall offer property tax abatements or  | 
| 23 |  | incentive payments to property owners who construct, maintain,  | 
| 24 |  | and use approved stormwater management devices.  The stormwater  | 
| 25 |  | management committee is authorized to offer credits to the  | 
| 26 |  | property tax, if applicable, based on authorized practices  | 
|     | 
| |  |  | 10000SB1337sam002 | - 37 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | consistent with the stormwater management plan and approved by  | 
| 2 |  | the committee. Expenses of staff of a stormwater management  | 
| 3 |  | committee that are expended on regulatory project review may be  | 
| 4 |  | no more than 20% of the annual budget of the committee,  | 
| 5 |  | including funds raised under subsections (h) and (i). | 
| 6 |  |     (k) Upon the creation and implementation of a county  | 
| 7 |  | stormwater management
plan, the county may petition the circuit  | 
| 8 |  | court to dissolve any or all drainage
districts created  | 
| 9 |  | pursuant to the Illinois Drainage Code or predecessor Acts
 | 
| 10 |  | which are located entirely within the area of the county  | 
| 11 |  | covered by the plan. | 
| 12 |  |     However, any active drainage district implementing a plan  | 
| 13 |  | that is
consistent with and at least as stringent as the county  | 
| 14 |  | stormwater
management plan may petition the stormwater  | 
| 15 |  | management planning committee
for exception from dissolution.   | 
| 16 |  | Upon filing of the petition, the committee
shall set a date for  | 
| 17 |  | hearing not less than 2 weeks, nor more than 4 weeks,
from the  | 
| 18 |  | filing thereof, and the committee shall give at least one  | 
| 19 |  | week's
notice of the hearing in one or more newspapers of  | 
| 20 |  | general circulation
within the district, and in addition shall  | 
| 21 |  | cause a copy of the notice to be
personally served upon each of  | 
| 22 |  | the trustees of the district.  At the
hearing, the committee  | 
| 23 |  | shall hear the district's petition and allow the
district  | 
| 24 |  | trustees and any interested parties an opportunity to present  | 
| 25 |  | oral
and written evidence.  The committee shall render its  | 
| 26 |  | decision upon the
petition for exception from dissolution based  | 
|     | 
| |  |  | 10000SB1337sam002 | - 38 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | upon the best interests of
the residents of the district.  In  | 
| 2 |  | the event that the exception is not
allowed, the district may  | 
| 3 |  | file a petition within 30 days of the decision
with the circuit  | 
| 4 |  | court.  In that case, the notice and hearing requirements
for  | 
| 5 |  | the court shall be the same as herein provided for the  | 
| 6 |  | committee.
The court shall likewise render its decision of  | 
| 7 |  | whether to dissolve the
district based upon the best interests  | 
| 8 |  | of residents of the district. | 
| 9 |  |     The dissolution of any drainage district shall not affect  | 
| 10 |  | the obligation
of any bonds issued or contracts entered into by  | 
| 11 |  | the district nor
invalidate the levy, extension or collection  | 
| 12 |  | of any taxes or special
assessments upon the property in the  | 
| 13 |  | former drainage district.  All property
and obligations of the  | 
| 14 |  | former drainage district shall be assumed and
managed by the  | 
| 15 |  | county, and the debts of the former drainage district shall
be  | 
| 16 |  | discharged as soon as practicable. | 
| 17 |  |     If a drainage district lies only partly within a county  | 
| 18 |  | that adopts a
county stormwater management plan, the county may  | 
| 19 |  | petition the circuit
court to disconnect from the drainage  | 
| 20 |  | district that portion of the district
that lies within that  | 
| 21 |  | county.  The property of the drainage district within the
 | 
| 22 |  | disconnected area shall be assumed and managed by the county.   | 
| 23 |  | The county shall
also assume a portion of the drainage  | 
| 24 |  | district's debt at the time of
disconnection, based on the  | 
| 25 |  | portion of the value of the taxable property of the
drainage  | 
| 26 |  | district which is located within the area being disconnected. | 
|     | 
| |  |  | 10000SB1337sam002 | - 39 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  |     The operations of any drainage district that continues to  | 
| 2 |  | exist in a
county that has adopted a stormwater management plan  | 
| 3 |  | in accordance with
this Section shall be in accordance with the  | 
| 4 |  | adopted plan. | 
| 5 |  |     (l) Any county that has adopted a county stormwater  | 
| 6 |  | management plan under this Section may, after 10 days' written  | 
| 7 |  | notice receiving consent of the owner or occupant, enter upon  | 
| 8 |  | any lands or waters within the county for the purpose of  | 
| 9 |  | inspecting stormwater facilities or causing the removal of any  | 
| 10 |  | obstruction to an affected watercourse. If consent is denied or  | 
| 11 |  | cannot be reasonably obtained, the county ordinance shall  | 
| 12 |  | provide a process or procedure for an administrative warrant to  | 
| 13 |  | be obtained. The county shall be responsible for any damages  | 
| 14 |  | occasioned thereby. | 
| 15 |  |     (m) Except as otherwise provided in subsection (a) of this  | 
| 16 |  | Section, upon petition of the municipality, and based on a  | 
| 17 |  | finding of the stormwater management planning committee, the  | 
| 18 |  | county shall not enforce rules and regulations adopted by the  | 
| 19 |  | county in any municipality located wholly or partly within the  | 
| 20 |  | county that has a municipal stormwater management ordinance  | 
| 21 |  | that is consistent with and at least as stringent as the county  | 
| 22 |  | plan and ordinance, and is being enforced by the municipal  | 
| 23 |  | authorities.  On issues that the county ordinance is more  | 
| 24 |  | stringent as deemed by the committee, the county shall only  | 
| 25 |  | enforce rules and regulations adopted by the county on the more  | 
| 26 |  | stringent issues and accept municipal permits.  The county shall  | 
|     | 
| |  |  | 10000SB1337sam002 | - 40 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  | have no more than 60 days to review permits or the permits  | 
| 2 |  | shall be deemed approved. | 
| 3 |  |     (n) A county may issue general obligation bonds for  | 
| 4 |  | implementing any stormwater plan adopted under this Section in  | 
| 5 |  | the manner prescribed in Section 5-1012; except that the  | 
| 6 |  | referendum requirement of Section 5-1012 does not apply to  | 
| 7 |  | bonds issued pursuant to this Section on which the principal  | 
| 8 |  | and interest are to be paid entirely out of funds generated by  | 
| 9 |  | the taxes and fees authorized by this Section. | 
| 10 |  |     (o) A county that has adopted a fee schedule pursuant to  | 
| 11 |  | this Section may not thereafter issue any bond extensions  | 
| 12 |  | related to implementing a stormwater management plan.  | 
| 13 |  |     (p) The powers authorized by this Section may be  | 
| 14 |  | implemented by the county board for a portion of the county  | 
| 15 |  | subject to similar stormwater management needs. | 
| 16 |  |     (q) The powers and taxes authorized by this Section are in  | 
| 17 |  | addition to the powers and taxes authorized by Division 5-15;  | 
| 18 |  | in exercising its powers under this Section, a county shall not  | 
| 19 |  | be subject to the restrictions and requirements of that  | 
| 20 |  | Division. | 
| 21 |  |     (r) Stormwater management projects and actions related to  | 
| 22 |  | stormwater management in a county that has adopted a fee  | 
| 23 |  | schedule or tax pursuant to this Section prior to the effective  | 
| 24 |  | date of this amendatory Act of the 98th General Assembly are  | 
| 25 |  | not altered by this amendatory Act of the 98th General  | 
| 26 |  | Assembly.
 | 
|     | 
| |  |  | 10000SB1337sam002 | - 41 - | LRB100 07731 AWJ 25525 a | 
 | 
| 
 | 
| 1 |  |     (s) As used in this Section: | 
| 2 |  |     "Urban flooding" means the flooding of public and private  | 
| 3 |  | land in urban communities that results from stormwater or  | 
| 4 |  | snowmelt runoff overwhelming the existing drainage  | 
| 5 |  | infrastructure, unrelated to the overflow of any river or lake,  | 
| 6 |  | whether or not that land is located in or near a floodplain. | 
| 7 |  |     "Urbanized areas" means a statistical geographic entity  | 
| 8 |  | consisting of a densely settled core created from census tracts  | 
| 9 |  | or blocks and contiguous qualifying territory that together  | 
| 10 |  | have a minimum population of at least 50,000 persons and has  | 
| 11 |  | been delineated as an urbanized area by the United States  | 
| 12 |  | Census Bureau after the most recent decennial census.  | 
| 13 |  | (Source: P.A. 98-335, eff. 8-13-13; 98-756, eff. 7-16-14.)".
 |