TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.11 SIGNS AND MARKERS
Section 1816.11 Signs and
Markers
a) Specifications. Signs and markers required under this Part
shall:
1) Be posted and maintained by the person who conducts the
surface mining activities;
2) Be of a uniform design throughout the operation that can be
easily seen and read;
3) Be made of durable material; and
4) Conform to local ordinances and codes.
b) Duration of maintenance. Signs and markers shall be
maintained during the conduct of all activities to which they pertain.
c) Mine and permit identification signs.
1) Identification signs shall be displayed at each point of
access to the permit area from public roads.
2) Signs shall show the name, business address, and telephone
number of the person who conducts the surface mining activities and the
identification number of the current permit authorizing surface mining
activities.
3) Signs shall be retained and maintained until after the release
of all bonds for the permit area.
d) Perimeter markers. The perimeter of a permit area shall be
clearly marked before the beginning of surface mining activities.
e) Buffer zone markers. Buffer zones shall be marked along their
boundaries as required under Section 1816.57.
f) Topsoil markers. Where topsoil or other vegetation supporting
material is segregated and stockpiled as required under Section 1816.22, the stockpiled
material shall be clearly marked.
g) Where required by State law, the operator shall replace
section, township and other legal markers which serve to delineate political or
geographic boundaries.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.13 CASING AND SEALING OF DRILLED HOLES: GENERAL REQUIREMENTS
Section 1816.13 Casing and
Sealing of Drilled Holes: General Requirements
Each exploration hole, other
drill or borehole, well, or other exposed underground opening shall be cased,
sealed, or otherwise managed, as approved by the Illinois Department of Natural
Resources, Office of Mines and Minerals (Department), to prevent acid or other
toxic drainage from entering ground or surface waters, to minimize disturbance
to the prevailing hydrologic balance, and to ensure the safety of people,
livestock, fish and wildlife, and machinery in the permit and adjacent area.
If these openings are uncovered or exposed by surface mining activities within
the permit area they shall be permanently closed, unless approved for water
monitoring, or otherwise managed in a manner approved by the Department. Use
of a drilled hole or borehole or monitoring well as a water well must meet the
provisions of Section 1816.41. This Section does not apply to holes solely
drilled and used for blasting.
(Source: Amended at 20 Ill. Reg. 2027, effective January 19, 1996)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.14 CASING AND SEALING OF DRILLED HOLES: TEMPORARY
Section 1816.14 Casing and
Sealing of Drilled Holes: Temporary
Each exploration hole, other
drill or boreholes, wells, and other exposed underground openings which have
been identified in the approved permit application for use to return coal
processing waste or water to underground working, or to be used to monitor ground
water conditions, shall be temporarily sealed before use and protected during
use by barricades, or fences, or other protective devices approved by the
Department. These devices shall be periodically inspected and maintained in
good operating condition by the person who conducts the surface mining
activities.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.15 CASING AND SEALING OF DRILLED HOLES: PERMANENT
Section 1816.15 Casing and
Sealing of Drilled Holes: Permanent
When no longer needed for
monitoring or other use approved by the Department upon a finding of no adverse
environmental or health and safety effect, or unless approved for transfer as a
water well under Section 1816.41, each exploration hole, other drilled hole or
borehole, well, and other exposed underground opening shall be capped, sealed,
backfilled, or otherwise properly managed, as required by the Department, under
Section 1816.13 and consistent with 30 CFR 75.1711. Permanent closure measures
shall be designed to prevent access to the mine workings by people, livestock,
fish and wildlife, and machinery, and to keep acid or other toxic drainage from
entering ground or surface waters.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.21 TOPSOIL: GENERAL REQUIREMENTS (REPEALED)
Section 1816.21 Topsoil:
General Requirements (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.22 TOPSOIL AND SUBSOIL
Section 1816.22 Topsoil and
Subsoil
a) Removal.
1) All topsoil shall be removed as a separate layer from the area
to be disturbed, and segregated. Where topsoil is of insufficient quantity or
poor quality for sustaining vegetation, the materials approved by the
Department in accordance with subsection (b) shall be removed as a separate
layer from the area to be disturbed, and segregated.
2) If topsoil is less than 6 inches thick and no substitutes or
supplements are approved in accordance with subsection (b), the operator shall
remove a 6 inch layer that includes the A horizon and the unconsolidated
materials immediately below or the A horizon and all unconsolidated materials
if the total available is less than 6 inches and treat the mixture as topsoil.
3) The Department shall not require the removal of topsoil for
minor disturbances which:
A) Occur at the site of small structures, such as power poles,
signs, fence lines or markers; or
B) Will not destroy the existing vegetation, will not cause
erosion and will not degrade the quality or limit the future use of the soil.
4) All material to be removed under this Section shall be removed
after the vegetative cover that would interfere with its salvage is cleared
from the area to be disturbed, but before any drilling, blasting, mining or
other surface disturbance takes place.
b) Substitutes and supplements.
Selected
overburden materials may be substituted for, or used as a supplement to topsoil
if the operator demonstrates to the Department that the resulting soil medium
is equal to, or more suitable for sustaining vegetation than, the existing
topsoil, and the resulting soil medium is the best available in the permit area
to support revegetation. The demonstration shall be based upon the information
requirements of 62 Ill. Adm. Code 1780.18(b)(4).
c) Storage.
1) Materials removed under subsection (a) if not redistributed
immediately shall be segregated and stockpiled.
2) Stockpiled materials shall:
A) Be selectively placed on a stable site within the permit area;
B) Be protected from contaminants and unnecessary compaction that
would interfere with revegetation;
C) Be protected from wind and water erosion through prompt
establishment and maintenance of an effective, quick growing vegetative cover
or through other measures equally effective in controlling erosion approved by
the Department; and
D) Not be moved until required for redistribution unless approved
by the Department.
3) Where long-term surface disturbances will result from
facilities such as support facilities and preparation plants and where
stockpiling of materials removed under subsection (a)(1) would be detrimental
to the quality or quantity of those materials, the Department may approve the
temporary distribution of the soil materials so removed to an approved site
within the permit area to enhance the current use of that site until needed for
later reclamation provided that:
A) Such action will not permanently diminish the capability of the
topsoil of the host site; and
B) The material will be retained in a condition more suitable for
redistribution than if stockpiled.
d) Redistribution.
1) Topsoil materials and topsoil substitutes and supplements removed
under subsections (a) and (b) shall be redistributed in a manner that:
A) Achieves an approximate uniform, stable thickness when consistent
with the approved post-mining land use, contours and surface-water drainage
systems. Soil thickness may also be varied to the extent such variations help
meet the specific revegetation goals identified in the permit;
B) Prevents excess compaction of the materials; and
C) Protects the materials from wind and water erosion and
contamination before and after seeding and planting.
2) Before redistribution of the material removed under subsection
(a) the regraded land shall be treated if necessary to reduce potential
slippage of the redistributed material and to promote root penetration. If no
harm will be caused to the redistributed material and reestablished vegetation,
such treatment may be conducted after such material is replaced.
3) The Department shall not require the redistribution of topsoil
or topsoil substitutes on the approved post-mining embankments of permanent
impoundments or of roads if it determines that:
A) Placement of topsoil or topsoil substitutes on such embankments
is inconsistent with the requirement to use the best technology currently
available to prevent sedimentation; and
B) Such embankments will be otherwise stabilized.
4) Nutrients and soil amendments shall be applied to the
initially redistributed material when necessary to establish the required
vegetative cover.
e) Subsoil segregation. The Department may require that the B
horizon, C horizon, or other underlying strata, or portions thereof, be removed
and segregated, stockpiled, and redistributed as subsoil in accordance with the
requirements of subsections (c) and (d) if it finds that such subsoil layers
are necessary to comply with the revegetation requirements of Sections 1816.111,
1816.113, 1816.114, 1816.116 and 1816.117.
(Source: Amended at 47 Ill. Reg. 2348, effective February 3, 2023)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.23 TOPSOIL: STORAGE (REPEALED)
Section 1816.23 Topsoil:
Storage (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.24 TOPSOIL: REDISTRIBUTION (REPEALED)
Section 1816.24 Topsoil:
Redistribution (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.25 TOPSOIL: NUTRIENTS AND SOIL AMENDMENTS (REPEALED)
Section 1816.25 Topsoil:
Nutrients and Soil Amendments (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.41 HYDROLOGIC BALANCE PROTECTION
Section 1816.41 Hydrologic
Balance Protection
a) General. All surface mining and reclamation activities shall
be conducted to minimize disturbance of the hydrologic balance within the
permit and adjacent areas, to prevent material damage to the hydrologic balance
outside the permit area, such as diminution of recharge capacity, to prevent
violations of State and Federal water quality standards and effluent
limitations, to assure the protection or replacement of water rights, and to
support approved post-mining land uses in accordance with the terms and conditions
of the approved permit and the performance standards of this Part. The
Department shall require additional preventative, remedial, or monitoring
measures to assure that material damage to the hydrologic balance outside the
permit area is prevented if the current approved plan is not sufficient to
achieve this protection. Mining and reclamation practices that minimize water
pollution and changes in flow shall be used in preference to water treatment.
b) Ground water protection. In order to protect the hydrologic
balance, surface mining activities shall be conducted according to the plan
approved under 62 Ill. Adm. Code 1780.21(h) and the following:
1) Ground water quality shall be protected by handling earth
materials and runoff in a manner that minimizes acidic, toxic, or other harmful
infiltration to ground water systems and by managing excavations and other
disturbances to prevent or control the discharge of pollutants into the ground
water.
2) Ground water quantity shall be protected by handling earth
materials and runoff in a manner that will restore the approximate premining
recharge capacity of the reclaimed area as a whole, excluding coal mine waste
disposal areas and fills, so as to allow the movement of water to the ground
water system.
c) Ground water monitoring.
1) Ground water monitoring shall be conducted according to the
ground water monitoring plan approved under 62 Ill. Adm. Code 1780.21(i). If
unanticipated conditions develop, or if an approved operation or reclamation plan
is modified or revised such that the current monitoring program would not
detect possible adverse impacts to the hydrologic balance as a result of this
change, then the Department shall require additional monitoring including, but
not limited, to increased monitoring frequency, additional monitoring wells or
changes in the number of parameters being monitored, when it is determined that
the proposed, or approved, monitoring plan is not adequate to detect adverse
impacts to the hydrologic balance.
2) Ground water monitoring data shall be submitted every 3 months
to the Department or more frequently as prescribed by the Department. Ground
water monitoring reports shall be submitted by the first day of the second
month following the reporting period, unless the Department specifies an
alternative reporting schedule. Monitoring reports shall include analytical
results from each sample taken during the reporting period. When the analysis
of any ground water sample indicates noncompliance with the permit conditions,
then the operator shall promptly notify the Department and immediately take the
actions provided for in 62 Ill. Adm. Code 1773.17(e) and 1780.21(h).
3) Ground water monitoring shall proceed through mining and
continue during reclamation until bond release. Consistent with the procedures
of 62 Ill. Adm. Code 1774.13, the Department may modify the monitoring
requirements when such changes to the approved plan do not diminish the ability
to detect adverse impacts to the hydrologic balance, including the parameters
covered and the sampling frequencies, if the operator demonstrates, using the
monitoring data obtained under this subsection that:
A) The operation has minimized disturbance to the hydrologic
balance in the permit and adjacent areas and prevented material damage to the
hydrologic balance outside the permit area; water quality and quantity are
suitable to support approved post-mining land uses; and the water rights of
other users have been protected or replaced; or
B) Monitoring is no longer necessary to achieve the purposes set
forth in the monitoring plan approved under 62 Ill. Adm. Code 1780.21.
4) Equipment, structures, and other devices used in conjunction
with monitoring the quality and quantity of ground water onsite and offsite
shall be properly installed, maintained, and operated and shall be removed by
the operator when no longer needed, except as provided for under subsection
(g).
d) Surface water protection. In order to protect the hydrologic
balance, surface mining activities shall be conducted according to the plan
approved under 62 Ill. Adm. Code 1780.21(h) and the following:
1) Surface water quality shall be protected by handling earth
materials, ground water discharges, and runoff in a manner that minimizes the
formation of acidic or toxic drainage; prevents, to the extent possible using
the best technology currently available, additional contributions of suspended
solids to streamflow outside the permit area; and otherwise prevents water
pollution. If drainage control, restabilization and revegetation of disturbed
areas, diversion of runoff, mulching, or other reclamation and remedial
practices are not adequate to meet the requirements of this Section and Section
1816.42, the operator shall use and maintain the necessary water treatment
facilities or water quality controls.
2) Surface water quantity and flow rates shall be protected by
handling earth materials and runoff in accordance with the steps outlined in
the plan approved under 62 Ill. Adm. Code 1780.21(h).
e) Surface water monitoring.
1) Surface water monitoring shall be conducted according to the
surface water monitoring plan approved under 62 Ill. Adm. Code 1780.21(j). If
unanticipated conditions develop, or if an approved operation or reclamation
plan is modified or revised such that the current monitoring program would not
detect possible adverse impacts to the hydrologic balance as a result of this
change, then the Department shall require additional monitoring including, but
not limited to, changes in the number of parameters or frequency of sample
collection, when it is determined that the approved plan is not designed to
detect adverse impacts to the hydrologic balance.
2) Surface water monitoring data shall be submitted to the
Department every 3 months, or more frequently as prescribed by the Department
in those circumstances where a more frequent monitoring schedule is necessary
to detect adverse impacts to the surface water system. This shall include, but
not necessarily be limited to, copies of reports submitted for the National
Pollutant Discharge Elimination System (NPDES) sent to the Illinois
Environmental Protection Agency (EPA). Copies of NPDES reports shall be sent
to the Department by the first day of the second month following the reporting
period. Monitoring reports shall include analytical results from each sample
taken during the reporting period. When the analytical results of any surface
water sample indicates noncompliance with the permit conditions, the operator
shall notify the Department within 5 days and immediately take the actions
provided for in 62 Ill. Adm. Code 1773.17(e) and 1780.21(h). The reporting
requirements of this paragraph do not exempt the operator from meeting any
NPDES reporting requirements.
3) Surface water monitoring shall proceed through mining and
continue until bond release. Consistent with 62 Ill. Adm. Code 1774.13, the
Department may modify the monitoring requirements, except those required by the
Illinois EPA, when such changes to the approved plan do not diminish the
ability to detect adverse impacts to the hydrologic balance, including the
parameters covered and sampling frequency if the operator demonstrates using
the monitoring data that:
A) The operation has minimized disturbance to the hydrologic
balance in the permit and adjacent areas and prevented material damage to the
hydrologic balance outside the permit area; water quantity and quality are
suitable to support approved post-mining land uses; and the water rights of other
users have been protected or replaced; or
B) Monitoring is no longer necessary to achieve the purposes set
forth in the monitoring plan approved under 62 Ill. Adm. Code 1780.21(j).
4) Equipment, structures, and other devices used in conjunction with
monitoring the quality and quantity of surface water onsite and offsite shall
be properly installed, maintained, and operated and shall be removed by the
operator when no longer needed, except as provided for in Section 1816.49(b).
f) Acid- and toxic-forming materials.
1) Drainage from acid- and toxic-forming materials into surface
water and ground water shall be avoided by:
A) Identifying and burying and/or treating, when necessary,
materials which may adversely affect water quality, or be detrimental to
vegetation or to public health and safety if not buried and/or treated, and
B) Storing materials in a manner that will protect surface water
and ground water by preventing erosion, the formation of polluted runoff, and
the infiltration of polluted water. Storage shall be limited to the period
until burial and/or treatment first become feasible, and so long as storage
will not result in any risk of water pollution or other environmental damage.
2) Storage, burial or treatment practices shall be consistent
with other material handling and disposal provisions of Section 1816.102.
g) Before final release of bond, exploratory or monitoring wells
shall be sealed in a safe and environmentally sound manner in accordance with
Sections 1816.13 through 1816.15. With prior approval of the Department, wells
may be transferred to another party for further use. At a minimum, the
conditions of such transfer shall comply with State and local law and the
permittee shall remain responsible for the proper management of the well until
bond release in accordance with Sections 1816.13 through 1816.15.
h) Any person who conducts surface mining activities shall
replace the water supply of an owner of interest in real property who obtains
all or part of his or her supply of water for domestic, agricultural,
industrial, or other legitimate use from an underground or surface source,
where the water supply has been adversely impacted by contamination,
diminution, or interruption proximately resulting from the surface mining
activities. Information used to determine the extent of the impact of mining
upon ground water and surface water shall include, but not be limited to,
baseline hydrologic information required in 62 Ill. Adm. Code 1780.21 and
1780.22.
i) Discharges into an underground mine.
1) Discharges into an underground mine are prohibited, unless
specifically approved by the Department after a demonstration that the
discharge will:
A) Minimize disturbance to the hydrologic balance on the permit
area, prevent material damage outside the permit area and otherwise eliminate
public hazards resulting from surface mining activities;
B) Not result in a violation of water quality standards or
effluent limitations set forth in Section 1816.42;
C) Be at a known rate and quality which shall meet the effluent
limitations of Section 1816.42 for pH and total suspended solids, except that
the Department may allow pH and total suspended solids to exceed effluent
limits so long they will not result in any adverse impacts to the hydrologic
balance, and
D) Meet with the approval of the Mine Safety and Health
Administration.
2) Discharges shall be limited to the following:
A) Water;
B) Coal processing waste;
C) Fly ash from a coal-fired facility;
D) Sludge from an acid-mine drainage treatment facility;
E) Flue-gas desulfurization sludge;
F) Inert materials used for stabilizing underground mines; and
G) Underground mine development wastes.
(Source: Amended at 26 Ill. Reg. 4232, effective March 6, 2002)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.42 HYDROLOGIC BALANCE: WATER QUALITY STANDARDS AND EFFLUENT LIMITATIONS
Section 1816.42 Hydrologic
Balance: Water Quality Standards and Effluent Limitations
Discharges of water from areas
disturbed by surface mining activities shall be made in compliance with the
Federal Water Pollution Control Act of 1972, as amended (30 U.S.C. 1251 et
seq.), the Environmental Protection Act (Ill. Rev. Stat. 1991, ch. 111½, pars.
1001 et seq.) [415 ILCS 5/1] and with effluent limitations for coal mining
promulgated by the U.S. Environmental Protection Agency set forth in 40 CFR 434
(1992). 40 CFR 434 (1992) does not include any later amendments or editions.
(Source: Amended at 17 Ill. Reg. 11001, effective July 1, 1993)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.43 DIVERSIONS
Section 1816.43 Diversions
a) General Requirements.
1) With the approval of the Department, any flow from mined areas
abandoned before May 3, 1978, and any flow from undisturbed areas or reclaimed
areas, after meeting the criteria of Section 1816.46 for siltation structure
removal, may be diverted from disturbed areas by means of temporary or
permanent diversions. All diversions shall be designed to minimize adverse
impacts to the hydrologic balance within the permit and adjacent areas, to
prevent material damage outside the permit area and to assure the safety of the
public. Diversions shall not be used to divert water into underground mines
without approval of the Department under Section 1816.41(i).
2) The diversion and its appurtenant structures shall be
designed, located, constructed, maintained and used to:
A) Be stable;
B) Provide protection against flooding and resultant damage to
life and property;
C) Prevent, to the extent possible using the best technology
currently available, additional contributions of suspended solids to stream
flow outside the permit area. Appropriate sediment control measures for
diversions may include, but not be limited to, maintenance of appropriate
gradients, channel lining, revegetation, roughness structures, and detention
basins; and
D) Comply with the Rivers, Lakes, and Streams Act (Ill. Rev. Stat.
1991, ch. 19, pars. 52-79) [615 ILCS 5], Section 404 of the Federal Water
Pollution Control Act of 1972, as amended (30 U.S.C. 1344), and all local
ordinances.
3) Temporary diversions shall be removed promptly when no longer
needed to achieve the purpose for which they were authorized. The land
disturbed by the removal process shall be restored in accordance with this
Part. Before diversions are removed, downstream water-treatment facilities
previously protected by the diversion shall be modified or removed, as
necessary, to prevent overtopping or failure of the facilities. This
requirement shall not relieve the permittee from maintaining water treatment
facilities as otherwise required. When permanent diversions are constructed or
stream channels restored prior to the removal of temporary diversions the
permittee shall:
A) Establish, restore, enhance where practicable, or maintain
natural riparian vegetation on the banks of the stream, including any area that
is subject to annual inundation;
B) Establish, or restore the stream to its natural meandering
shape and to an environmentally acceptable gradient, as determined by the
Department; and
C) Establish or restore the stream to a longitudinal profile and
cross-section, including aquatic habitats (usually a pattern of riffles, pools,
and drops rather than uniform depth) that approxmate premining stream channel
characteristics.
4) Diversion design shall incorporate the following:
A) Channel lining shall be designed using standard engineering practices
to pass safely the design velocities. Riprap shall consist of non-degradable,
non-acid or toxic-forming rock such as sandstone, limestone, or other durable
rock that will not slake in water and will be free of coal, clay or shale;
B) Freeboard shall be no less than 0.3 feet, except as provided
for in subsection (a)(5). Protection shall be provided for transition of flows
and for critical areas such as swales and curves. Where the area protected is
a critical area, as determined by the Department, the design freeboard may be
increased;
C) Energy dissipators shall be installed, when necessary, at
discharge points where diversions intersect with natural streams and exit
velocity of the diversion ditch flow is greater than that of the receiving stream;
D) Excess excavated material not necessary for diversion channel
geometry or regrading of the channel shall be disposed of in accordance with
Sections 1816.71 through 1816.74; and
E) Topsoil shall be handled in compliance with Section 1816.22.
5) If the terrain is such that out-of-bank flows can accommodate
the design precipitation event without endangering health or the environment as
a result of flooding, such as physical harm or slope failure, the need for
diversion ditches may be modified by taking into account channels, banks, and
flood plains.
b) Diversions of perennial and intermittent streams.
1) Diversions of perennial and intermittent streams within the
permit area are subject to Department approval pursuant to Section 1816.57(a).
2) The design capacity of channels for temporary and permanent
stream channel diversions shall be at least equal to the capacity of the
unmodified stream channel immediately upstream and downstream from the
diversion.
3) The requirements of subsection (a)(2)(B) shall be met when the
temporary and permanent diversions for perennial and intermittent streams are
designed so that the combination of channel, bank, and floodplain configuration
is adequate to pass safely the peak runoff of a ten (10) year, six (6) hour
precipitation event for a temporary diversion and a one hundred (100) year, six
(6) hour precipitation event for a permanent diversion.
4) The longitudinal profile of the stream, the channel, and the
floodplain shall be designed and constructed to remain stable. Erosion control
structures such as channel lining structures, retention basins, and artificial
channel roughness structures shall be used in diversions only when approved by
the Department as being necessary to control erosion.
5) The design and construction of all stream channel diversions
of perennial and intermittent streams shall be sealed by a qualified registered
professional engineer as meeting the performance standards of this Part.
c) Diversion of miscellaneous flows.
1) Miscellaneous flows, which consist of all flows except for
perennial and intermittent streams, may be diverted away from disturbed areas
if required or approved by the Department to lessen environmental impact.
Miscellaneous flows shall include ground water discharges and ephemeral
streams.
2) The design, location, construction, maintenance, and removal
of diversions of miscellaneous flows shall meet all of the performance
standards set forth in subsection (a).
3) The requirements of subsection (a)(2)(B) shall be met when the
temporary and permanent diversions for miscellaneous flows are designed so that
the combination of channel, bank, and flood-plain configuration is adequate to
pass safely the peak runoff of a two (2) year, six (6) hour precipitation event
for a temporary diversion and a ten (10) year, six (6) hour precipitation event
for a permanent diversion.
(Source: Amended at 17 Ill. Reg. 11001, effective July 1, 1993)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.44 HYDROLOGIC BALANCE: STREAM CHANNEL DIVERSIONS (REPEALED)
Section 1816.44 Hydrologic
Balance: Stream Channel Diversions (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.45 HYDROLOGIC BALANCE: SEDIMENT CONTROL MEASURES
Section 1816.45 Hydrologic
Balance: Sediment Control Measures
a) Appropriate sediment control measures shall be designed,
constructed, and maintained using the best technology currently available to:
1) Prevent, to the extent possible, additional contributions of
sediment to streamflow or to runoff outside the permit area;
2) Meet the more stringent of applicable State or Federal
effluent limitations; and
3) Minimize erosion to the extent possible.
b) Sediment control measures include practices carried out within
and adjacent to the disturbed area. The sedimentation storage capacity of
practices in and downstream from the disturbed area shall reflect the degree to
which successful mining and reclamation techniques are applied to reduce
erosion and control sediment. Sediment control measures consist of the utilization
of proper mining and reclamation methods and sediment control practices, singly
or in combination. Sediment control methods include but are not limited to:
1) Disturbing the smallest practicable area at any one time
during the mining operation through progressive backfilling, grading, and
prompt revegetation as required in Section 1816.111(b);
2) Stabilizing the backfill material to promote a reduction in
the rate and volume of runoff, in accordance with the requirements of Section
1816.101;
3) Retaining sediment within disturbed areas;
4) Diverting runoff away from disturbed areas;
5) Diverting runoff using protected channels or pipes through
disturbed areas so as not to cause additional erosion;
6) Using straw dikes, riprap, check dams, mulches, vegetative
sediment filters, dugout ponds, and other measures that reduce overland flow
velocity, reduce runoff volume, or trap sediment; and
7) Treating with chemicals.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.46 HYDROLOGIC BALANCE: SILTATION STRUCTURES
Section 1816.46 Hydrologic
Balance: Siltation Structures
a) Definitions. For the purpose of this Section only:
1) Siltation structure means a sedimentation pond, a series of
sedimentation ponds, or other treatment facility.
2) Disturbed area shall not include those areas:
A) In which the only surface mining activities include diversion
ditches, siltation structures, or roads that are designed, constructed, and
maintained in accordance with this Part; and
B) For which the upstream area is not otherwise disturbed by the
permittee.
3) Other treatment facilities means any chemical treatments, such
as flocculation, or mechanical structures, such as clarifiers, that have a
point-source discharge and that are utilized to prevent additional
contributions of suspended solids to stream flow or runoff outside the permit
area, or to comply with all applicable State and federal water quality laws and
regulations.
b) General Requirements
1) Additional contributions of suspended solids sediment to
stream flow or runoff outside the permit area shall be prevented to the extent
possible using the best technology currently available.
2) All surface drainage from the disturbed area shall be passed
through a siltation structure before leaving the permit area, except as
provided in subsection (b)(5) or (e).
3) Siltation structures for an area shall be constructed before
beginning any surface mining activities in that area and, upon construction,
shall be sealed by a qualified registered professional engineer to be
constructed as designed and as approved in the reclamation plan.
4) Any siltation structure which impounds water shall be
designed, constructed, and maintained in accordance with Section 1816.49.
5) Siltation structures shall be maintained until removal is
authorized by the Department and the disturbed area has been stabilized and
revegetated. In no case shall the structure be removed sooner than two years
after the last augmented seeding.
6) When a siltation structure is removed, the land on which the
siltation structure was located shall be regraded and revegetated in accordance
with the reclamation plan and Sections 1816.111 through 1816.117.
Sedimentation ponds approved by the Department for retention as permanent
impoundments shall be exempted from this requirement.
7) The Department encourages the retention of sedimentation ponds
which will receive drainage from agricultural areas in the post-mining land use
plan.
c) Sedimentation ponds
1) When used, sedimentation ponds shall:
A) Be used individually or in series;
B) Be located as near as possible to the disturbed area and out of
perennial streams unless approved by the Department in accordance with Section
1816.57; and
C) Be designed, constructed, and maintained to:
i) Provide adequate sediment storage volume;
ii) Provide adequate detention time to allow the effluent from
the ponds to meet effluent limitations specified in Section 1816.42;
iii) Contain or treat the ten year, 24 hour precipitation event
("design event") unless a lesser design event is approved by the
Department based on terrain, climate, other site specific conditions, and on a
demonstration by the permittee that the effluent limitations of Section 1816.42
will be met;
iv) Provide a nonclogging dewatering device adequate to maintain
the detention time required under subsection (c)(1)(C)(ii);
v) Minimize, to the extent possible, short circuiting;
vi) Provide periodic sediment removal sufficient to maintain
adequate volume for the design event;
vii) Ensure against excessive settlement;
viii) Be free of sod, large roots, frozen soil, and acid- or
toxic-forming coal processing waste; and
ix) Be compacted properly.
2) Spillways. A sedimentation pond shall include either a
combination of principal and emergency spillways or a single spillway
configured as specified in Section 1816.49(a)(9) of this Part.
d) Other treatment facilities
1) Other treatment facilities shall be designed to treat the ten
year, 24 hour precipitation event unless a lesser design event is approved by
the Department based on terrain, climate, other site specific conditions, and a
demonstration by the permittee that the effluent limitations of Section 1816.42
will be met.
2) Other treatment facilities shall be designed in accordance
with the applicable requirements of subsection (c).
e) Exemptions. Exemptions to the requirements to pass all
drainage from disturbed areas through a siltation structure may be granted if
the disturbed drainage area within the total disturbed area is small; and
1) Alternate sediment control measures as described in Section
1816.45(b) are used in lieu of a siltation structure, and the permittee
demonstrates that siltation structures are not necessary for drainage from the
disturbed area to meet the effluent limitations and water quality standards for
the receiving waters set forth in Section 1816.42; or
2) The permittee demonstrates that siltation structures and
alternate sediment control measures are not necessary for drainage from the
disturbed area to meet the effluent limitations and water quality standards for
the receiving waters set forth in Section 1816.42.
(Source: Amended at 24 Ill. Reg. 5967, effective March 21, 2000)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.47 HYDROLOGIC BALANCE: DISCHARGE OF STRUCTURES
Section 1816.47 Hydrologic
Balance: Discharge of Structures
Discharge from sedimentation
ponds, permanent and temporary impoundments, coal processing waste dams and
embankments, and diversions shall be controlled, by energy dissipators, riprap
channels, and other devices where necessary to reduce erosion, to prevent
deepening or enlargement of stream channels, and to minimize disturbance of the
hydrologic balance. Discharge structures shall be designed according to
standard engineering-design procedures.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.48 HYDROLOGIC BALANCE: ACID-FORMING AND TOXIC-FORMING SPOIL (REPEALED)
Section 1816.48 Hydrologic
Balance: Acid-Forming and Toxic-Forming Spoil (Repealed)
(Source: Repealed 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.49 IMPOUNDMENTS
Section 1816.49 Impoundments
a) The requirements of this subsection apply to both temporary
and permanent impoundments.
1) Impoundments meeting the Class B or C criteria for dams in the
U.S. Department of Agriculture, Soil Conservation Service Technical Release No.
60 (210-VI-TR60, October 1985), "Earth Dams and Reservoirs," shall
comply with "Minimum Emergency Spillway Hydrologic Criteria" table in
TR-60 and the requirements of this Section.
2) Impoundments meeting the size and other qualifying criteria of
30 CFR 77.216(a) shall comply with the requirements of 30 CFR 77.216 (1998) and
this Section. 30 CFR 77.216 does not include any later editions or
amendments. The plan required to be submitted to the District Manager of the
Mine Safety and Health Administration (MSHA) under 30 CFR 77.216 shall also be
submitted to the Department as part of the permit application insofar as the
MSHA informational design standard requirements are duplicative of the
requirements of 62 Ill. Adm. Code 1780. In addition, the permittee shall
submit to the Department any certification issued by MSHA with respect to the
design plan.
3) The design of impoundments shall be sealed in accordance with
62 Ill. Adm. Code 1780.25(a) as designed to meet the requirements of this Part
using current, prudent engineering practices. The qualified registered
professional engineer shall be experienced in the design and construction of
impoundments.
4) Stability
A) An impoundment meeting the Class B or C criteria for dams in
TR-60, or the size or other criteria of 30 CFR 77.216(a), shall have a minimum
static safety factor of 1.5 for a normal pool with steady state seepage
saturation conditions, and a seismic safety factor of at least 1.2.
B) Impoundments not included in subsection (a)(4)(A), except for a
coal mine waste impounding structure, and located where failure would not be
expected to cause loss of life or serious property damage shall have a minimum
static safety factor of 1.3 for a normal pool with steady state seepage
saturation conditions, or meet the design, construction and maintenance
requirements of U.S. Natural Resources Conservation Service Practice Standard
IL 378, "Ponds," June 1992. Practice Standard 378 is hereby
incorporated by reference and does not include later editions or amendments.
5) Impoundments shall have adequate freeboard to resist
overtopping by waves and by sudden increases in storage volume. Impoundments
meeting the SCS Class B or C criteria for dams in TR-60 shall comply with the
freeboard hydrology criteria in the "Minimum Emergency Spillway Hydrologic
Criteria" table in TR-60.
6) Foundations
A) Foundations and abutments for an impounding structure shall be
stable during all phases of construction and operation and shall be designed
based on adequate and accurate information on the foundation conditions. For
an impoundment meeting the Class B or C criteria for dams in TR-60, or the size
or other criteria of 30 CFR 77.216(a), foundation investigation, as well as any
necessary laboratory testing of foundation material, shall be performed to
determine the design requirements for foundation stability.
B) All vegetative and organic materials shall be removed and
foundations excavated and prepared to resist failure. Cutoff trenches shall be
installed if necessary to ensure stability.
7) Slope protection shall be provided to protect against surface
erosion at the site and protect against sudden drawdown.
8) Faces of embankments and surrounding areas shall be vegetated,
except that faces where water is impounded may be riprapped or otherwise
stabilized in accordance with accepted design practices.
9) Impoundments shall include a combination of principal and
emergency spillways which shall be designed and constructed to safely pass the
design precipitation event specified in subsection (b) or (c).
10) Inspections. A qualified registered professional engineer or
other qualified professional specialist, under the direction of the
professional engineer, shall inspect the impoundment. The professional
engineer or specialist shall be experienced in the construction of
impoundments, as evidenced by the placement of a registered professional
engineer's seal on the inspection report.
A) Impoundments meeting the SCS Class B or C criteria for dams in
TR-60, or the size or other criteria of 30 CFR 77.216(a), shall be inspected,
examined and certified in accordance with 30 CFR 77.216. Annual status reports
required under 30 CFR 77.216-4 shall be submitted to the Department within 30
days after the reporting period.
B) All other impoundments shall be inspected at least quarterly
during construction, provided at least one inspection is conducted for
impoundments completed in less than one quarter, and upon completion of
construction. The qualified registered professional engineer shall submit to
the Department within 30 days after each inspection, a sealed report that the
impoundment has been constructed as designed and in accordance with the
approved plan and these regulations.
C) A copy of the reports required in subsections (a)(10)(A) and
(B), and the examination reports required in subsection (a)(11), shall be
retained at or near the mine site. The Department may approve reports being
retained at a different location if there is no permanent mine office.
11) Impoundments which do not meet the SCS Class B or C criteria
for dams in TR-60, or subject to 30 CFR 77.216, shall be examined at least
quarterly by a qualified person designated by the permittee for appearances of
instability, structural weakness or other hazardous conditions. At least one
of the quarterly examinations conducted during the calendar year shall be
sealed by a qualified registered professional engineer and shall include a
discussion of any appearances of instability, structural weakness or other
hazardous conditions, and any other aspects of the structure affecting
stability, and a statement indicating the pond has been maintained in
accordance with the approved plan and these regulations. This examination shall
be conducted during the period of October 1 through December 31 of each
calendar year. The sealed examination report shall be submitted to the
Department within 30 days after the examination. Impoundment examinations shall
be conducted until the impoundment has been removed or until final bond release
in accordance with 62 Ill. Adm. Code 1800.40. If the permittee can demonstrate
that failure of the structure would not create a potential threat to public
health and safety or threaten significant environmental harm, the following
impoundments shall be exempt from all examination requirements of this
subsection, following approval by the Department:
A) Impoundments that are completely incised;
B) Water impounding structures that impound water to a design
elevation no more than five feet above the upstream toe of the structure and
that can have a storage volume of not more than 20 acre-feet; provided the
exemption request is accompanied by a report sealed by a registered
professional engineer licensed in the State of Illinois, accurately describing
the hazard potential of the structure. Hazard potential must be such that failure
of the structure would not create a potential threat to public health and
safety or threaten significant environmental harm. The report shall be field
verified by the Department prior to approval and periodically thereafter. The
Department may terminate the exemption if so warranted by changes in the area
downstream of the structure or in the structure itself; and
C) Impoundments that do not facilitate mining or reclamation
including, but not limited to, sewage lagoons, landscaping ponds, pools or wetlands
in replaced stream channels, existing impoundments not yet used to facilitate
mining, ephemeral waterbodies, active mining pits and differential settlement
pools.
12) If any examination or inspection discloses that a potential
hazard exists, the person who examined the impoundment shall promptly inform
the Department of the finding and of the emergency procedures formulated for
public protection and remedial action. If adequate procedures cannot be
formulated or implemented, the Department shall be notified immediately. The
Department shall then notify the appropriate agencies that other emergency
procedures are required to protect the public.
b) Permanent impoundments. A permanent impoundment of water may
be created, if authorized by the Department in the approved permit, based upon
the following demonstration:
1) The size and configuration of the impoundment is adequate for
its intended purposes.
2) The quality of impounded water will be suitable on a permanent
basis for its intended use and, after reclamation, will meet water quality
standards set forth in Section 1816.42, and discharges from the impoundment
will meet applicable effluent limitations and will not degrade the quality of
receiving water below water quality standards set forth in Section 1816.42.
3) The water level will be sufficiently stable and be capable of
supporting the intended use.
4) Final grading will provide for adequate safety and access for
proposed water users.
5) The impoundment will not result in the diminution of the
quality and quantity of water utilized by adjacent or surrounding landowners
for agricultural, industrial, recreational, or domestic uses.
6) The impoundment will be suitable for the approved post-mining
land use.
7) The impoundment perimeter slopes shall be consistent with the
intended use of the impoundment, not be steeper than the angle of repose and
comply with subsection (a)(4). Where surface runoff enters the impoundment
area, the side slope shall be protected against erosion.
A) Runoff from above the slope shall be diverted to erosion free
outlets.
B) Grading of slopes shall be scheduled to be completed at the
onset of the most favorable seeding period.
8) Embankment ponds, those having embankment heights of three
feet or greater above natural ground elevation, shall have outslopes of 1v:2h
or less and interior slopes to the normal pool elevation of 1v:2h or less.
9) Permanent impoundments
A) Permanent impoundments not meeting the Class B or C criteria
for dams in TR-60, or the size or other qualifying criteria of 30 CFR
77.216(a), shall be provided with a spillway that will safely discharge a 25
year, six hour precipitation event, or such larger event as may be specified by
the Department based on factors such as terrain, topography and soil type.
B) Permanent impoundments meeting the size or other criteria of 30
CFR 77.216(a) shall be provided with a spillway that will safely discharge a
100 year, six hour precipitation event, or such larger event as may be
specified by the Department based on factors such as terrain, topography and soil
type.
C) Permanent impoundments meeting the Class B or C criteria for
dams in TR-60 shall be provided with a spillway that meets the criteria in the
"Minimum Emergency Spillway Hydrologic Criteria" table in TR-60, or
such larger event as may be specified by the Department based on factors such
as terrain, topography and soil type.
10) In lieu of the combination principal and emergency spillway
requirements of Section 1816.49(a)(9), an impoundment may have a single
spillway configured as set forth in subsections (b)(10)(A) and (b)(10)(B) that
is designed and constructed to safely pass the applicable design precipitation
specified in subsection (b)(9). The Department shall approve a single
open-channel spillway that is:
A) Of nonerodible construction and designed to carry sustained
flows; or
B) Earth or grass-lined and designed to carry short-term,
infrequent flows at non-erosive velocities where sustained flows are not
expected.
c) Temporary impoundments
1) Temporary impoundments not meeting the Class B or C criteria
for dams in TR-60, or the size or other qualifying criteria of 30 CFR
77.216(a), shall be provided with a spillway that will safely discharge a 25
year, six hour precipitation event or such larger event as may be required by
the Department based on factors such as terrain, topography and soil type.
Temporary impoundments meeting the size or other criteria of 30 CFR 77.216(a)
shall be provided with a spillway that will safely discharge a 100 year, six
hour precipitation event, or such larger event as may be specified by the
Department based on factors such as terrain, topography and soil type.
Temporary impoundments meeting the Class B or C criteria for dams in TR-60
shall be provided with a spillway that meets the criteria in the "Minimum
Emergency Spillway Hydrologic Criteria" table in TR-60 or such larger
event as may be specified by the Department based on factors such as terrain,
topography and soil type.
2) In lieu of the combination principal and emergency spillway
requirements of Section 1816.49(a)(9), an impoundment may have either:
A) A single spillway configured as set forth in subsection
(c)(2)(A)(i) or (c)(2)(A)(ii) that is designed and constructed to safely pass
the applicable design precipitation specified in subsection (c)(1). The
Department shall approve a single open-channel spillway that is:
i) Of nonerodible construction and designed to carry sustained
flows; or
ii) Earth or grass-lined and designed to carry short-term,
infrequent flows at non-erosive velocities where sustained flows are not
expected; or
B) Sufficient spillway capacity to safely pass, adequate storage
capacity to safely contain, or a combination of storage capacity and spillway
capacity to safely control the design precipitation event when it is
demonstrated by the permittee and certified by a qualified registered
professional engineer in accordance with 62 Ill. Adm. Code 1780.25(a) that the
impoundment will safely control the design precipitation event, the water from
which shall be safely removed in accordance with current prudent engineering
practices. Impounding structures relying on this method to control runoff
shall be located where failure would not be expected to cause loss of life or
serious property damage, except where:
i) In the case of an impoundment meeting the SCS Class B or C
criteria for dams in TR-60, or the size or other criteria of 30 CFR 77.216(a),
it is designed to control the precipitation of the probable maximum
precipitation of a 6-hour event, or greater event as specified by the
Department.
ii) In the case of an impoundment not included in subsection
(c)(2)(B)(i) , it is designed to control the precipitation of a 100-year 6-hour
event, or greater event as specified by the Department.
(Source: Amended at 24 Ill. Reg. 5967, effective March 21, 2000)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.50 HYDROLOGIC BALANCE: GROUND WATER PROTECTION (REPEALED)
Section 1816.50 Hydrologic
Balance: Ground Water Protection (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.51 HYDROLOGIC BALANCE: PROTECTION OF GROUND WATER RECHARGE CAPACITY (REPEALED)
Section 1816.51 Hydrologic
Balance: Protection of Ground Water Recharge Capacity (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.52 HYDROLOGIC BALANCE: SURFACE AND GROUND WATER MONITORING (REPEALED)
Section 1816.52 Hydrologic
Balance: Surface and Ground Water Monitoring (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.53 HYDROLOGIC BALANCE: TRANSFER OF WELLS (REPEALED)
Section 1816.53 Hydrologic
Balance: Transfer of Wells (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.54 HYDROLOGIC BALANCE: WATER RIGHTS AND REPLACEMENT (REPEALED)
Section 1816.54 Hydrologic
Balance: Water Rights and Replacement (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.55 HYDROLOGIC BALANCE: DISCHARGE OF WATER INTO AN UNDERGROUND MINE (REPEALED)
Section 1816.55 Hydrologic
Balance: Discharge of Water Into an Underground Mine (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.56 POST-MINING REHABILITATION OF SEDIMENTATION PONDS, DIVERSIONS, IMPOUNDMENTS, AND TREATMENT FACILITIES
Section 1816.56 Post-Mining
Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment
Facilities
Before abandoning a permit area
or seeking bond release, the operator shall ensure that all temporary
structures are removed and reclaimed, and that all permanent sedimentation
ponds, diversions, impoundments, and treatment facilities meet the requirements
of these regulations for permanent structures, have been maintained properly,
and meet the requirements of the approved reclamation plan for permanent
structures and impoundments. The operator shall renovate such structures if
necessary to meet the requirements of these regulations and to conform to the
approved reclamation plan.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.57 HYDROLOGIC BALANCE: STREAM BUFFER ZONES
Section 1816.57 Hydrologic
Balance: Stream Buffer Zones
a) No land within one hundred (100) feet of the top of the bank
of the normal channel of a perennial stream or an intermittent stream shall be
disturbed by surface mining activities, except in accordance with Section
1816.43, unless the Department specifically authorizes surface mining
activities close to or through such a stream upon finding:
1) That the original stream channel and its associated riparian
vegetation will be restored; and surface mining activities will not cause or
contribute to a violation of Section 1816.42 and will not adversely affect the
water quantity and quality or other environmental resources of the stream;
2) If there will be a temporary or permanent stream channel
diversion, it will comply with Section 1816.43.
b) The area not to be disturbed shall be designated a buffer zone
and marked as specified in Section 1816.11.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.59 COAL RECOVERY
Section 1816.59 Coal
Recovery
Surface mining activities shall
be conducted so as to maximize the utilization and conservation of the coal,
while utilizing the best appropriate technology currently available to maintain
environmental integrity, so that reaffecting the land in the future through
surface coal mining operations is minimized.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.61 USE OF EXPLOSIVES: GENERAL REQUIREMENTS
Section 1816.61 Use of
Explosives: General Requirements
a) Each person who conducts surface mining activities shall
comply with all applicable State and Federal laws in the use of explosives.
b) All blasting operations shall be conducted by persons
certified by the Department in accordance with 62 Ill. Adm. Code 1850.
c) Blast design.
1) An anticipated blast design shall be submitted if blasting
operations will be conducted within:
A) One thousand (1,000) feet of any building used as a dwelling,
public building, school, church, or community or institutional building outside
the permit area; or
B) Five hundred (500) feet of an active or abandoned underground
mine.
2) The blast design may be presented as part of the permit
application or at a time, before the blast, approved by the Department.
3) The blast design shall contain sketches of the drill patterns,
delay periods, and decking and shall indicate the type and amount of explosives
to be used, critical dimensions, and the location and general description of
structures to be protected, as well as a discussion of design factors to be
used, which protect the public and meet the applicable air blast, flyrock, and
ground vibration standards in Section 1816.67.
4) The blast design shall be prepared and signed by a certified
blaster.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.62 USE OF EXPLOSIVES: PRE-BLASTING SURVEY
Section 1816.62 Use of
Explosives: Pre-Blasting Survey
a) At least thirty (30) days before initiation of blasting in a
permit area, the operator shall notify, in writing, all residents or owners of
structures located within one-half (½) mile of the permit area how to request a
pre-blast or condition survey.
b) Upon written request to the Department and the person who
conducts the surface mining activities by a resident or owner of a dwelling or
structure that is located within one-half (½) mile of any portion of the
permitted area, or by the owner of a dwelling or structure at a distance
greater than one-half (½) mile from the permit area but within one (1) mile of
the blasting area and within an area determined by the Department to be
appropriate in a particular situation on the basis of complaints or other
information received by the Department, the person who conducts the surface
mining activities shall promptly conduct a pre-blasting survey or a condition
survey of the dwelling or structure. For any structure where, in accordance
with this Section, a survey has been requested by a previous resident or
previous owner and the survey has been conducted by the permittee and copies of
the survey report have been provided to the previous owner or resident and the
Department, the permittee shall only be required to provide a copy of the
previously completed survey report to any new or subsequent owner upon written
request by the new or subsequent owner. If a structure is renovated, modified,
or added to, subsequent to a pre-blast survey or a condition survey, then upon
request to the Department a survey of such additions, modifications and
renovations shall be performed in accordance with this Section.
c) The survey shall determine the condition of the dwelling or
structure and document any pre-blasting or existing damage and other physical
factors that could reasonably be affected by the blasting. Structures such as
pipelines, cisterns, wells and other water systems warrant special attention
such as the review of construction, drilling or completion specifications;
however, the assessment of these structures may be limited to surface
conditions.
d) Any surveys requested more than ten (10) calendar days prior
to the published scheduled beginning of blasting shall be completed by the
operator before the start of blasting. If the request is made after the start
of blasting the person who conducts the surface mining activity shall conduct a
condition survey of the dwelling or structure. A condition survey shall
contain information identical to a pre-blasting survey. The intent of this
Section is to provide for either a pre-blasting or condition survey only.
e) A written report of the survey shall be prepared and signed by
the person who conducted the survey. The report may include recommendations of
any special conditions or proposed adjustments to the blasting procedure which
should be incorporated into the blasting plan to prevent damage. Copies of the
report shall be provided to the person requesting the survey and to the
Department within thirty (30) days of the the date the survey was completed.
If the person requesting the survey disagrees with the results of the survey,
he or she may notify, in writing, both the permittee and the Department of the
specific areas of disagreement. Instructions as to whom and to where the
written comments on the results of the survey should be forwarded shall be
included with the survey report.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.64 USE OF EXPLOSIVES: PUBLIC NOTICE OF BLASTING SCHEDULE
Section 1816.64 Use of
Explosives: Public Notice of Blasting Schedule
a) All blasting shall be conducted from sunrise to sunset, and at
times announced in the blasting schedule. The Department shall limit the area
covered, timing and sequence of blasting, as listed in the schedule, if such
limitations are necessary and reasonable in order to protect public health,
safety or welfare.
b) Unscheduled blasting may be conducted only where public or
operator health and safety so require. When an operator conducts an
unscheduled blast, the operator, using audible warning signals, shall notify
residents within one-half mile of the blasting site and document the reason(s)
for the unscheduled blast in accordance Section 1816.68(a)(17). Unscheduled
blasting does not include nighttime blasting, which is prohibited at all times.
c) Blasting schedule publication
1) Each person who conducts surface mining activities shall
publish a blasting schedule at least ten days, but not more than 30 days,
before beginning a blasting program in which blasts that use more than five
pounds of explosive or blasting agent are detonated. The blasting schedule
shall be published in a newspaper of general circulation in the locality of the
blasting site.
2) Copies of the schedule shall be distributed by mail to local
governments and public utilities and mailed or delivered to each residence
within one-half mile of the proposed blasting area and to every other person
within or outside such area to whom the Department requires to be mailed, and
daily notices shall be provided to such persons prior to any blasting.
3) The person who conducts the surface mining activities shall
republish and redistribute the schedule by mail at least every 12 months and
revise and republish the schedule at least ten days but not more than 30 days
before blasting in areas not covered in the current schedule or if the actual
blasting times differ from the time periods listed in the current schedule for
more than 20% of the blasts fired.
d) The blasting schedule shall contain at a minimum:
1) Identification of the specific areas in which blasting will
take place;
2) Dates and time periods when explosives are to be detonated;
3) Methods to be used to control access to the blasting area;
4) Types of audible warnings and all-clear signals to be used
before and after blasting; and
5) Name, address, and telephone number of operator.
e) Public notice of changes in blasting schedules
Before blasting in areas or at times not in a previous
schedule, the person who conducts the surface mining activities shall prepare a
revised schedule according to the procedures in subsections (c) and (d).
(Source: Amended at 22 Ill. Reg. 20228, effective November 5, 1998)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.65 USE OF EXPLOSIVES: SURFACE BLASTING REQUIREMENTS (REPEALED)
Section 1816.65 Use of
Explosives: Surface Blasting Requirements (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.66 USE OF EXPLOSIVES: BLASTING SIGNS, WARNINGS, AND ACCESS CONTROL
Section 1816.66 Use of
Explosives: Blasting Signs, Warnings, and Access Control
a) Blasting signs shall meet the specifications of Section
1816.11. The operator shall:
1) Conspicuously display signs reading "Blasting Area"
along the edge of any blasting area that comes within 100 feet of any public
road right-of-way, and at the point where any other road provides access to the
blasting area; and
2) At all entrances to the permit area from public roads or
highways, place conspicuous signs which state "Warning! Explosives in
Use" and which clearly list and describe the meaning of the audible blast
warning and all-clear signals that are in use, and which explain the marking of
blasting areas and charged holes awaiting firing within the permit area.
b) Warning and all-clear signals of different character or
pattern that are audible within one-half mile of the blast shall be given.
Each person within the permit area and each person who resides or regularly
works within one-half mile of the permit area shall be notified of the meaning
of the signals in the blasting schedule. The requirement to supply daily
notice may be fulfilled by the audible warning signals.
c) Access to the blasting area shall be controlled to prevent the
presence of livestock or unauthorized personnel during blasting and until an
authorized representative of the person who conducts the surface mining
activities has reasonably determined:
1) That no unusual circumstances, such as imminent slides or
undetonated charges, exist; and
2) That access to and travel in or through the area can be safely
resumed.
d) Proximity to buildings and other facilities
1) Blasting shall not be conducted within 300 feet of any
building used as a dwelling unless waived by the owner or within 300 feet of a
school, church, hospital, or nursing facility.
2) Blasting shall not be conducted within 100 feet of facilities
including, but not limited to, disposal wells, petroleum or gas storage
facilities, municipal water storage facilities, fluid-transmission pipelines,
or water and sewage lines unless a waiver is obtained from the owner of the
facility and submitted to the Department prior to blasting within 100 feet.
(Source: Amended at 22 Ill. Reg. 20228, effective November 5, 1998)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.67 USE OF EXPLOSIVES: CONTROL OF ADVERSE EFFECTS
Section 1816.67 Use of
Explosives: Control of Adverse Effects
a) Blasting shall be conducted to prevent injury to persons,
damage to public or private property outside the permit area, adverse impacts
on any underground mine, and change in the course, channel or availability of
ground or surface water outside the permit area.
b) Air blast limits
1) Air blast shall be controlled so that it does not exceed the
values specified below at any dwelling, public building, school, church, or
commercial or institutional structure, unless such structure is owned by the
person who conducts the surface mining activities and is not leased to any
other person. If a building owned by the person conducting surface mining
activities is leased to another person, the lessee may sign a waiver relieving
the operator from meeting the air blast limitations of this subsection. The
waiver shall be submitted to the Department before beginning blasting.
|
Lower frequency limit of measuring system, Hz +3dB
|
Maximum
level
in dB
|
|
|
|
|
0.1 Hz or lower – flat response*
|
134 peak
|
|
2.0 Hz or lower – flat response
|
133 peak
|
|
6.0 Hz or lower – flat response
|
129 peak
|
|
* Only when approved by the Department
|
2) The measuring systems used shall have a flat frequency
response of at least 200 Hz at the upper end.
3) The person who conducts blasting may satisfy the provisions of
subsection (b) by meeting any of the three specifications in the chart in
subsection (b)(1).
4) If necessary to prevent damages specified in subsection (a),
the Department shall specify lower maximum allowable airblast levels than those
in subsection (b)(1) for use in the vicinity of a specific blasting operation.
c) Air blast monitoring
1) When the cube root scaled distance, as defined in subsection
(c)(2), to the nearest dwelling, public building, school, church, or commercial
or institutional structure has a value less than 350 and when the burden to
hole depth ratio is greater than 1.0, or the top stemming height is less than
70% of the burden dimension, the air blast produced by that blast shall be
measured, recorded, analyzed, and reported pursuant to subsection (g) of this
Section and Section 1816.68(b). This subsection shall not apply to horizontal
blast holes drilled from the floor of the pit.
2) Cube root scaled distance equals the distance, in feet, from
the blast to a specified location divided by the cube root of the maximum
weight of explosives, in pounds, to be detonated in any eight millisecond
period.
3) To ensure compliance with the limits contained in this
Section, the Department may require an air blast measurement of any or all
blasts, and may specify the location of such measurements.
d) Flyrock, including blasted material traveling in the air, or
along the ground, shall not be cast beyond the permit boundaries or beyond the
area of regulated access required under Section 1816.66(c), or more than
one-half the distance to the nearest dwelling or other occupied structure.
e) Ground vibration limits
1) In all blasting operations, except as otherwise authorized in
this Section, the maximum peak particle velocity shall not exceed one inch per
second at the location of any dwelling, public building, school, church, or
commercial or institutional building. At distances greater than 5,000 feet
from the blast to any structures described in this subsection, the maximum
allowable peak particle velocity shall not exceed 0.75 inch per second at the
locations of the structures described in this subsection. At distances less
than 300 feet from the blast to any structures described in this subsection,
the maximum allowable peak particle velocity shall not exceed 1.25 inch per
second at the locations of the structures described in this subsection. These
limits shall apply separately to each component of motion as defined in
subsection (g). The Department shall reduce peak particle velocity limits if
determined necessary to provide damage protection, if so recommended in any pre-blast
survey or condition survey report provided pursuant to Section 1816.62.
2) Blasting shall be conducted to prevent adverse impacts on any
underground mine and changes in the course, channel, or availability of ground
or surface water outside the permit area. Ground vibration limits, including
the maximum peak particle velocity limitation of subsection (e)(1), shall not
apply at the following locations:
A) At structures owned by the person conducting the mining
activity, and not leased to another party; and
B) At structures owned by the person conducting the mining
activity, and leased to another party, if a written waiver by the lessee is
submitted to the Department prior to blasting.
f) Ground vibration monitoring
1) When the scaled distance, as defined below, has a value less
than 65 at the nearest dwelling, public building, school, church, or commercial
or institutional structure, a seismograph recording shall be made at or near
the closest structure requiring protection.
2) Scaled Distance = The distance, in feet, from the blast to a
specified location divided by the square root of the maximum weight of
explosives, in pounds, to be detonated in any eight millisecond period.
3) To ensure compliance with the limits contained in this
Section, the Department may require a seismograph recording of any or all
blasts and may specify the location at which such recordings are made.
g) As used herein, seismograph recording or record or air blast
recording or record shall mean:
A visually inspectable cartesian representation of the time
history of the particle velocity levels or air blast levels versus time. Time
is represented on the "X" axis. The particle velocity is shown by
three traces representing mutually perpendicular components of motion. The
components are oriented vertically, transversely, and longitudinally to the
horizontal direction from the recording location to the location of the blast.
The air blast time history is represented by a single trace. The record or
recording includes either an analog representation of, or a written description
of the vertical scale for the particle velocity traces and the air blast
trace. The units for the particle velocity traces and scale are in inches per
second. The units for the air blast trace and scale are millibars, pounds per
square inch, or decibels. The recording also includes an analog or descriptive
time scale. The time units are in seconds.
(Source: Amended at 22 Ill. Reg. 20228, effective November 5, 1998)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.68 USE OF EXPLOSIVES: RECORDS OF BLASTING OPERATIONS
Section 1816.68 Use of
Explosives: Records of Blasting Operations
a) A record of each blast, including seismograph reports, shall
be retained by the operator for at least three (3) years and shall be available
for inspection by the Department and the public on request. The record is to
be completed by the end of the work day following the day in which the blast
occurred, including the seismograph meter reading, if available, and shall
contain the following data:
1) Name of the operator conducting the blast;
2) Location, date, and time of blast;
3) Name, signature, and certification number of the blaster
conducting the blast;
4) The name of the owner or resident of, and the direction and
distance, in feet, to the nearest dwelling, school, church, or commercial, or
institutional building either:
A) Not located in the permit area; or
B) Not owned by the person who conducts the surface mining
activities.
5) Type of material blasted;
6) Number of holes, burden, and spacing;
7) Diameter and depth of holes;
8) Types of explosives used;
9) Total weight of explosives used;
10) Weight of explosives used per hole;
11) Maximum weight of explosives detonated within any eight (8)
millisecond period;
12) Maximum number of holes or decks detonated within any eight (8)
millisecond period;
13) Initiation system;
14) Type and length of stemming;
15) Type of delay detonator and delay periods used;
16) Sketch of the delay pattern, including decking;
17) Reasons and conditions for each unscheduled blast;
18) Wind velocity and direction; and
19) Weather conditions, including those which may cause possible
adverse blasting effects.
b) Air blast and/or ground vibration recordings, or photographic
copies thereof, where required, shall be kept at the mine site office for a
period of three (3) years following the date of the blast, and shall be
available for inspection by the Department and the public on request. The
recordings shall include the following:
1) Maximum air blast and/or ground vibration levels recorded;
2) The exact location of the monitoring equipment, and its
distance from the blast, and the date and time of the recording;
3) Name of the person and firm making the recording;
4) Name of the person and firm analyzing the recording. The
recording shall be signed and dated by the person performing the analysis; and
5) The type of instrument, sensitivity, and calibration signal or
certification of annual calibration. When the recordings required at Sections
1816.67(c) and 1816.67(g) are produced via digitized systems, the sampling rate
of the digitizer, in samples per second, shall be stated.
(Source: Amended at 15 Ill. Reg. 17166, effective January 1, 1992)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.71 DISPOSAL OF EXCESS SPOIL: GENERAL REQUIREMENTS
Section 1816.71 Disposal of
Excess Spoil: General Requirements
a) Excess spoil shall be placed in designated disposal areas
within a permit area, in a controlled manner to:
1) Minimize the adverse effects of leachate and surface water
runoff from the fill on surface and ground waters;
2) Ensure mass stability and prevent mass movement during and
after construction; and
3) Ensure that the final fill is suitable for reclamation and
revegetation compatible with the natural surroundings and the approved
post-mining land use.
b) Design certification.
1) The fill and appurtenant structures shall be designed using
current, prudent engineering practices. A qualified registered professional
engineer experienced in the design of earth and rock fills shall seal the
design of the fill and appurtenant structures.
2) The fill shall be designed to attain a minimum long-term
static safety factor of 1.5. The foundation and abutments of the fill must be
stable under all conditions of construction.
c) All vegetative and organic materials shall be removed from the
disposal area prior to placement of the excess spoil. Topsoil shall be
removed, segregated, and stored or replaced in accordance with Section
1816.22. If approved by the Department, organic material may be used as mulch
or may be included in the topsoil to control erosion, promote growth of
vegetation, or increase the moisture retention of the soil.
d) Slope protection shall be provided to minimize surface erosion
at the site. All disturbed areas, including diversion channels that are not
riprapped, or otherwise protected from erosion, shall be vegetated upon
completion of construction.
e) The disposal areas shall be located on the most moderately
sloping and naturally stable areas available as approved by the Department.
Fill materials suitable for disposal shall be placed upon or above a natural
terrace, bench or berm if such placement provides additional stability and
prevents mass movement.
f) Excess spoil shall be transported and placed in a controlled
manner in horizontal lifts not exceeding four (4) feet in thickness,
concurrently compacted as necessary to ensure mass stability and prevent mass
movement during and after construction; graded so that surface and subsurface
drainage is compatible with the natural surroundings; and covered with topsoil
or substitute material in accordance with Section 1816.22. The Department may
approve a design which incorporates placement of excess spoil in horizontal
lifts other than four (4) feet in thickness when it is demonstrated by the
operator and sealed by a qualified registered professional engineer that the
design will ensure the stability of the fill and will meet all other
requirements of this Section.
g) The final configuration of the fill must be suitable for the
approved post-mining land use. In addition:
1) No permanent impoundments are allowed on the completed fill.
Small depressions shall be allowed by the Department if they are needed to
retain moisture, minimize erosion, create and enhance wildlife habitat, or
assist revegetation, and if they are not incompatible with the stability of the
fill, as set forth in Sections 1816.41(a), 1816.97(a) and 1816.111;
2) Box cut spoils shall blend with undisturbed land with a
maximum outslope steepness of twenty-five (25) percent (4h:lv);
3) Other direct cast spoil placed onto unmined land shall be
graded so as to reduce the slope to the maximum extent by grading toward and
over the mined area, and blending with the unmined land with an outslope that
does not exceed fifteen (15) percent; and
4) Drainage from the interior portion of the spoil shall not be
directed over the outside slope of the box cut spoil unless an erosion control
system is designated to accommodate the runoff from the interior area.
h) Terraces may be constructed on the outslope of the fill if
required for stability, control of erosion, to conserve soil moisture, or to
facilitate the approved post-mining land use, as set forth in Sections
1816.41(a) and 1816.111(a). The grade of the outslope between terrace benches
shall not be steeper than 2h:1v (fifty (50) percent). Terrace(s) are required
where the vertical height of the excess spoil exceeds forty (40) feet.
i) Where the slope in the disposal area exceeds lv:2.8h
(thirty-six (36) percent), or such lesser slope designated by the Department
based on local conditions, keyway cuts (excavations to stable bedrock) or rock
toe buttresses shall be constructed to stabilize the fill. Where the toe of
the spoil rests on a downslope, stability analyses shall be performed in
accordance with 62 Ill. Adm. Code 1780.35(c) to determine the size of rock toe
buttresses and keyway cuts.
j) A qualified registered professional engineer or other qualified
professional specialist under the direction of a registered professional
engineer, experienced in the construction of earth and rockfill embankments,
shall periodically inspect the fill during construction. Such inspections
shall be made at least quarterly throughout construction and during the
critical construction periods. Critical construction periods shall include at
a minimum:
1)
A) Foundation preparation, including the removal of all organic
material and topsoil;
B) Placement of underdrain and protective filter systems;
C) Installation of final surface drainage systems; and
D) The final graded and revegetated fill.
E) Regular inspections by the engineer or specialist shall also be
conducted during placement and compaction of fill materials.
2) The qualified registered professional engineer shall provide
to the Department a sealed report within two (2) weeks after each inspection
that the fill has been constructed and maintained as designed and in accordance
with the approved plan and 62 Ill. Adm. Code 1700 through 1850. The report
shall include appearances of instability, structural weakness and other
hazardous conditions.
3) The sealed report on the drainage system and protective
filters shall include color photographs of the structure taken during and after
construction, but before underdrains are covered with excess spoil. If the
underdrain system is constructed in phases, each phase shall be sealed
separately.
4) Where excess durable rock spoil is placed in single or
multiple lifts such that the underdrain system is constructed simultaneously
with excess spoil placement by the natural segregation of dumped materials, in
accordance with Section 1816.74, color photographs shall be taken of the
underdrain as the underdrain system is being formed.
5) The photographs accompanying each sealed report shall be taken
in adequate size and number with enough terrain or other physical features of
the site shown to provide a relative scale to the photographs and to
specifically and clearly identify the site.
6) A copy of each inspection report shall be retained at or near
the mine site.
k) Coal processing wastes shall not be disposed of in
head-of-hollow or valley fills, and may only be disposed of in other excess
spoil fills, if such waste is:
1) Placed in accordance with Section 1816.83;
2) Demonstrated to be nontoxic- and nonacid-forming; and
3) Demonstrated to be consistent with the design stability of the
fill.
l) Drainage control. If the disposal area contains springs,
natural or manmade watercourses, or wet-weather seeps, the fill design shall
include diversions and underdrains as necessary to control erosion, prevent
water infiltration into the fill, and ensure stability.
1) Diversions shall comply with the requirements of Section
1816.43.
2) Underdrains shall consist of durable rock or pipe, be designed
and constructed using current, prudent engineering practices. The underdrain
system shall be designed to carry the anticipated seepage of water due to
rainfall away from seeps and springs in the foundation of the disposal area and
shall be protected from piping and contamination by an adequate filter. Rock
underdrains shall be constructed of durable, nonacid-, nontoxic-forming rock
(e.g., natural sand and gravel, sandstone, limestone, or other durable rock)
that does not slake in water or degrade to soil material,and which is free of
coal, clay or other nondurable material. Perforated pipe underdrains shall be
corrosion resistant and shall have characteristics consistent with the
long-term life of the fill.
m) The foundation and abutments of the fill shall be stable under
all conditions of construction and operation. Sufficient foundation
investigation, as well as any necessary laboratory testing of foundation
materials, shall be performed in order to determine the design requirements for
stability of the foundation. Analyses of foundation conditions shall include
the effect of underground mine workings, if any, upon the stability of the fill
and appurtenant structures.
n) Excess spoil may be returned to underground mine workings, but
only in accordance with a disposal program approved by the Department and MSHA
under 62 Ill. Adm. Code 1784.25.
o) Excess spoil that is acid- or toxic-forming or combustible
shall be adequately covered with nonacid, nontoxic and noncombustible material,
or treated, to control the impact on surface and ground water in accordance
with Section 1816.41, to prevent sustained combustion, and to minimize adverse
effects on plant growth and the approved post-mining land use as set forth in
Section 1816.111(a).
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.72 DISPOSAL OF EXCESS SPOIL: VALLEY FILLS/HEAD-OF-HOLLOW FILLS
Section 1816.72 Disposal of
Excess Spoil: Valley Fills/Head-of-Hollow Fills
Valley fills and
head-of-hollow-fills shall meet all of the requirements of Section 1816.71 and
the additional requirements of this Section.
a) The fill shall be designed to attain a long-term static safety
factor of 1.5 based upon data obtained from subsurface exploration,
geotechnical testing, foundation design, and accepted engineering analyses.
b) Drainage control.
1) The top surface of the completed fill shall be graded such
that the final slope after settlement will be toward properly designed drainage
channels. Uncontrolled surface drainage may not be directed over the outslope
of the fill.
2) Runoff from areas above the fill and runoff from the surface
of the fill shall be diverted into stabilized diversion channels designed to
meet the requirements of Section 1816.43 and, in addition, to safely pass the
runoff from a one hundred (100) year, six (6) hour precipitation event.
c) Rock-core chimney drains. A rock-core chimney drain may be
used in a head-of-hollow-fill, instead of the underdrain and surface diversion
system normally required, as long as the fill is not located in an area
containing intermittent or perennial streams. A rock-core chimney drain may be
used in a valley fill if the fill does not exceed two hundred and fifty thousand
(250,000) cubic yards of material and upstream drainage is diverted around the
fill. The alternative rock-core chimney drain system shall be incorporated
into the design and construction of the fill as follows:
1) The fill shall have, along the vertical projection of the main
buried stream channel or rill, a vertical core of durable rock at least sixteen
(16) feet thick which shall extend from the toe of the fill to the head of the
fill, and from the base of the fill to the surface of the fill. A system of
lateral rock underdrains shall connect this rock core to each area of potential
drainage or seepage in the disposal area. The underdrain system and rock core
shall be designed to carry the anticipated seepage of water due to rainfall
away from the excess spoil fill and from seeps and springs in the foundation of
the disposal area. Rocks used in the rock core and underdrains shall meet the
requirements of Section 1816.71(l).
2) A filter system to ensure the proper long-term functioning of
the rock core shall be designed and constructed using current, prudent
engineering practices.
3) Grading may drain surface water away from the outslope of the
fill and toward the rock core. In no case, however, may intermittent or
perennial streams be diverted into the rock core. The maximum slope of the top
of the fill shall be 33h:1v (three (3) percent). A drainage pocket may be
maintained at the head of the fill during and after construction, to intercept
surface runoff and discharge the runoff through or over the rock drain, if
stability of the fill is not impaired. In no case shall this pocket or sump
have a potential capacity for impounding more than ten thousand (10,000) cubic
feet of water. Terraces on the fill shall be graded with a three (3) to five (5)
percent grade toward the fill and a one (1) percent slope toward the rock core.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.73 DISPOSAL OF EXCESS SPOIL: HEAD-OF-HOLLOW FILLS (REPEALED)
Section 1816.73 Disposal of
Excess Spoil: Head-of-Hollow Fills (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.74 DISPOSAL OF EXCESS SPOIL: DURABLE ROCK FILLS
Section 1816.74 Disposal of
Excess Spoil: Durable Rock Fills
The Department may approve the
alternative method of disposal of excess durable rock spoil by gravity
placement in single or multiple lifts, provided the following conditions are
met:
a) Except as provided in this Section, the requirements of
Section 1816.71 are met.
b) The excess spoil consists of at least eighty (80) percent, by
volume, durable, nonacid- and nontoxic-forming rock (e.g., sandstone or
limestone) that does not slake in water and will not degrade to soil material.
Where used, noncemented clay shale, clay spoil, soil or other nondurable excess
spoil material shall be mixed with excess durable rock spoil in a controlled
manner such that no more than twenty (20) percent of the fill volume, as
determined by tests performed by a registered professional engineer and
approved by the Department, is not durable rock.
c) A qualified registered professional engineer seals that the
design will ensure the stability of the fill and meet all other applicable
requirements of this Part.
d) The fill is designed to attain a minimum long-term static
safety factor of 1.5, and an earthquake safety factor of 1.1.
e) The underdrain system may be constructed simultaneously with
excess spoil placement by the natural segregation of dumped materials, provided
the resulting underdrain system is capable of carrying anticipated seepage of
water due to rainfall away from the excess spoil fill and from seeps and
springs in the foundation of the disposal area and the other requirements in
Section 1816.71 are met.
f) Surface water runoff from areas adjacent to and above the fill
is not allowed to flow onto the fill and is diverted into stabilized diversion
channels designed to meet the requirements of Section 1816.43 and to safely
pass the runoff from a one hundred (100) year, six (6) hour precipitation
event.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.75 DISPOSAL OF EXCESS SPOIL: PREEXISTING BENCHES
Section 1816.75 Disposal of
Excess Spoil: Preexisting Benches
a) The Department may approve the disposal of excess spoil
through placement on preexisting benches, provided that all the standards set
forth in Section 1816.71(a), (b)(1), (d) through (i) and the requirements of
this Section are met.
b) Excess spoil shall be placed only on the solid portion of the
preexisting bench.
c) The fill shall be designed, using current, prudent engineering
practices, to attain a long-term static safety factor of 1.3 for all portions
of the fill.
d) The preexisting bench shall be backfilled and graded to:
1) Achieve the most moderate slope possible which does not exceed
the angle of repose; and
2) Eliminate the highwall to the maximum extent technically
practical.
e) Disposal of excess spoil from an upper actively mined bench to
a lower preexisting bench by means of gravity transport may be approved by the
Department provided that:
1) The gravity transport courses are determined on a site-specific
basis by the operator as part of the permit application and approved by the
Department to minimize hazards to health and safety and to ensure that damage
will be minimized between the benches, outside the set course, and downslope of
the lower bench should excess spoil accidentally move;
2) All gravity transported excess spoil, including that excess
spoil immediately below the gravity transport courses and any preexisting spoil
that is disturbed, is rehandled and placed in horizontal lifts in a controlled
manner, concurrently compacted as necessary to ensure mass stability and to
prevent mass movement, and graded to allow surface and subsurface drainage to
be compatible with the natural surroundings and to ensure a minimum long-term
static safety factor of 1.3. Excess spoil on the bench prior to the current
mining operation that is not disturbed need not be rehandled except where
necessary to ensure stability of the fill as determined by factors such as
excessive sloughing and cracking;
3) A safety berm is constructed on the solid portion of the lower
bench prior to gravity transport of the excess spoil. Where there is
insufficient material on the lower bench to construct a safety berm, only that
amount of excess spoil necessary for the construction of the berm may be
gravity transported to the lower bench prior to construction of the berm.
4) Excess spoil shall not be allowed on the downslope below the
upper bench except on designated gravity transport courses properly prepared
according to Section 1816.22. Upon completion of the fill, no excess spoil
shall be allowed to remain on the designated gravity transport course between
the two benches and each transport course shall be reclaimed in accordance with
the requirements of this Part.
(Source: Added 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.79 PROTECTION OF UNDERGROUND MINING
Section 1816.79 Protection
of Underground Mining
No surface mining activities
shall be conducted closer than five hundred (500) feet to any point of either
an active or abandoned underground mine, except to the extent that:
a) The activities result in improved resource recovery, abatement
of water pollution, or elimination of hazards to the health and safety of the
public; and
b) The nature, timing and sequence of the activities that propose
to mine closer than five hundred (500) feet to an active underground mine are
jointly approved by the Department and the Mine Safety and Health
Administration (MSHA).
(Source: Amended at 20 Ill. Reg. 2027, effective January 19, 1996)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.81 COAL MINE WASTE: GENERAL REQUIREMENTS
Section 1816.81 Coal Mine
Waste: General Requirements
a) All coal mine waste shall be placed in new or existing
disposal areas approved by the Department for this purpose. These areas shall
be within a permit area. Coal mine waste shall be placed in a controlled
manner to:
1) Minimize adverse effects of leachate and surface water runoff
on surface and ground water quality and quantity in accordance with Section
1816.41;
2) Ensure mass stability and prevent mass movement during and
after construction by:
A) Spreading the coal mine waste in layers no more than
twenty-four (24) inches in thickness;
B) Compacting the coal mine waste to prevent spontaneous
combustion and to provide the strength required for stability of the coal
processing waste bank.
C) Variations shall be allowed in these requirements for the
disposal of dewatered fine coal mine waste (minus twenty-eight (28) sieve size)
with approval of the Department, if, because of site-specific conditions,
compliance with the requirements of subsections (c)(1) and (c)(2) is not
necessary to neet the performance standards of this Part;
3) Ensure that the final disposal facility is suitable for
reclamation and revegetation compatible with the natural surroundings and the
approved post-mining land use;
4) Not create a public safety hazard; and
5) Prevent combustion.
b) Coal mine waste materials from activities located outside a
permit area, such as those activities at other mines or abandoned mine waste
piles may be disposed of in the permit area only if approved by the
Department. Approval shall be based on a showing by the person who conducts
surface mining activities in the permit area that such disposal will be in
accordance with the standards of this Section.
c) Design certification.
1) The disposal facility shall be designed using current, prudent
engineering practices and shall meet any design criteria established by the
Department. A qualified registered professional engineer, experienced in the
design of similar earth and waste structures, shall seal the design of the
disposal facility.
2) The disposal facility shall be designed to attain a minimum
long-term static safety factor of 1.5. The foundation and abutments must be
stable under all conditions of construction.
d) Foundation. Sufficient foundation investigations, such as on
site investigations and test borings, as well as any necessary laboratory
testing of foundation material, shall be performed in order to determine the
design requirements for foundation stability. The analyses of the foundation
conditions shall take into consideration the effect of underground mine
workings, if any, upon the stability of the disposal facility.
e) Emergency procedures. If any examination or inspection
discloses that a potential hazard exists, the Department shall be informed
promptly of the finding and of the emergency procedures formulated for public
protection and remedial action. If procedures cannot be formulated or
implemented to ensure compliance with subsection (a), the Department shall be
notified immediately. The Department shall then notify the appropriate
agencies that other emergency procedures are required to protect the public.
f) Underground disposal. Coal mine waste may be disposed of in
underground mine workings, but only in accordance with a plan approved by the
Department and MSHA under 62 Ill. Adm. Code 1784.25.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.82 COAL PROCESSING WASTE BANKS: SITE INSPECTION (REPEALED)
Section 1816.82 Coal
Processing Waste Banks: Site Inspection (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.83 COAL MINE WASTE: REFUSE PILES
Section 1816.83 Coal Mine
Waste: Refuse Piles
Refuse piles shall meet the
requirements of Section 1816.81, the additional requirements of this Section,
and the requirements of 30 CFR 77.214 and 77.215 (1989). 30 CFR 77.214 and
77.215 (1989) do not include any subsequent amendments or editions.
a) Drainage control
1) If the disposal area contains springs, natural or man-made
water courses, or wet weather seeps, the design shall include diversions and
underdrains as necessary to control erosion, prevent water infiltration into
the disposal facility and ensure stability.
2) Uncontrolled surface drainage may not be diverted over the
outslope of the refuse piles. Runoff from the areas above the refuse pile and
runoff from the surface of the refuse pile shall be diverted into stabilized
diversion channels designed to meet the requirements of Section 1816.43 to
safely pass the runoff from a 100 year, six hour precipitation event. Runoff
diverted from undisturbed areas need not be commingled with runoff from the
surface of the refuse pile.
3) Underdrains shall comply with the requirements of Section
1816.71(1)(2).
b) Surface area stabilization. Slope protection shall be
provided to minimize erosion at the site. All disturbed areas, including
diversion channels that are not riprapped or otherwise protected from erosion,
shall be revegetated upon completion of construction.
c) Placement
1) All vegetative and organic materials shall be removed from the
disposal area prior to placement of coal mine waste. Topsoil shall be removed,
segregated and stored or redistributed in accordance with Section 1816.22. If
approved by the Department, organic material may be used as mulch, or may be
included in the topsoil to control erosion, promote growth of vegetation or
increase the moisture retention of the soil.
2) The final configuration of the refuse pile shall be suitable
for the approved post-mining land use. Terraces may be constructed on the
outslope of the refuse pile if required for stability, erosion control,
conservation of soil moisture, or facilitation of the approved post-mining land
use. The grade of the outslope between terrace benches shall not be steeper
than 2h:1v (50%).
3) No permanent impoundments shall be allowed on the completed
refuse pile. Small depressions may be allowed by the Department if they are
needed to retain moisture, minimize erosion, create and enhance wildlife
habitat, or assist revegetation, and if they are not incompatible with
stability of the refuse pile.
4) Following final grading of the refuse pile, the coal mine
waste shall be covered with a minimum of four feet of the best available,
nontoxic and noncombustible material, in a manner that does not impede drainage
from the underdrains. The Department may allow less than four feet of cover
material based on physical and chemical analyses which show that the
requirements of Section 1816.111 through 1816.117 will be met. The Department
shall require the addition of neutralization material to be added to the coal
mine waste if, based on physical and chemical analyses, this material is needed
to prevent acid mine drainage. This subsection (c)(4) is also applicable to the
reclamation of fine coal waste (slurry) not meeting the definition of refuse
piles.
d) Inspections. A qualified registered professional engineer, or
other qualified professional specialist under the direction of the professional
engineer, shall inspect the refuse pile during construction. The professional
engineer or specialist shall be experienced in the construction of similar
earth and waste structures.
1) Such inspections shall be made at least quarterly throughout
construction and during critical construction periods. Critical construction
periods shall include foundation preparation including the removal of all
organic material and topsoil; placement of underdrains and protective filter
systems; installation of final surface drainage systems; and the final graded
and revegetated facility. Regular inspections by the engineer or specialist
shall also be conducted during placement and compaction of coal mine waste
materials. More frequent inspections shall be conducted if a danger of harm
exists to the public health and safety or the environment. Inspections shall
continue until the refuse pile has been finally graded and revegetated.
2) The qualified registered professional engineer shall provide a
sealed report to the Department promptly after each inspection that the refuse
pile has been constructed and maintained as designed and in accordance with the
approved plan and 62 Ill. Adm. Code 1700 through 1850. The report shall
include appearances of instability, structural weakness, and other hazardous
conditions.
3) The sealed report on the drainage system and protective
filters shall include color photographs taken during and after construction,
but before underdrains are covered with coal mine waste. If the underdrain
system is constructed in phases, each phase shall be sealed separately. The
photographs accompanying each certified report shall be taken in adequate size
and number with enough terrain or other physical features of the site shown to
provide a relative scale to the photographs and to specifically and clearly
identify the site.
4) A copy of each inspection report shall be retained at or near
the minesite.
(Source: Amended at 22 Ill. Reg. 20228, effective November 5, 1998)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.84 COAL MINE WASTE: IMPOUNDING STRUCTURES
Section 1816.84 Coal Mine
Waste: Impounding Structures
New and existing impounding
structures constructed of coal mine waste or intended to impound coal mine
waste shall meet the requirements of Section 1816.81.
a) Coal mine waste shall not be used for construction of
impounding structures unless it has been demonstrated to the Department that
the stability of such a structure conforms to the requirements of this Part and
the use of coal mine waste will not have a detrimental effect on downstream
water quality or the environment due to acid seepage through the impounding
structure. The stability of the structure and the potential impact of acid
mine seepage through the impounding structure shall be discussed in detail in
the design plan submitted to the Department in accordance with 62 Ill. Adm.
Code 1780.25.
b) Construction Requirements
1) Each impounding structure constructed of coal mine waste or
intended to impound coal mine waste shall be designed, constructed and
maintained in accordance with Section 1816.49(a) and (c). Such structures may
not be retained permanently as part of the approved post-mining land use.
2) Each impounding structure constructed of coal mine waste or
intended to impound coal mine waste that meets the criteria of 30 CFR 77.216(a)
shall have sufficient spillway capacity to safely pass, adequate storage
capacity to safely contain, or a combination of storage capacity and spillway
capacity to safely control the probable maximum precipitation of a 6-hour
precipitation event or greater event as specified by the Department after consideration
of factors such as watershed size and characteristics necessary to ensure
design in accordance with prudent engineering practices.
c) Spillways and outlet works shall be designed to provide
adequate protection against erosion and corrosion in accordance with Section
1816.47. Inlets shall be protected against blockage.
d) Drainage control. Runoff from areas above the disposal
facility or runoff from the surface of the facility that causes instability or
erosion of the impounding structure shall be diverted into stabilized diversion
channels designed to meet the requirements of Section 1816.43 and designed to
safely pass the runoff from a one hundred (100) year, six (6) hour design
precipitation event.
e) Impounding structures constructed of or impounding coal mine
waste shall be designed so that at least ninety (90) percent of the water
stored during the design precipitation event can be removed within a ten (10)
day period.
f) For an impounding structure constructed of or impounding coal
mine waste, at least ninety (90) percent of the water stored during the design
precipitation event shall be removed within the 10-day period following the
design precipitation event.
(Source: Amended at 17 Ill. Reg. 11001, effective July 1, 1993)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.85 COAL PROCESSING WASTE BANKS: CONSTRUCTION REQUIREMENTS (REPEALED)
Section 1816.85 Coal
Processing Waste Banks: Construction Requirements (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.86 COAL PROCESSING WASTE: BURNING (REPEALED)
Section 1816.86 Coal
Processing Waste: Burning (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.87 COAL MINE WASTE: BURNED WASTE UTILIZATION
Section 1816.87 Coal Mine
Waste: Burned Waste Utilization
a) Coal mine waste fires shall be extinguished by the person who
conducts the surface mining activities, in accordance with the plan approved by
the Department and the MSHA. The plan shall contain, at a minimum, provisions
to ensure that only those persons authorized by the operator, and who have an
understanding of the procedures to be used, shall be involved in extinguishing
operations.
b) No burning or burned coal mine waste shall be removed from a
permitted disposal area without a removal plan approved by the Department.
Consideration shall be given to potential hazards to persons working or living
in the vicinity of the structure.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.88 COAL PROCESSING WASTE: RETURN TO UNDERGROUND WORKINGS (REPEALED)
Section 1816.88 Coal
Processing Waste: Return to Underground Workings (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.89 DISPOSAL OF NONCOAL MINE WASTES
Section 1816.89 Disposal of
Noncoal Mine Wastes
a) Noncoal mine wastes including, but not limited to, grease,
lubricants, paints, flammable liquids, garbage, abandoned mining machinery,
lumber, and other combustible material generated during surface mining
activities shall be placed and stored in a controlled manner in a designated
portion of the permit area. Placement and storage shall ensure that leachate
and surface runoff do not degrade surface or ground water, fires are prevented,
and that the area remains stable and suitable for reclamation and revegetation compatible
with the natural surroundings.
b) Final disposal of noncoal mine wastes shall be in a designated
disposal site in the permit area, or to a permitted solid waste disposal area.
Disposal sites in the permit area shall be designed and constructed to ensure
that leachate and drainage from the noncoal mine waste area does not degrade
surface or underground water. Wastes shall be routinely compacted and covered
to prevent combustion and windborne waste. When the disposal is completed a
minimum of two feet of soil cover shall be placed over the site, slopes
stabilized, and revegetation accomplished in accordance with Sections 1816.111
through 1816.117. Operation of the disposal site shall be conducted in
accordance with all local, State, and Federal requirements. Areas reclaimed to
cropland capability shall have a minimum of four feet of suitable soil cover.
c) At no time shall any noncoal mine waste be deposited in a
refuse pile or impounding structure, nor shall any excavation for a noncoal mine
waste disposal site be located within eight feet of any coal outcrop or coal
storage area.
d) Notwithstanding any other provision in 62 Ill. Adm. Code 1700
through 1850 any noncoal mine waste defined as "hazardous" under
Section 3001 of the Resource Conservation and Recovery Act (RCRA) (P. L.
94-580, as amended) and 40 CFR 261 shall be handled in accordance with the
requirements of Subtitle C of RCRA and in accordance with the Illinois
Environmental Protection Act as implemented by Title 35, Subtitle G, Part 721.
(Source: Amended at 24 Ill. Reg. 5967, effective March 21, 2000)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.91 COAL PROCESSING WASTE: DAMS AND EMBANKMENTS: GENERAL REQUIREMENTS (REPEALED)
Section 1816.91 Coal
Processing Waste: Dams and Embankments: General Requirements (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.92 COAL PROCESSING WASTE: DAMS AND EMBANKMENTS: SITE PREPARATION (REPEALED)
Section 1816.92 Coal
Processing Waste: Dams and Embankments: Site Preparation (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.93 COAL PROCESSING WASTE: DAMS AND EMBANKMENTS: DESIGN AND CONSTRUCTION (REPEALED)
Section 1816.93 Coal
Processing Waste: Dams and Embankments: Design and Construction (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.94 COAL PROCESSING WASTE: TIME AND REQUIREMENTS FOR COMPLETION OF COVERING (REPEALED)
Section 1816.94 Coal
Processing Waste: Time and Requirements for Completion of Covering (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.95 STABILIZATION OF SURFACE AREAS
Section 1816.95
Stabilization of Surface Areas
a) All exposed surface areas shall be protected and stabilized to
control erosion and air pollution attendant to erosion in accordance with
Section 1816.45(a).
b) Rills and gullies, deeper than nine (9) inches, which form in
areas that have been regraded and topsoiled and rills and gullies of lesser
size which the Department determines either disrupt the approved post-mining
land use or the reestablishment of the vegetative cover, or cause or contribute
to a violation of Section 1816.42 for receiving streams shall be filled,
regraded, or otherwise stabilized; topsoil shall be replaced; and the areas
shall be reseeded or replanted.
(Source: Added 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.97 PROTECTION OF FISH, WILDLIFE, AND RELATED ENVIRONMENTAL VALUES
Section 1816.97 Protection
of Fish, Wildlife, and Related Environmental Values
a) The operator shall, to the extent possible using the best
technology currently available, minimize disturbances and adverse impacts of
the activities on fish, wildlife, and related environmental values, and shall
achieve enhancement of such resources where practicable.
b) No surface mining activity shall be conducted which is likely
to jeopardize the continued existence of endangered or threatened species
listed by the Secretary of the United States Department of the Interior
(Secretary) or which is likely to result in the destruction or adverse
modification of designated critical habitats of such species in violation of
the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). The
operator shall immediately report to the Department any State- or
federally-listed endangered or threatened species within the permit area of
which the operator becomes aware. Upon notification, the Department shall
consult with appropriate State and Federal fish and wildlife agencies and,
after consultation, shall identify whether, and under what conditions, the
operator may proceed.
c) No surface mining activity shall be conducted in a manner
which would result in the unlawful taking of a bald or golden eagle, its nest,
or any of its eggs. The operator shall promptly report to the Department any
golden or bald eagle nest within the permit area of which the operator becomes
aware. Upon notification, the Department shall consult with the U.S. Fish and
Wildlife Service and also, where appropriate, the State fish and wildlife
agency and after consultation, shall identify whether, and under what
conditions, the operator may proceed in order to ensure that the operation is
not in violation of the Endangered Species Act of 1973, as amended, (16 U.S.C.
1531 et seq.).
d) Nothing in these regulations shall authorize the taking of an
endangered or threatened species or a bald or golden eagle, its nest, or any of
its eggs in violation of the Endangered Species Act of 1973, as amended, (16
U.S.C. 1531 et seq.), or the Bald Eagle Protection Act, as amended, (16 U.S.C.
668 et seq.).
e) Each operator shall, to the extent possible using the best
technology currently available:
1) Ensure that electric powerlines and other transmission
facilities used for, or incidental to, surface mining activities on the permit
area are designed and constructed to minimize electrocution hazards to raptors,
except where the Department determines that such requirements are unnecessary,
due to factors such as the absence of raptors;
2) Locate and operate haul and access roads so as to avoid or
minimize impacts on important fish and wildlife species or other species
protected by State or Federal law specified in 62 Ill. Adm. Code 1773.12;
3) Design fences, overland conveyers, and other potential
barriers to permit passage for large mammals, except where the Department
determines that such requirements are unnecessary, due to factors such as the
absence of large mammals; and
4) Fence, cover, or use of other appropriate methods to exclude
wildlife from ponds which contain hazardous concentrations of toxic-forming
materials.
f) The operator conducting surface mining activities shall avoid
disturbances to, enhance where practicable, restore, or replace, wetlands, and
riparian vegetation along rivers and streams and bordering ponds and lakes.
Surface mining activities shall avoid disturbances to, enhance where
practicable, or restore, habitats of unusually high value for fish and wildlife
such as wetlands and riparian vegetation.
g) Where fish and wildlife habitat is to be a post-mining land
use, the plant species to be used on reclaimed areas shall be selected on the
basis of the following criteria:
1) Their proven nutritional value for fish or wildlife.
2) Their use as cover for fish or wildlife.
3) Their ability to support and enhance fish or wildlife habitat
after the release of performance bonds. The selected plants shall be grouped
and distributed in a manner which optimizes edge effect, cover, and other
benefits to fish and wildlife.
h) Where cropland is to be the post-mining land use, where
appropriate for wildlife and crop management practices, the operator shall
intersperse the fields with trees, hedges, or fence rows throughout the
harvested area to break up large blocks of monoculture and to diversify habitat
types for birds and other animals.
i) Where residential, public service, or industrial uses are to
be the post-mining land use, and where consistent with the approved post-mining
land use, the operator shall intersperse reclaimed lands with greenbelts
utilizing species of grass, shrubs, and trees useful as food and cover for
wildlife.
(Source: Amended at 20 Ill. Reg. 2027, effective January 19, 1996)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.99 SLIDES AND OTHER DAMAGE
Section 1816.99 Slides and
Other Damage
a) An undisturbed natural barrier or constructed outcrop shall be
provided beginning at the elevation of the lowest coal seam to be mined and
extending from the outslope for such distance as may be determined by the
Department as is needed to assure stability. The barrier shall be retained in
place to prevent slides and erosion.
b) At any time a slide occurs which may have a potential adverse
effect on public property, health, safety, or the environment, the person who
conducts the surface mining activities shall notify the Department by the
fastest available means and comply with any remedial measures required by the
Department.
c) Operators that remove and do not replace the lateral support
within a three (3) month period shall not, unless mutually agreed upon by the
operator and the adjacent property owner, approach property lines, established
right-of-way lines of any public roads, streets or highways closer than a
distance, measured horizontally from the property line or right-of-way, equal
to ten (10) feet plus one and one-half (1½) times the depth of any excavation
except where consolidated materials or materials of sufficient hardness or
ability to resist weathering and to inhibit erosion or sloughing exists in the
excavation, the distance from the property line or any established right-of-way
line shall not, unless mutually agreed, be closer than a distance equal to ten
(10) feet plus one and one-half (1½) times the depth from the natural ground
surface to the top of the consolidated material or materials. When the
operator desires to remove the lateral support and replace it within a three
(3) month period, the operator shall submit to the Department a written request
for said purpose, outlining how the lateral support shall be replaced within
three (3) months. Said request shall be approved or denied by the Department
in accordance with 62 Ill. Adm. Code 1774.
(Source: Amended at 14 Ill. Reg. 11830, effective January 1, 1991)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.100 CONTEMPORANEOUS RECLAMATION
Section 1816.100
Contemporaneous Reclamation
Reclamation efforts, including,
but not limited to, backfilling, grading, topsoil replacement, and
revegetation, on all land that is disturbed by surface mining activities shall
occur as contemporaneously as practicable with mining operations, considering possible
environmental ramifications except when such mining operations are conducted in
accordance with a variance for concurrent surface and underground mining
activities issued under 62 Ill. Adm. Code 1785.18. The Department shall not
deny a reasonable extension under Sections 1816.101 through 1816.106 if a
permittee can demonstrate that an act of God, strikes, inability to receive
ordered equipment or extended periods of unseasonable and not to be expected
weather have made completion within time limits impossible. Such extensions
shall be made until a specific date determined by the Department.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.101 BACKFILLING AND GRADING: GENERAL REQUIREMENTS
Section 1816.101 Backfilling
and Grading: General Requirements
Timing of backfilling and
grading.
a) Contour mining. Rough backfilling and grading shall follow
coal removal by not more than sixty (60) days or one thousand, five hundred
(1,500) linear feet. The Department may grant additional time for rough
backfilling and grading if the permittee can demonstrate, through a detailed
written analysis under 62 Ill. Adm. Code 1780.18(b)(3), that additional time is
necessary.
b)
1) Area surface mining. Rough backfilling and grading shall be
completed within one hundred eighty (180) days following coal removal and shall
not be more than four (4) spoil ridges behind the pit being worked, the spoil
from the active pit being considered the first ridge. The Department may grant
additional time for rough backfilling and grading if the permittee can
demonstrate, through a detailed written analysis under 62 Ill. Adm. Code
1780.18(b)(3), that additional time is necessary.
2) Final grading (root medium placement, topsoil/substitute
material placement, erosion control system installation) shall be completed in
accordance with the approved reclamation plan prior to the expiration of
fifteen (15) months after June 30th of the fiscal year in which coal
removal occurred.
c) Other Disturbed Areas: All backfilling, rough grading, and
final grading of all other disturbed areas shall be completed in accordance
with the approved reclamation plan not later than twelve (12) months after
cessation of active use as determined by the Department.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.102 BACKFILLING AND GRADING: GENERAL GRADING REQUIREMENTS
Section 1816.102 Backfilling
and Grading: General Grading Requirements
a) Disturbed areas shall be backfilled and graded to:
1) Achieve the approximate original contour, except as provided
in subsection (k);
2) Eliminate all highwalls, spoil piles, and depressions, except
as provided in subsection (h) (small depressions) and in subsection (k)(3)(C)
(previously mined highwalls);
3) Achieve a post-mining slope that does not exceed either the
angle of repose or such lesser slope as is necessary to achieve a minimum
long-term static safety factor of 1.3 and to prevent slides;
4) Minimize erosion and water pollution both on and off the site
in accordance with Sections 1816.42 and 1816.95; and
5) Support the approved post-mining land use.
b) Spoil, except excess spoil disposed of in accordance with
Sections 1816.71 through 1816.74, shall be returned to the mined-out area.
c) Spoil and waste materials shall be compacted to ensure
stability or to prevent leaching of toxic materials.
d) Spoil may be placed on the area outside the mined-out area in
nonsteep slope areas to restore the approximate original contour by blending
the spoil into the surrounding terrain if the following requirements are met:
1) All vegetative and organic material shall be removed from the
area.
2) The topsoil on the area shall be removed, segregated, stored,
and redistributed in accordance with Section 1816.22.
3) The spoil shall be backfilled and graded on the area in
accordance with the requirements of this Section.
e) Disposal of coal processing waste and underground development
waste in the mined-out area shall be in accordance with Sections 1816.81 and
1816.83, except that a long-term static safety factor of 1.3 shall be achieved.
f) Exposed coal seams, acid- and toxic-forming materials, and
combustible materials exposed, used, or produced during mining shall be
adequately covered with nontoxic and noncombustible material, or treated, to
control the impact on surface and groundwater in accordance with Section 1816.41,
to prevent sustained combustion, and to be in compliance with the revegetation
requirements of Section 1816.111(a) and the approved post-mining land use.
g) Cut-and-fill terraces may be allowed by the Department where:
1) Needed to conserve soil moisture to ensure revegetation,
ensure stability, and control erosion on final-graded slopes, if the terraces
are compatible with the approved post-mining land use in accordance with
Sections 1816.41, 1816.95 and 1816.111; or
2) Specialized grading, foundation conditions, or roads are
required for the approved post-mining land use, in which case the final grading
may include a terrace to ensure the safety, stability, and erosion control
necessary to implement the post-mining land use plan.
h) Small depressions may be constructed if they are needed to
minimize erosion, create and enhance wildlife habitat, or assist revegetation
by retaining moisture, in accordance with Sections 1816.41, 1816.95, 1816.97
and 1816.111.
i) Permanent impoundments may be approved if they meet the
requirements of Sections 1816.49 and 1816.56 .
j) Preparation of final-graded surfaces shall be conducted in a
manner that minimizes erosion in accordance with Section 1816.45 and provides a
surface for replacement of topsoil that will minimize slippage such as discing
and scarification.
k) The post-mining slope may vary from the approximate original
contour when:
1) The standards for thin overburden in Section 1816.104 are met;
2) The standards for thick overburden in Section 1816.105 are
met; or
3) Approval is obtained from the Department for:
A) Mountaintop removal operations in accordance with 62 Ill. Adm.
Code 1785.14;
B) A variance from approximate original contour requirements in
accordance with 62 Ill. Adm. Code 1785.16; or
C) Incomplete elimination of highwalls in previously mined areas
in accordance with Section 1816.106.
(Source: Amended at 14 Ill. Reg. 11830, effective January 1, 1991)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.103 BACKFILLING AND GRADING: COVERING OR TREATING COAL AND ACID- AND TOXIC-FORMING MATERIALS (REPEALED)
Section 1816.103
Backfilling and Grading: Covering or Treating Coal and Acid- and Toxic-Forming
Materials (Repealed)
(Source: Repealed at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.104 BACKFILLING AND GRADING: THIN OVERBURDEN
Section 1816.104 Backfilling
and Grading: Thin Overburden
In surface coal mining which is
carried out at the same location over a substantial period of time where the
operation transects the coal deposit and where the thickness of the coal
deposit relative to the thickness of the overburden is large and where the
operator demonstrates that the spoil and other waste materials available from
the entire permit area are insufficient, giving due consideration to volumetric
expansion, to restore the disturbed area to its approximate original contour,
the operator shall, at a minimum:
a) Use all available spoil and waste materials to attain the
lowest practicable grade, but not more than the angle of repose; and
b) Meet the requirements of Sections 1816.102(a)(2) through
1816.102(j).
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.105 BACKFILLING AND GRADING: THICK OVERBURDEN
Section 1816.105 Backfilling
and Grading: Thick Overburden
In surface coal mining where the
thickness of the overburden is large relative to the thickness of the coal
deposit and where the operator demonstrates that the volume of the spoil and
other waste materials is more than sufficient to restore the disturbed area to
approximate original contour, the operator shall, at a minimum, after restoring
to approximate original contour:
a) Use the spoil and waste materials to attain the lowest
practicable grade, but not more than the angle of repose;
b) Meet the requirements of Sections 1816.102(a)(2) through
1816.102(j); and
c) Dispose of any excess spoil in accordance with Sections
1816.71 through 1816.74.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.106 BACKFILLING AND GRADING: PREVIOUSLY MINED AREAS
Section 1816.106 Backfilling
and Grading: Previously Mined Areas
Remining operations on
previously mined areas that contain a preexisting highwall shall comply with
the requirements of Sections 1816.102 through 1816.107 except as provided in
this Section. The requirements of Section 1816.102(a)(1) and (2) requiring the
elimination of highwalls shall not apply to remining operations where the volume
of all reasonably available spoil is demonstrated in writing to the Department
to be insufficient to completely backfill the reaffected or enlarged highwall.
The highwall shall be eliminated to the maximum extent technically practical in
accordance with the following criteria:
a) All spoil generated by the remining operation and any other
reasonably available spoil shall be used to backfill the area. Reasonably
available spoil from the previous mining operation in the immediate vicinity of
the remining operation shall be included within the permit area.
b) The backfill shall be graded to a slope which is compatible
with the approved post-mining land use and which provides drainage and
long-term stability in accordance with Sections 1816.41(a) and 1816.102(a)(3).
c) Any highwall remnant shall be stable, as determined by factors
such as excessive sloughage and cracking, and not pose a hazard to the public
health and safety or to the environment. The operator shall demonstrate that
the highwall remnant is stable.
d) Spoil placed on the outslope during previous mining operations
shall not be disturbed if such disturbances will cause instability of the
remaining spoil or otherwise increase the hazard to the public health and
safety or to the environment.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.107 BACKFILLING AND GRADING: STEEP SLOPES
Section 1816.107 Backfilling
and Grading: Steep slopes
a) Surface mining activities on steep slopes shall be conducted
so as to meet the requirements of Sections 1816.102 through 1816.106, and the
requirements of this Section except where mining is conducted on flat or gently
rolling terrain with an occasional steep slope through which the mining
proceeds and leaves a plain or predominantly flat area or where operations are
conducted in accordance with 62 Ill. Adm. Code 1824.
b) The following materials shall not be placed on the downslope.
1) Spoil.
2) Waste materials of any type.
3) Debris, including that from clearing and grubbing.
4) Abandoned or disabled equipment.
c) Land above the highwall shall not be disturbed unless the
Department finds that this disturbance will facilitate compliance with the environmental
protection standards of 62 Ill. Adm. Code 1810 through 1828 and the disturbance
is limited to that necessary to facilitate compliance.
d) Woody materials shall not be buried in the backfilled area
unless the Department determines that the proposed method for placing woody
material within the backfill will not deteriorate the stable condition of the
backfilled area.
(Source: Added at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.111 REVEGETATION: GENERAL REQUIREMENTS
Section 1816.111
Revegetation: General Requirements
a) The permittee shall establish on regraded areas and on all
other disturbed areas except areas where vegetative cover is inconsistent with
the approved post-mining land use, a vegetative cover that is in accordance
with the approved permit and reclamation plan that is:
1) Diverse, effective, and permanent;
2) Comprised of species native to the area, or of introduced
species where desirable and necessary to achieve the approved post-mining land
use and approved by the Department;
3) At least equal in extent of cover to the natural vegetation of
the area; and
4) Capable of stabilizing the soil surface from erosion.
b) The reestablished plant species shall:
1) Be compatible with the approved post-mining land use;
2) Have the same seasonal characteristics of growth as the
original vegetation;
3) Be capable of self-regeneration and plant succession;
4) Be compatible with the plant and animal species of the area;
and
5) Meet the requirements of the Illinois Noxious Weed Law [505
ILCS 100], the Illinois Seed Law [505 ILCS 110] and the Illinois Pesticide Act
[415 ILCS 60].
c) In order to prevent soil erosion, the Department shall grant
an exemption to the requirements of subsections (b)(2) and (b)(3) when the
reestablished species will achieve a quick-growing, temporary stabilizing
cover, and measures to establish permanent vegetation are included in the
approved permit and reclamation plan.
d) When the Department approved a cropland post-mining land use,
the permittee shall be exempt from the requirements of subsections (a)(1),
(a)(3), (b)(2), and (b)(3). The requirements of 62 Ill. Adm. Code 1823.15
apply to areas identified as prime farmland.
(Source: Amended at 24 Ill. Reg. 5967, effective March 21, 2000)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.112 REVEGETATION: USE OF INTRODUCED SPECIES (REPEALED)
Section 1816.112
Revegetation: Use of Introduced Species (Repealed)
(Source: Repealed at 10 Ill. Reg. 8985, effective July 1, 1986)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.113 REVEGETATION: TIMING
Section 1816.113
Revegetation: Timing
a) Disturbed areas shall be planted during the first normal
period for favorable planting conditions after replacement of the plant-growth
medium. The normal period for favorable planting is that planting time
generally accepted locally for the type of plant materials selected.
b) When the approved reclamation plan includes the planting of
trees and/or shrubs, the trees and/or shrubs shall be planted within 2 years
after replacement of the plant-growth medium.
(Source: Amended at 26 Ill. Reg. 4232, effective March 6, 2002)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.114 REVEGETATION: MULCHING AND OTHER SOIL STABILIZING PRACTICES
Section 1816.114
Revegetation: Mulching and Other Soil Stabilizing Practices
a) Mulch and other soil stabilizing practices shall be used on
all areas that have been regraded and covered by topsoil or topsoil
substitutes. The Department shall waive this requirement if seasonal, soil, or
slope factors result in a condition where mulch and other soil stabilizing
practices are not necessary to control erosion and to promptly establish an
effective vegetative cover.
b) Mulches shall be mechanically or chemically anchored to the
soil surface to assure effective protection of the soil and vegetation. The
Department shall waive the mulch anchoring requirement where seasonal, soil,
and/or slope factors result in a condition where anchoring is not necessary to
stabilize the mulch.
(Source: Amended at 10 Ill. Reg. 8985, effective July 1, 1986)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.115 REVEGETATION: GRAZING (REPEALED)
Section 1816.115
Revegetation: Grazing (Repealed)
(Source: Repealed at 10 Ill. Reg. 8985, effective July 1, 1986)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.116 REVEGETATION: STANDARDS FOR SUCCESS
Section 1816.116
Revegetation: Standards for Success
a) Success
of Revegetation
1) Success of revegetation shall be judged in accordance with
this Section, Section 1816.117, and as described in the Agricultural Lands
Productivity Formula (Illinois Department of Natural Resources, Office of Mines
and Minerals, Land Reclamation Division and Illinois Department of Agriculture,
Bureau of Land and Water Resources, October 19, 2021, this incorporation
includes no later amendments or additions). The Agricultural Lands
Productivity Formula is a program that compares reclaimed field crop yields
against projected county yields adjusted annually for weather variations. The
Agricultural Lands Productivity Formula is described in writing and made available
to the public.
2) Requirements
A) The period of extended responsibility for successful
revegetation shall begin after the last year of augmented seeding, fertilizing,
irrigation, or other work, excluding husbandry practices that are approved by the
Department in accordance with subsection (a)(2)(C).
B) The period of extended responsibility shall continue for a
period of not less than 5 full years, except that on lands eligible for
remining, the period of responsibility shall be 2 full years. Vegetation
parameters identified in subsection (a)(1) shall equal or exceed the approved
success standard set forth in subsection (a)(3).
C) The Department shall approve selective husbandry practices,
excluding irrigation or augmented seeding or augmented fertilization, without
extending the period of responsibility for revegetation success and bond
liability, if such practices can be expected to continue as part of the
post-mining land use or if discontinuance of the practices after the liability
period expires will not reduce the probability of permanent revegetation
success. Approved practices shall be normal conservation and land use
management practices within the region for unmined lands having land uses
similar to the approved post-mining land use of the disturbed area, including
such practices as disease, pest, and vermin control; any pruning, reseeding
and/or transplanting specifically necessitated by such actions; approved
agricultural practices described in the Illinois Agronomy Handbook, 24th
Edition (University of Illinois at Champaign-Urbana, University of Illinois
Extension, College of Agriculture, Consumer and Environmental Science, (2009;
this incorporation includes no later amendments or editions)); and those
practices that are a part of an approved conservation plan subject to the Farm
Security and Rural Investment Act of 2002 (P.L. 107-171; 116 Stat. 134). On
all lands with a postmining land use other than cropland, any areas reseeded or
replanted as a part or result of a normal husbandry practice must be
sufficiently small in size and limited in extent of occurrence, or part of a
hay management plan which is an agricultural practice described by the Illinois
Agronomy Handbook or as part of an approved conservation plan subject to the Farm
Security and Rural Investment Act of 2002, and the reestablished vegetation
must be in place for a sufficient length of time so as not to adversely affect
the Department's ability to make a valid determination at the time of bond
release as to whether the site has been properly reclaimed to a condition in
which it will support a diverse, effective, permanent vegetative cover of the
required nature and productivity. Copies of the Illinois Agronomy Handbook and
the Farm Security and Rural Investment Act of 2002 are available at the
Department's Springfield office.
D) Rill and gully repair on cropland-capable reclaimed land will
not be considered augmentation if a permittee has an approved erosion control
plan in place in the field pursuant to 62 Ill. Adm. Code 1823.14(g) or
1825.14(f), and shortly after the first rainfall event after the repair, the
Department makes the following determinations:
i) the area is a minor erosional feature;
ii) the area is small;
iii) the
erosion is not expected to recur; and
iv) the area is stable.
The Department
shall notify the permittee in writing whether or not a repair is augmentative
after making the determination. Such written notice shall be in the form of an
inspection report or other document issued by the Department.
E) Rill and gully repair on noncropland-capable land will not be
considered augmentation if, shortly after the first rainfall event after the
repair, the Department makes the following determinations:
i) the area is a minor erosional feature;
ii) the area is small;
iii) the
erosion is not expected to recur; and
iv) the
area is stable.
The Department
shall notify the permittee in writing whether or not a repair is augmentative
after making the determination. Such written notice shall be in the form of an
inspection report or other document issued by the Department.
F) Augmentation
Wetlands shall
be considered augmented when significant alterations are made to the size or character
of the watershed, pumping is used to maintain water levels, or neutralizing
agents, chemical treatments or fertilizers are applied to the wetland area,
except that wetlands managed as wildlife food plot areas using agricultural
techniques shall not be considered augmented when normal agricultural husbandry
practices, such as routine liming and fertilization, are used. The application
of neutralization agents and fertilizers used for minor remediation work or
repairs is considered a normal husbandry practice and not augmentative. Water
level management using permanent water control structures is considered a
normal husbandry practice.
G) Other Management Practices
The Department
shall approve the use of deep tillage for prime farmland and high capability
land as a beneficial practice that will not restart the 5 year period of
responsibility, if the following conditions are met:
i) The permittee has submitted a request to use the practice and
has identified the field that will be deep tilled;
ii) One or more hay crops, or other acceptable row crops, have been
grown or will be grown to dry out the subsoil prior to deep tilling the field;
and
iii) The Department has determined that the use of deep tillage
will be beneficial to the soil structure and long term crop production of the
field and the benefits will continue well beyond the responsibility period.
The Department
shall notify the permittee in writing of its decision. Such written notice
shall be in the form of an inspection report or other document issued by the
Department.
3) Ground cover and production shall be considered equal to the
approved success standard when they are not less than 90% of the success
standard. The sampling techniques for measuring success shall use a 90%
statistical confidence interval (i.e., one-sided t test with a 0.10 alpha
error). Vegetative ground cover shall be measured using the technique set
forth in 62 Ill. Adm. Code 1816.117(d). Standards for success shall be applied
in accordance with the approved post-mining land use and, at a minimum, the
following conditions:
A) The vegetative ground cover for areas previously disturbed by
mining operations that were not reclaimed to the requirements 62 Ill. Adm. Code
1810 through 1828 and that are remined or otherwise redisturbed by surface coal
mining operations, shall not be less than the greater of 70% or the percentage
of ground cover existing before redisturbance, and shall be adequate to control
erosion during the last year of the responsibility period;
B) For areas to be developed for industrial, commercial or
residential use less than 2 years after regrading is completed, the vegetative
ground cover shall not be less than that required to control erosion and shall
not be less than 70%;
C) For areas designated in the approved reclamation plan as
cropland, except those cropland areas subject to 62 Ill. Adm. Code 1823.15,
success of revegetation of cropland areas shall be determined in accordance
with subsection (a)(4) or (a)(6). Crop production shall be considered
successful if it is 90% of that crop production required in subsection (a)(4) or
(a)(6) with 90% statistical confidence (i.e., one-sided t test with a 0.10
alpha error) for a minimum of any 2 crop years of a 10 year period prior to
release of the performance bond, except the first year of the 5 year
responsibility period. During the extended 5 year responsibility period,
erosion from cropland must be minimized using equivalent or better management
practices than surrounding unmined cropland. The 5 year responsibility period
shall begin after the last year of augmented seeding, fertilizing, or soil
treatment and at the time of the planting of the crops to be grown for the
productivity showing or crops grown in rotation. Crop production for proof of
productivity purposes shall be initiated within 10 years after completion of
backfilling and final grading. All cropland shall be maintained using proper
management practices as set forth in subsection (a)(2)(C) until the end of the
responsibility period. Once chosen by the permittee, the productivity
alternative in subsection (a)(6) may not be modified without approval from the
Department;
D) For areas to be developed for fish and wildlife habitat
(including shelter belts), recreation, or forest products land uses, success of
revegetation shall be determined on the basis of tree and shrub populations and
ground cover. The tree and shrub population and ground cover shall meet the
standards described in Section 1816.117;
E) For areas designated as pasture and/or hayland or grazing land
in the approved reclamation plan, except for erosion control devices and other
structures (i.e., levees, ditches, waterways, impounding structures, etc.)
productivity success (tons of grasses and/or legumes per acre) shall be
determined in accordance with subsection (a)(4) or (a)(6). Productivity shall
be considered successful if it is 90% of the productivity required in
subsection (a)(4) or (a)(6) with 90% statistical confidence (i.e., one-sided t
test with a 0.10 alpha error) for a minimum of any 2 crop years of a 10 year
period prior to release of the performance bond, except the first year of the 5
year extended responsibility period. All pasture, hayland and grazing land
shall be maintained using proper management practices as set forth in
subsection (a)(2)(C) until the end of the responsibility period. Production
for proof of productivity purposes shall be initiated within 10 years after
completion of backfilling and final grading. Ground cover shall be considered
successful if it is 90% with 90% statistical confidence (i.e., one sided t test
with a 0.10 alpha error) for a minimum of any 2 years of a 10 year period prior
to the release of the performance bond, except the first year of the 5 year
extended responsibility period. On high capability land, the Department shall
allow the permittee to substitute corn production for hay production. If
determined to be a proper management practice in accordance with subsection
(a)(2)(C), the Department shall allow the permittee to substitute one year of
crop production of an allowable crop specified in subsection (a)(4)(D) for one
year of hay production on limited capability land. Once chosen by the
permittee, the productivity alternative in subsection (a)(6) may not be
modified without approval from the Department;
F) Non-contiguous areas less than or equal to 4 acres which were
disturbed from activities such as, but not limited to, signs, boreholes, power
poles, stockpiles and substations shall be considered successfully revegetated
if the permittee can demonstrate that the soil disturbance was minor, i.e., the
majority of the subsoil remains in place, the soil has been returned to its
original capability and the area is supporting its approved post-mining land
use at the end of the responsibility period.
4) In order to use the Agricultural Lands Productivity Formula, or
the alternative in subsection (a)(6), to determine success of revegetation, the
following shall apply:
A) The permittee shall submit annually, by February 15, a one inch
equals 500 (1:500) feet or larger scale drawing or aerial photograph
delineating:
i) Field boundaries, a field numbering scheme and the total
acreage for each field which will be cropped to demonstrate proof of
productivity for the coming crop year. The Department shall approve such
submittal if the information is correct and accurate. Once field boundaries
are established in a submittal, the boundaries shall not be changed without
recommencing the responsibility period, unless the submittal is amended in
accordance with subsection (a)(4)(A)(ii); and
ii) The crop (e.g., hay, wheat, corn, soybeans, etc.) which will
be grown on each field to demonstrate proof of productivity for the coming crop
year. The permittee may amend its scale drawing in accordance with 62 Ill.
Adm. Code 1774.13(b)(2) until July 15 of the submittal year. Each such
amendment shall contain a written explanation of changes from the original
submittal and include a map reflecting the changes. A field is an area of land
reclaimed by a single reclamation technique that comprises either high
capability land or prime farmland or limited capability land. The size of the
field and its boundaries are determined by such factors which include, but are
not limited to, contour, non-cropped boundaries and size of farming equipment.
B) Fields identified in subsection (a)(4)(A) to be measured for
success of revegetation for cropland shall be planted annually to a single
approved crop. The current sampling method of the Agricultural Lands
Productivity Formula shall apply. Soil and water conservation practices
approved in the permit application including but not limited to grass
waterways, diversion ditches, contour grass strips, and sedimentation ponds
within the boundaries of a field shall be excluded from the sampling
requirements of the Agricultural Lands Productivity Formula and shall remain
vegetated with permanent ground cover species, where appropriate, to conserve
soil and water resources. Subject to rulemaking, the Department in cooperation
with the Illinois Department of Agriculture may determine if a portion of a
field is a representative sample of the entire field when technology has
developed to make it possible through physical and chemical agronomic testing
to demonstrate success of vegetation through soil surveys or when statistically
valid sampling procedures are developed for determining success of revegetation
based upon cropping and sampling a representative portion of the field.
C) Adjustments for abnormal growing conditions shall be accepted
by the Department if the adjustments are certified by a qualified professional
(American Society of Agronomy certified) or National Association of State
Departments of Agriculture crop enumerators used under this Section, whose
ability to perform such adjustments has been previously approved by the
Department.
D) The crops to be grown shall include those commonly grown on
surrounding unmined cropland such as corn, soybeans, hay or wheat. The
Department may approve a hay crop use where this is a common use of unmined
cropland in the surrounding area. Prime farmland and other cropland areas must
include a minimum of one successful year of corn and if the Department has
approved its use, a maximum of one successful year each of hay and wheat crops,
may be used for the productivity demonstration. If deep tillage has been
completed to a minimum depth of 36 inches prior to bond release, the applicant
may use more than one successful year of hay or wheat as a crop to be used for
the productivity demonstration. The requirement for one successful year of
corn remains unchanged under this subsection (a)(4)(D).
5) Wetland revegetation shall be deemed successful when:
A) The applicable wetland vegetation criteria included in the
following reference materials have been met: Corps of Engineers Wetlands
Delineation Manual (Department of the Army Technical Report Y-87-1, January
1987, published by the Department of the Army, Waterways Experiment Station,
Corps of Engineers, P.O. Box 631, Vicksburg, Mississippi 39180-0631) , Regional
Supplement to the Corp of Engineers Wetlands Delineation Manual: Midwest Region
(Department of the Army ERDC/EL TR-10-16, August 2010, published by the
Department of the Army, U.S. Army Engineer Research and Development Center,
3909 Ferry Halls Road, Vicksburg, MS 39180-6199), and the National Wetland
Plant List for the State of Illinois (U.S. Army Corps of Engineers 2018,
National Wetland Plant List, version 3.4 http://wetland-plants.usace.army.mil).
The reference materials are available for inspection and copying at the Department's
Springfield office; and
B) Areas designed to support vegetation in the approved plan shall
have a minimum areal coverage of 30%. The testing procedure in Section
1816.117(d)(1) through (3) shall be used to evaluate the extent of cover.
Areal cover shall be determined to be present if any approved wetland species
is measured at the increment. The percentage of areal cover shall be
established for the area tested by taking the total number of measurements
where areal cover was determined to be present.
6) In
order to use the alternative to the Agricultural Lands Productivity Formula to
determine success of revegetation, the following shall apply: use of this
alternative is contingent upon the permittee demonstrating for the entire field
that the soil strength of the entire soil profile will average ≤ 200 psi
or has been deep tilled to a minimum depth of 36 inches prior to bond release,
and soil fertility will average Optimum Management for pH, P and K values as
defined under the current Illinois Agronomy Handbook, and intensive land
leveling is implemented, as needed, for the entire field. Areas to be tested
are allowed under the provisions of subsection (a)(3)(C) or (E). The
alternative to the Agricultural Lands Productivity Formula compares reclaimed
field crop yields against an average of the five most recent county yields
adjusted annually for weather variations.
The following substitution of the
annual pit base yield adjustment shall read:
County Success Factor
= Average of the Five Previous County Success Factors
b) The
person who conducts surface mining activities shall:
1) Conduct periodic measurements of vegetation, soils, and water
prescribed or approved by the Department, to identify if remedial actions are
necessary during the applicable period of liability specified in subsection
(a); and
2) Initiate a soil compaction and fertility testing plan, subject
to the approval of the Department, for areas that have incurred 5 unsuccessful
attempts to meet the production required by subsection (a)(3)(C) or (E) or 62
Ill. Adm. Code 1823.15, or shall initiate deep tillage under appropriate soil
moisture conditions on the areas, subject to the approval of the Department.
3) Permittees shall submit by February 15 of each year a report
of reclamation activities conducted during the previous calendar year, which
initiate or may alter the responsibility period or are specifically required by
the Department to evaluate a normal husbandry practice, using forms provided by
the Department. Examples of reclamation activities to be reported and/or
evaluated include but are not limited to crops used in temporary and permanent
seedings, grasses and legumes planted, trees and shrubs planted, soil
amendments added, and location and type of augmentation activities. The forms
shall be submitted with a copy of the approved post-mining land use and
capability map depicting the location of such activities. The map shall be
planned as a continuous map so the reclamation activities conducted each year
may be added and indicated on the map by the dates the activities were
conducted.
(Source: Amended at 47 Ill.
Reg. 2348, effective February 3, 2023)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.117 REVEGETATION: TREE, SHRUB, AND HERBACEOUS WILDLIFE VEGETATION
Section 1816.117
Revegetation: Tree, Shrub, and Herbaceous Wildlife Vegetation
a) For areas to be developed for fish and wildlife habitat
(including shelter belts), recreation, or forest products land uses, success of
vegetation shall be determined on the basis of tree and shrub population and
vegetative ground cover. Such parameters are described as follows:
1) Trees and shrubs that will be used in determining the success
of vegetation and the adequacy of plant arrangement shall have utility for the
approved post-mining land use. Tree and/or shrub population shall be
considered successful if it meets the population required in subsection (b)
with 90% statistical confidence (i.e., one-sided t test with a 0.10 alpha
error) during the fifth year of the responsibility period or later in the
responsibility period. On lands eligible for remining, the period of
responsibility shall be 2 full years. Trees and shrubs counted in determining
such success shall be healthy, e.g., not demonstrating abnormal growth,
coloring, leaf drop or disease. At the time of bond release such trees and
shrubs shall be alive, and shall have been in place for at least 3 growing
seasons, i.e. 3 years. On lands eligible for remining, trees and shrubs need
not have been in place for 3 years; however, such trees and shrubs shall not be
counted in determining success during the same calendar year in which they were
planted.
2) Vegetative ground cover shall not be less than required to
achieve the approved post-mining land use and shall be adequate to control
erosion and shall not be less than 70% during the last year of the
responsibility period.
3) Permanent roads, parking lots and similar impervious
structures on the revegetated area shall not require the planting of trees and
shrubs or herbaceous ground cover. Erosion control structures, including pond
embankments, shall not require the planting of trees and shrubs.
4) For purposes of this Section, herbaceous species means
grasses, legumes and nonleguminous forbs; woody plants means woody shrubs,
trees and vines; and ground cover means the area of ground covered by the
combined above ground parts of vegetation and the litter that is produced
naturally on site.
5) For purposes of this Section, normal husbandry and
conservation practices shall include pruning, disease, pest, vermin and
herbaceous vegetation control including mowing, replanting, and rill and gully
repairs. The replanting of trees and shrubs in areas described in Section
1816.116(a)(2)(C) shall be limited to 20% of the original approved planting
rate during the first year of the responsibility period and 10% of the original
approved planting rate during the second year of the responsibility period.
The repair of rills and gullies shall be limited to those approved as a normal
conservation practice under Section 1816.116(a)(2)(C), (D) and (E).
b) For areas where woody plants are used for fish and wildlife
habitat (including shelter belts), or recreation land uses, the area shall have
a minimum population of 250 trees or shrubs per acre. Planting arrangements
such as hedgerows, border plantings, clump plantings, shelterbelts, and open
herbaceous areas which increase diversity within wildlife areas may be approved
by the Department on a case-by-case basis prior to planting such areas. Where
woody plants are used for forest products land uses, the area shall have a
minimum population of 450 trees or shrubs per acre.
c) For areas planted to trees or shrubs including wildlife
habitat (including shelter belts), recreation, and forest products land uses,
the sampling procedure for measuring populations is described as follows:
1) The permittee shall submit a scale drawing or aerial
photograph delineating the fields to be sampled and the total number of acres
in each field. A one inch equals 500 (1:500) feet or larger scale shall be
used. Once field boundaries are established in a submittal, the boundaries
shall not be changed unless the Department approves a request in accordance
with 62 Ill. Adm. Code 1774.13.
2) One of the following circular plot sizes shall be selected by
the sample enumerator:
|
Plot
Size/Acres
|
Radius/Feet
|
|
1/160
|
9.31
|
|
1/120
|
10.75
|
|
1/100
|
11.78
|
|
1/90
|
12.41
|
|
1/80
|
13.17
|
|
1/70
|
14.07
|
|
1/60
|
15.20
|
|
1/50
|
16.65
|
|
1/40
|
18.61
|
|
1/30
|
21.50
|
|
1/20
|
26.33
|
|
1/10
|
37.24
|
|
1/5
|
52.66
|
|
1/4
|
58.88
|
3) The number of plots needed to sample 2.5% of the area will be
calculated employing the following formula:
Number of
Plots equals 2.5% multiplied by Sample Area in acres divided by plot size.
4) Based on the number of plots needed to be sampled and plot
size, locate transect lines an equal distance apart throughout the area to be
sampled. Position individual plots an equal distance apart along transect
lines. Determine the total length of all transect lines combined and then
divide by the total number of plots needed to be sampled. When an individual
plot is positioned within 60 feet of the boundary of the area to be sampled,
the location of the plot shall be moved perpendicular to the transect line
until the plot is 60 feet from the boundary of the area to be sampled or the
greatest distance possible where 60 feet cannot be achieved.
5) Sample each plot for compliance with subsections (a)(1) and
(b) and record live trees and/or shrubs and species.
6) Calculate population levels as follows:
A) Average number of live trees and/or shrubs per plot equals
total number of live trees and/or shrubs divided by number of plots; and
B) Number of live trees and/or shrubs per acre equals average
number of live trees and/or shrubs per plot multiplied by plot size
denominator.
7) Representatives of the Department shall administer all
sampling.
d) Vegetative ground cover shall be measured by the following
technique:
1) Twenty random points shall be identified in the area to be
tested.
2) A 20 feet engineer's tape shall be extended directly south of
each point. If the tape extends beyond the boundary of the area to be tested
or extends into an area where herbaceous ground cover has been controlled with
herbicides to minimize competition with woody plants, the tape shall be rotated
in 90 degree increments until the entire 20 feet length is within the boundary
of the area to be tested or area not treated with the herbicide.
3) A measurement shall be taken at each .2 foot increment
directly above or below the tape.
4) Ground cover shall be determined to be present if any
vegetation identified in subsection (a)(4) is measured at the increment.
5) A percentage of ground cover shall be established for the area
tested by taking the total number of measurements where ground cover was
determined to be present.
e) For areas where herbaceous vegetation plants are used for fish
and wildlife habitat (including shelterbelts), or recreation land uses,
vegetative ground cover of approved species shall not be less than required to
achieve the approved post-mining land use and shall be adequate to control
erosion and shall not be less than 70% during the last year of the
responsibility period. Planting arrangements such as hedgerows, border
plantings, clump plantings, shelterbelts, and open herbaceous areas that
increase diversity within wildlife areas may be approved by the Department on a
case-by-case basis prior to planting those areas.
(Source: Amended at 47 Ill. Reg. 2348, effective February 3, 2023)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.131 CESSATION OF OPERATIONS: TEMPORARY
Section 1816.131 Cessation
of Operations: Temporary
a) Each person who conducts surface mining activities shall
effectively secure surface facilities in areas in which there are no current
operations, but in which operations are to be resumed under an approved
permit. Temporary abandonment shall not relieve a person of their obligation
to comply with any provisions of the approved permit.
b) Before temporary cessation of mining and reclamation
operations for a period of thirty (30) days or more, or as soon as it is known
that a temporary cessation will extend beyond thirty (30) days, persons who
conduct surface mining activities shall submit to the Department a notice of
intention to cease or abandon mining and reclamation operations. This notice
shall include a statement of the exact number of acres which will have been
affected in the permit area, prior to such temporary cessation, the extent and
kind of reclamation of those areas which will have been accomplished, and
identification of the backfilling, regrading, revegetation, environmental
monitoring, and water treatment activities that will continue during the
temporary cessation.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.132 CESSATION OF OPERATIONS: PERMANENT
Section 1816.132 Cessation
of Operations: Permanent
a) Persons who cease surface mining activities permanently shall
close or backfill or otherwise permanently reclaim all affected areas, in
accordance with this Chapter and the permit approved by the Department.
b) All underground openings, equipment, structures, or other
facilities not required for monitoring, unless approved by the Department as
suitable for the post mining land use or environmental monitoring, shall be
removed and the affected land reclaimed.
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.133 POST-MINING LAND CAPABILITY
Section 1816.133 Post-Mining
Land Capability
a) All disturbed areas shall be restored in a timely manner to a
condition capable of supporting:
1) The uses which they were capable of supporting prior to any
mining; or
2) Higher or better uses of which there is a reasonable
likelihood of restoration: Provided that, no plan of restoration shall be
approved unless use of the area as proposed does not:
A) Present any actual or probable hazard to public health or
safety;
B) Pose any actual threat of diminution or pollution pursuant to
Section 1816.41; or
C) That the proposed land use following restoration is not found
to be impracticable or unreasonable by the Department or determined by the
Department to be inconsistent with land use policies and plans which are
applicable, or to involve unreasonable delay in implementation. No restoration
plan shall be approved if the proposed land use following reclamation is
violative of other applicable law.
b) The premining capability of land to which the post-mining land
capability is compared shall be the capabilities that the land would have
supported if it had not been previously mined and had been properly managed.
The post-mining land capability for land that has been previously mined and not
reclaimed shall be judged on the basis of the land capability that existed
prior to any mining: provided that, if the land cannot be reclaimed to the
land capability that existed prior to any mining because of the previously
mined condition, the post-mining land capability shall be judged on the basis
of the highest and the best capability that can be achieved which is compatible
with surrounding areas and does not require the disturbance of areas previously
unaffected by mining. Quantification of land capability is to be done on the
basis of acreage summaries for each land capability category, as defined in 62
Ill. Adm. Code 1701.5. The total acreage for each land capability category
should approximate the corresponding premining acreage. Changes in total
acreage from one land capability class to another shall require approval in
accordance with Section 1816.133(a)(2).
c) In determining the capability of affected land, the Department
shall use as a guideline the handbook entitled: Land Capability
Classification, Agriculture Handbook No. 210, published by the Natural
Resources Conservation Service of the U.S. Department of Agriculture. A copy of
this handbook shall be on file with the Department and the Secretary of State.
Interested persons may present views respecting the capability of affected
lands in the due course of the Department's review of the permit application.
(Source: Amended at 20 Ill. Reg. 2027, effective January 19, 1996)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.150 ROADS: GENERAL
Section 1816.150 Roads:
General
a) Road classification system.
1) Each road, as defined in 62 Ill. Adm. Code 1701.Appendix A,
shall be classified as either a primary road or an ancillary road.
2) A primary road is any road which is:
A) Used for transporting coal or spoil;
B) Frequently used for access or other purposes for a period in
excess of six months; or
C) To be retained for an approved post-mining land use.
3) An ancillary road is any road not classified as a primary
road.
b) Performance standards. Each road shall be located, designed,
constructed, reconstructed, used, maintained, and reclaimed so as to:
1) Control or prevent erosion, siltation, and the air pollution
attendant to erosion, including road dust as well as dust occurring on other
exposed surfaces, by measures such as vegetating, watering, using chemical or
other dust suppressants, or otherwise stabilizing all exposed surfaces in
accordance with current, prudent engineering practices;
2) Control or prevent damage to fish, wildlife, or their habitat
and related environmental values;
3) Control or prevent additional contributions of suspended
solids to stream flow or runoff outside the permit area;
4) Neither cause nor contribute to, directly or indirectly, the
violation of State or Federal water quality standards applicable to receiving
waters;
5) Refrain from seriously altering the normal flow of water in
streambeds or drainage channels;
6) Prevent or control damage to public or private property,
including the prevention or mitigation of adverse effects on lands within the
boundaries of units of the National Park System, the National Wildlife Refuge
System, the National System of Trails, the National Wilderness Preservation
System, the Wild and Scenic Rivers System, including designated study rivers,
and National Recreation Areas designated by Act of Congress; and
7) Use nonacid- and nontoxic-forming substances in road
surfacing.
c) Design and construction limits and establishment of design
criteria. To ensure environmental protection appropriate for their planned
duration and use, including consideration of the type and size of equipment
used, the design and construction or reconstruction of roads shall incorporate
appropriate limits for grade, width, surface materials, surface drainage
control, culvert placement, and culvert size in accordance with current,
prudent engineering practices, and any necessary design criteria established by
the Department.
d) Location.
1) No part of any road shall be located in the channel of an
intermittent or perennial stream unless specifically approved by the Department
in accordance with applicable sections of 62 Ill. Adm. Code 1816.41 through
1816.43 and 1816.57.
2) Roads shall be located to minimize downstream sedimentation
and flooding.
e) Maintenance.
1) A road shall be maintained to meet the performance standards
of this Section in accordance with prudent engineering and maintenance
practices.
2) A road damaged by a catastrophic event, such as a flood or
earthquake, shall be repaired as soon as is practicable after the damage has
occurred.
f) Reclamation. A road not to be retained under an approved
post-mining land use shall be reclaimed in accordance with the approved
reclamation plan as soon as practicable after it is no longer needed for mining
and reclamation operations. This reclamation shall include:
1) Closing the road to traffic;
2) Removing all bridges and culverts unless approved as part of
the post-mining land use;
3) Removing or otherwise disposing of road-surfacing materials
that are incompatible with the post-mining land use and revegetation
requirements;
4) Reshaping cut and fill slopes as necessary to be compatible
with the post-mining land use and to complement the natural drainage pattern of
the surrounding terrain;
5) Protecting the natural drainage patterns by installing dikes
or cross-drains as necessary to control surface runoff and erosion; and
6) Scarifying or ripping the roadbed, replacing topsoil or
substitute material, and revegetating disturbed surfaces in accordance with 62
Ill. Adm. Code 1816.22 and 1816.111 through 1816.117.
(Source: Amended at 15 Ill. Reg. 17166, effective January 1, 1992)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.151 PRIMARY ROADS
Section 1816.151 Primary
Roads
Primary roads shall meet the
requirements of Section 1816.150 and the additional requirements of this
Section.
a) Certification. The construction or reconstruction of primary
roads shall be certified in a report submitted to the Department by a qualified
registered professional engineer within thirty (30) days after completion of
construction. For purposes of this Section, completion of construction shall
mean the road is being used for its intended purpose as determined by the
Department. The professional engineer shall be experienced in the design and
construction of roads, as evidenced by the placement of a registered
professional engineer's seal on the report. The report shall indicate that the
primary road has been constructed or reconstructed as designed and in
accordance with the approved plan.
b) Safety Factor. Each primary road embankment shall be shown
to have a minimum static factor of safety of 1.3, or shall be designed in
compliance with the following design standards:
1) The embankment foundation area shall be cleared of all organic
material and the entire foundation surface shall be scarified;
2) If the natural slope of the foundation as measured at right
angles to the roadway center line is steeper than 8H:1V, the embankment shall
be benched into the existing slope beginning at the embankment toe and then
filled with compacted level lifts;
3) The embankment fill material shall be free of sod, large roots
and other large vegetative matter;
4) The fill shall be brought up in horizontal layers of such
thickness as required to facilitate compaction in accordance with prudent
construction standards;
5) The moisture content of the fill material shall be sufficient
to secure proper compaction;
6) The side slopes of the embankment shall be no steeper than
2H:1V;
7) Maximum fill height shall be twenty-five (25) feet as measured
from natural ground at the downstream toe to the top of the embankment;
8) Embankments shall have a minimum top width of (H + 35)/5,
where "H" is the embankment height as measured from natural ground at
the downstream toe to the top of the embankment, and shall be adequate for the
intended use.
c) Location.
1) To minimize erosion, a primary road shall be located, insofar
as is practicable, on the most stable available surface.
2) Fords of perennial or intermittent streams by primary roads
are prohibited unless they are specifically approved by the Department as
temporary routes during periods of road construction.
d) Drainage control. In accordance with the approved plan:
1) Each primary road shall be constructed or reconstructed, and
maintained to have adequate drainage control, using structures such as, but not
limited to bridges, ditches, cross-drains and ditch relief drains. The
drainage control system shall be designed to safely pass the peak runoff from a
10-year, 6-hour precipitation event, or greater event as specified by the
Department as necessary to ensure proper drainage control design in accordance
with prudent engineering practices;
2) Drainage pipes and culverts shall be installed as designed,
and maintained in a free and operating condition and to prevent or control
erosion at inlets and outlets;
3) Drainage ditches shall be constructed and maintained to
prevent uncontrolled drainage over the road surface and embankment;
4) Culverts shall be installed and maintained to sustain the
vertical soil pressure, the passive resistance of the foundation, and the
weight of vehicles using the road;
5) Natural stream channels shall not be altered or relocated
without the prior approval of the Department in accordance with applicable
sections of 62 Ill. Adm. Code 1816.41 through 1816.43 and 1816.57; and
6) Except as provided in subsection (c)(2) above, structures for
perennial or intermittent stream channel crossings shall be made using bridges,
culverts, low-water crossings, or other structures designed, constructed, and
maintained using current, prudent engineering practices. The Department shall
ensure that low-water crossings are designed, constructed and maintained to
prevent erosion of the structure or streambed and additional contributions of
suspended solids to streamflow.
e) Surfacing. Primary roads shall be surfaced with material
approved by the Department as being sufficiently durable for the anticipated
volume of traffic and the weight and speed of vehicles using the road.
(Source: Amended at 20 Ill. Reg. 2027, effective January 19, 1996)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.180 UTILITY INSTALLATIONS
Section 1816.180 Utility
Installations
All surface coal mining
operations shall be conducted in a manner which minimizes damage, destruction,
or disruption of services provided by oil, gas, and water wells; oil, gas, and
coal-slurry pipelines; railroads; electric and telephone lines; and water and
sewage lines which pass over, under, or through the permit area, unless
otherwise approved by the owner of those facilities and the Department.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.181 SUPPORT FACILITIES
Section 1816.181 Support
Facilities
a) Support facilities shall be operated in accordance with a
permit issued for the mine or coal preparation operation to which it is
incident or from which its operation results.
b) In addition to the other provisions of this Part, support
facilities shall be located, maintained, and used in a manner that:
1) Prevents or controls erosion and siltation, water pollution,
and damage to public or private property; and
2) To the extent possible using the best technology currently
available:
A) Minimizes damage to fish, wildlife and related environmental
values; and
B) Minimizes additional contributions of suspended solids to
streamflow or runoff outside the permit area. Any such contributions shall not
be in excess of the limitations of Section 1816.42.
(Source: Amended at 11 Ill. Reg. 8131, effective July 1, 1987)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.190 AFFECTED ACREAGE MAP
Section 1816.190 Affected
Acreage Map
a) On or before September 1 of each year every permit holder
shall submit to the Department reports and maps of affected areas.
b) Two copies, plus one additional copy for each county in which
the permit is located, of the reports and maps shall be submitted showing the
area affected during the fiscal year just ended and the extent of any auger
mining. One of the copies submitted shall contain the original signature of a
company official. The Department shall require the map to be executed by an
engineer registered in accordance with the Professional Engineering Practice
Act of 1989 [225 ILCS 325] or a land surveyor registered in accordance with the
Illinois Professional Land Surveyor Act of 1989 [225 ILCS 330]. The Department
shall then forward one copy to the county clerk.
c) The map shall be planned as a continuous map, so that the area
affected each year may be added and indicated on the map by the dates it was
affected. Reports as required by Section 1816.190 shall be submitted to the
Department on forms provided by the Department. Map scales shall be in
accordance with 62 Ill. Adm. Code 1779.25.
d) All maps shall show sections, township, range and county lines
coming within the scope of the map; access to the area from the nearest public
road and all weather roads within the mined area; and a title containing name
of the operator, address, scale of the map, by whom the map was drawn, name of
the surveyor or engineer.
(Source: Amended at 26 Ill. Reg. 4232, effective March 6, 2002)
Section 1816.APPENDIX A Agricultural Lands Productivity Formula (Repealed)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.APPENDIX A AGRICULTURAL LANDS PRODUCTIVITY FORMULA (REPEALED)
Section 1816.APPENDIX A Agricultural
Lands Productivity Formula (Repealed)
(Source: Repealed at 47 Ill.
Reg. 2348, effective February 3, 2023)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.TABLE A SUBSOIL ADJUSTMENTS (REPEALED)
Section 1816.TABLE A Subsoil
Adjustments (Repealed)
(Source: Repealed at 29 Ill.
Reg. 10599, effective July 7, 2005)
 | TITLE 62: MINING
CHAPTER I: DEPARTMENT OF NATURAL RESOURCES
PART 1816
PERMANENT PROGRAM PERFORMANCE STANDARDS –
SURFACE MINING ACTIVITIES
SECTION 1816.TABLE B SOIL VARIANCE CODES (REPEALED)
Section 1816.TABLE B Soil
Variance Codes (Repealed)
(Source: Repealed at 29 Ill.
Reg. 10599, effective July 7, 2005)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|