HB1051 - 104th General Assembly

CLOSED-LOOP WELL SETBACKS
Last Action
3/21/2025 - House: Rule 19(a) / Re-referred to Rules Committee
House Sponsors
Rep. Dave Vella and Anne Stava
Statutes Amended In Order of Appearance
415 ILCS 30/9.3 new
Synopsis As Introduced
Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.
Actions
Date Chamber Action
12/17/2024 House Prefiled with Clerk by Rep. Dave Vella
1/09/2025 House First Reading
1/09/2025 House Referred to Rules Committee
2/04/2025 House Assigned to Energy & Environment Committee
3/05/2025 House Added Co-Sponsor Rep. Anne Stava
3/06/2025 House To Local Government Subcommittee
3/21/2025 House Rule 19(a) / Re-referred to Rules Committee